HARRIS SS 261 (0110-06-151)
Items: 30
County: HARRIS
Length: 0.0000 MILES (4.4520 MILES)
Highway: SS 261
District: HOUSTON
Control Number: 0110-06-151
DBE Goal: 0.0%
Project: F 2B26(023)
Guaranty: $26,000.00
Time: 89 WORKING DAYS
Engineer's Estimate: $1,284,248.10
Date: 09/02/2026 1:00 PM CDT (17 days ago) Changed
Contract Number: 9263224
Type: SURFACING/ROADWAY RESTORATION
Project ID: A00140552
Contract Type: FEDERAL
Project Description: FULL DEPTH REPAIR, REPLACE EXISTING ACP PATCHES WITH EPOXY (SPALL REPAIR), DIAMOND GRINDING OUTSIDE LANE, UPGRADE GUARD RAIL, PAVEMENT MARKINGS, AND MEDIAN PAINT
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
PHILLIP GARLIN
NYEMB NYEMB
HARRIS SS 261 (0110-06-151)
Project Name: N/A
Project: F 2B26(023)
Engineer's Estimate: $937,804.97
Length: 0.0000 MILES (3.3982 MILES)
Project Class: REHABILITATION OF EXISTING ROAD
Limits From: IH 45
Limits To: CROSSTIMBERS
Project Description: FULL DEPTH REPAIR, REPLACE EXISTING ACP PATCHES WITH EPOXY (SPALL REPAIR), DIAMOND GRINDING OUTSIDE LANE, UPGRADE GUARD RAIL, PAVEMENT MARKINGS, AND MEDIAN PAINT
HARRIS SS 261 (0110-07-022)
Project Name: SS 261, W CROSSTIMBERS TO IH 610
Project: F 2B26(023)
Engineer's Estimate: $346,443.13
Length: N/A (1.0538 MILES)
Project Class: REHABILITATION OF EXISTING ROAD
Limits From: WEST CROSSTIMBERS ST
Limits To: IH 610
Project Description: FULL DEPTH REPAIR, REPLACE EXISTING ACP PATCHES WITH EPOXY (SPALL REPAIR), DIAMOND GRINDING OUTSIDE LANE, UPGRADE GUARD RAIL, PAVEMENT MARKINGS, AND MEDIAN PAINT
Bidders (6)
E
Engineer's Estimate
$1,284,248.10
$1,196,117.63
Over/Under Est:
-6.86%
-$88,130.47
$1,271,088.77
Over/Under Est:
-1.02%
-$13,159.33
Amt Left:
6.27%
$74,971.14
$1,463,129.62
Over/Under Est:
13.93%
$178,881.52
Amt Left:
22.32%
$267,011.99
Delta:
-15.11%
-$192,040.85
$1,499,485.41
Over/Under Est:
16.76%
$215,237.31
Amt Left:
25.36%
$303,367.78
Delta:
-2.48%
-$36,355.79
$2,227,447.31
Over/Under Est:
73.44%
$943,199.21
Amt Left:
86.22%
$1,031,329.68
Delta:
-48.55%
-$727,961.90
$2,690,396.65
Over/Under Est:
109.49%
$1,406,148.55
Amt Left:
124.93%
$1,494,279.02
Delta:
-20.78%
-$462,949.34
Bid Items & Bid Tabulations
30
Total
0 of 30
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
| Description | Amount |
|---|---|
| EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) | $2,000.00 |
| LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) | $6,500.00 |
| SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) | $2,500.00 |
| Total: | $11,000.00 |