REMOV CONC (PAV)
|
SY
|
172.000
|
$60.000
|
$20.000
|
$30.000
|
$69.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
30.000
|
$30.000
|
$20.000
|
$100.000
|
$37.500
|
|
|
REMOV CONC (MEDIANS)
|
SY
|
28.000
|
$100.000
|
$20.000
|
$50.000
|
$76.500
|
|
|
REMOV CONC (PAVERS)
|
SY
|
4.000
|
$100.000
|
$20.000
|
$120.000
|
$176.000
|
|
|
REMOV CONC (CURB)
|
LF
|
52.000
|
$20.000
|
$20.000
|
$20.000
|
$17.000
|
|
|
REMOV CONC (SAWCUT)
|
LF
|
1,100.000
|
$10.000
|
$20.000
|
$50.000
|
$76.000
|
|
|
REMOV CONC (RAIL)
|
LF
|
50.000
|
$100.000
|
$20.000
|
$60.000
|
$22.000
|
|
|
RMV (7") TRT/UNTRT BASE & ASPH PAV
|
SY
|
398.000
|
$50.000
|
$20.000
|
$20.000
|
$31.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
301.000
|
$20.000
|
$80.000
|
$40.000
|
$33.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
123.000
|
$30.000
|
$60.000
|
$30.000
|
$40.000
|
|
|
CONC PVMT (CRCP)(FAST TRK) (12")
|
SY
|
567.000
|
$200.000
|
$300.000
|
$200.000
|
$350.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
3.000
|
$1,500.000
|
$1,200.000
|
$1,200.000
|
$800.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
26.000
|
$1,000.000
|
$950.000
|
$800.000
|
$900.000
|
|
|
RAIL (TY SSTR)
|
LF
|
1,101.000
|
$300.000
|
$90.000
|
$100.000
|
$100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$128,000.000
|
$90,000.000
|
$170,000.000
|
$200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
2.000
|
$2,000.000
|
$7,500.000
|
$25,000.000
|
$10,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,090.000
|
$40.000
|
$3.000
|
$5.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,090.000
|
$20.000
|
$1.000
|
$2.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
120.000
|
$30.000
|
$8.000
|
$10.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
120.000
|
$15.000
|
$1.000
|
$4.000
|
$5.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
300.000
|
$75.000
|
$100.000
|
$100.000
|
$110.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
1,500.000
|
$30.000
|
$30.000
|
$30.000
|
$50.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
1,040.000
|
$50.000
|
$25.000
|
$20.000
|
$50.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$75.000
|
$25.000
|
$30.000
|
$50.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
300.000
|
$25.000
|
$1.000
|
$20.000
|
$30.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
1,200.000
|
$30.000
|
$25.000
|
$20.000
|
$30.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
1,040.000
|
$50.000
|
$10.000
|
$20.000
|
$30.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$75.000
|
$10.000
|
$20.000
|
$30.000
|
|
|
PORT CTB (CONNECTION HARDWARE)
|
EA
|
76.000
|
$55.000
|
$75.000
|
$40.000
|
$161.000
|
|
|
PORT CTB (PINNING)
|
EA
|
80.000
|
$30.000
|
$75.000
|
$80.000
|
$46.000
|
|
|
PERM CTB (TRAN SSCB TO SSTR) (MOD)
|
LF
|
30.000
|
$200.000
|
$280.000
|
$400.000
|
$350.000
|
|
|
LANDSCAPE PAVERS
|
SY
|
9.000
|
$100.000
|
$300.000
|
$200.000
|
$300.000
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
9.000
|
$100.000
|
$300.000
|
$20.000
|
$200.000
|
|
|
CONC CURB (DOWELED)
|
LF
|
96.000
|
$80.000
|
$60.000
|
$60.000
|
$82.000
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
1.000
|
$2,000.000
|
$8,000.000
|
$3,000.000
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$2,000.000
|
$3,000.000
|
$3,000.000
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
3.000
|
$2,000.000
|
$2,000.000
|
$2,000.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$50,000.000
|
$28,000.000
|
$30,000.000
|
$44,000.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
7.000
|
$1,542.000
|
$1,500.000
|
$2,000.000
|
$2,200.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
1,720.000
|
$35.000
|
$32.000
|
$50.000
|
$30.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
62.000
|
$28.420
|
$26.000
|
$30.000
|
$30.000
|
|
|
CONDT (RM) (3/4")
|
LF
|
660.000
|
$23.000
|
$20.000
|
$25.000
|
$30.000
|
|
|
CONDT (RM) (2")
|
LF
|
20.000
|
$36.000
|
$33.500
|
$60.000
|
$47.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
4,760.000
|
$2.500
|
$1.000
|
$10.000
|
$5.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)
|
LF
|
2,580.000
|
$54.640
|
$33.500
|
$40.000
|
$42.000
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
4,090.000
|
$5.000
|
$1.600
|
$2.000
|
$2.000
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
742.000
|
$1.250
|
$1.900
|
$2.000
|
$2.000
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
1,480.000
|
$2.000
|
$1.700
|
$4.000
|
$2.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
2.000
|
$1,194.000
|
$1,900.000
|
$2,500.000
|
$2,200.000
|
|
|
ELC SRV TY A 240/480 060(SS)SS(E)GC(U)
|
EA
|
1.000
|
$6,776.000
|
$12,000.000
|
$8,000.000
|
$11,400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$1,500.000
|
$1,000.000
|
$1,000.000
|
$1,200.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$500.000
|
$150.000
|
$150.000
|
$170.000
|
|
RE PM TY III (W)(6")(SLD)
|
LF
|
782.000
|
$5.000
|
$1.800
|
$2.000
|
$2.000
|
|
RE PM TY III (W)(8")(SLD)
|
LF
|
190.000
|
$8.000
|
$4.400
|
$2.000
|
$3.000
|
|
RE PM TY III (W)(8")(DOT)
|
LF
|
90.000
|
$10.000
|
$4.700
|
$4.000
|
$2.000
|
|
RE PM TY III (W)(12")(SLD)
|
LF
|
240.000
|
$10.000
|
$7.000
|
$4.000
|
$5.000
|
|
RE PM TY III (W)(24")(SLD)
|
LF
|
114.000
|
$20.000
|
$14.500
|
$12.000
|
$20.000
|
|
RE PM TY III (Y)(6")(SLD)
|
LF
|
2,350.000
|
$5.000
|
$1.800
|
$2.000
|
$2.000
|
|
RE PM TY III (Y)(6")(BRK)
|
LF
|
20.000
|
$10.000
|
$1.800
|
$2.000
|
$3.000
|
|
RE PM TY III (Y)(12")(SLD)
|
LF
|
17.000
|
$10.000
|
$7.000
|
$4.000
|
$5.000
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
4.000
|
$2,000.000
|
$550.000
|
$300.000
|
$600.000
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
2.000
|
$4,000.000
|
$475.000
|
$350.000
|
$500.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
67.000
|
$15.000
|
$9.000
|
$10.000
|
$30.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
16.000
|
$30.000
|
$9.000
|
$10.000
|
$15.000
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
2,581.000
|
$1.000
|
$0.650
|
$2.000
|
$2.000
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
427.000
|
$2.000
|
$3.750
|
$10.000
|
$10.000
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
2.000
|
$400.000
|
$90.000
|
$150.000
|
$120.000
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
2.000
|
$800.000
|
$90.000
|
$120.000
|
$120.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
3,152.000
|
$0.800
|
$0.050
|
$1.000
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
280.000
|
$1.000
|
$0.100
|
$1.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
422.000
|
$2.000
|
$0.150
|
$1.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
4.000
|
$100.000
|
$6.000
|
$50.000
|
$35.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
2.000
|
$200.000
|
$6.000
|
$50.000
|
$50.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
2.000
|
$600.000
|
$650.000
|
$1,000.000
|
$2,600.000
|
|
|
RELOCATE FIBER OPTIC CABLE
|
LF
|
2,390.000
|
$15.000
|
$4.500
|
$10.000
|
$13.000
|
|
Totals: |
$1,407,604.340
|
$926,322.200
|
$1,143,050.000
|