|
|
PREPARING ROW
|
STA
|
35.790
|
$10,000.000
|
$10,000.000
|
$10,000.000
|
$6,000.000
|
$5,980.000
|
$1,674.000
|
$12,570.000
|
$1,000.000
|
$6,000.000
|
$14,200.000
|
$13,000.000
|
$6,000.000
|
|
|
REMOV CONC (PAV)
|
SY
|
4,095.650
|
$10.500
|
$20.000
|
$7.000
|
$20.000
|
$13.160
|
$40.000
|
$15.000
|
$28.000
|
$20.000
|
$22.900
|
$20.000
|
$21.000
|
|
|
REMOV CONC (MOWSTRIP)
|
LF
|
532.680
|
$12.000
|
$5.000
|
$6.000
|
$10.000
|
$6.210
|
$4.440
|
$12.000
|
$12.000
|
$20.000
|
$4.700
|
$50.000
|
$40.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
101.670
|
$16.000
|
$3.000
|
$15.000
|
$20.000
|
$5.010
|
$16.070
|
$12.000
|
$37.000
|
$60.000
|
$13.400
|
$50.000
|
$120.000
|
|
|
REMOV CONC (CURB)
|
LF
|
1,108.770
|
$8.500
|
$0.100
|
$3.000
|
$1.000
|
$2.840
|
$4.550
|
$1.000
|
$6.500
|
$5.000
|
$2.700
|
$20.000
|
$14.000
|
|
|
RMV (7"-11") TRT/UNTRT BASE & ASPH PAV
|
SY
|
3,064.160
|
$17.000
|
$5.000
|
$7.000
|
$20.000
|
$6.860
|
$45.000
|
$2.750
|
$13.000
|
$20.000
|
$6.300
|
$20.000
|
$15.000
|
|
|
RMV (16"-20") TRT/UNTRT BASE & ASPH PAV
|
SY
|
4,750.030
|
$19.000
|
$10.000
|
$11.000
|
$30.000
|
$15.350
|
$60.000
|
$5.000
|
$22.000
|
$20.000
|
$12.500
|
$30.000
|
$15.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
5,793.000
|
$25.000
|
$22.000
|
$18.000
|
$30.000
|
$32.800
|
$36.000
|
$22.000
|
$50.000
|
$30.000
|
$39.400
|
$25.000
|
$47.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
471.000
|
$26.000
|
$20.000
|
$40.000
|
$25.400
|
$97.200
|
$31.400
|
$10.000
|
$14.000
|
$30.000
|
$40.400
|
$100.000
|
$55.000
|
|
|
BLOCK SODDING
|
SY
|
6,159.410
|
$6.000
|
$5.000
|
$9.000
|
$5.100
|
$4.500
|
$4.800
|
$4.500
|
$6.750
|
$5.000
|
$8.000
|
$10.000
|
$6.000
|
|
|
STRAW OR HAY MULCH
|
SY
|
1,293.480
|
$0.880
|
$0.300
|
$1.000
|
$0.300
|
$0.250
|
$0.270
|
$0.250
|
$1.250
|
$1.000
|
$1.000
|
$10.000
|
$0.300
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
61.590
|
$0.670
|
$0.500
|
$5.000
|
$0.200
|
$0.200
|
$0.210
|
$0.200
|
$6.000
|
$1.000
|
$5.000
|
$10.000
|
$0.250
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
1,231.880
|
$0.560
|
$0.300
|
$1.000
|
$0.300
|
$0.250
|
$0.270
|
$0.250
|
$1.200
|
$1.000
|
$1.000
|
$10.000
|
$0.300
|
|
|
FERTILIZER
|
AC
|
1.540
|
$1,500.000
|
$800.000
|
$1,800.000
|
$787.500
|
$750.000
|
$799.270
|
$750.000
|
$1,200.000
|
$2,000.000
|
$1,000.000
|
$5,000.000
|
$950.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
184.780
|
$90.000
|
$30.000
|
$30.000
|
$32.800
|
$49.060
|
$31.970
|
$60.000
|
$26.000
|
$100.000
|
$202.000
|
$25.000
|
$150.000
|
|
|
LIME (COM OR QK)(SLURRY) OR QK(DRY)
|
TON
|
162.060
|
$339.110
|
$350.000
|
$340.000
|
$354.300
|
$411.790
|
$352.000
|
$410.000
|
$400.000
|
$380.000
|
$330.000
|
$45.000
|
$400.000
|
|
|
LIME TRT (EXIST MATL)(8")
|
SY
|
12,004.310
|
$9.900
|
$6.500
|
$5.500
|
$4.400
|
$12.230
|
$5.000
|
$12.500
|
$9.000
|
$5.000
|
$4.000
|
$12.000
|
$19.000
|
|
|
CEM TRT(PLNT MX)(CL N)(TY E)(GR 4)(6")
|
SY
|
12,004.310
|
$15.000
|
$23.000
|
$23.000
|
$22.400
|
$27.110
|
$15.000
|
$23.500
|
$28.000
|
$18.000
|
$21.200
|
$35.000
|
$34.000
|
|
|
ASPHALT TRT BASE (GR 2)(PG 64)
|
TON
|
825.300
|
$130.000
|
$165.000
|
$150.000
|
$117.900
|
$136.000
|
$85.000
|
$165.000
|
$164.000
|
$160.000
|
$140.000
|
$200.000
|
$238.000
|
|
|
CONC PVMT (CRCP) (14")
|
SY
|
10,707.400
|
$110.000
|
$91.000
|
$115.000
|
$131.500
|
$126.380
|
$135.000
|
$131.170
|
$137.000
|
$130.000
|
$130.000
|
$160.000
|
$183.000
|
|
|
CONC PVMT (CRCP)(FAST TRK) (15")
|
SY
|
2,266.280
|
$210.000
|
$95.000
|
$135.000
|
$161.900
|
$148.260
|
$175.000
|
$154.600
|
$137.000
|
$160.000
|
$150.000
|
$200.000
|
$288.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
45.030
|
$650.000
|
$600.000
|
$550.000
|
$577.600
|
$526.130
|
$432.000
|
$1,200.000
|
$1,150.000
|
$450.000
|
$711.000
|
$550.000
|
$1,000.000
|
|
|
RAIL (TY SSTR)
|
LF
|
60.000
|
$70.000
|
$120.000
|
$55.000
|
$63.500
|
$470.760
|
$238.000
|
$182.000
|
$506.000
|
$100.000
|
$159.000
|
$300.000
|
$400.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$410,000.000
|
$395,000.000
|
$315,720.000
|
$400,000.000
|
$425,000.000
|
$400,000.000
|
$452,000.000
|
$486,000.000
|
$670,000.000
|
$505,000.000
|
$550,000.000
|
$630,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$15,000.000
|
$24,000.000
|
$1,800.000
|
$12,905.500
|
$12,000.000
|
$4,569.000
|
$9,000.000
|
$5,000.000
|
$10,000.000
|
$46,000.000
|
$15,000.000
|
$22,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
20.000
|
$73.000
|
$60.000
|
$100.000
|
$68.300
|
$886.090
|
$296.000
|
$200.000
|
$200.000
|
$80.000
|
$325.000
|
$150.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$245.860
|
$725.000
|
$675.000
|
$718.200
|
$737.120
|
$94.000
|
$1,000.000
|
$420.000
|
$400.000
|
$800.000
|
$550.000
|
$250.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,734.590
|
$5.000
|
$4.000
|
$3.000
|
$3.300
|
$3.750
|
$3.900
|
$6.170
|
$5.500
|
$4.000
|
$4.440
|
$4.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,734.590
|
$1.200
|
$1.000
|
$1.000
|
$0.900
|
$1.000
|
$1.000
|
$1.430
|
$1.250
|
$2.000
|
$1.000
|
$2.000
|
$1.800
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
29.000
|
$8.500
|
$12.000
|
$6.000
|
$6.200
|
$12.000
|
$12.400
|
$10.350
|
$15.000
|
$15.000
|
$9.000
|
$18.000
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
29.000
|
$2.000
|
$2.000
|
$2.000
|
$1.900
|
$2.000
|
$2.100
|
$1.220
|
$4.500
|
$2.000
|
$5.000
|
$9.000
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,078.000
|
$150.000
|
$150.000
|
$140.000
|
$101.600
|
$136.780
|
$187.000
|
$155.000
|
$160.000
|
$100.000
|
$137.000
|
$45.000
|
$200.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
3,120.000
|
$15.000
|
$14.000
|
$11.000
|
$13.300
|
$10.250
|
$7.000
|
$10.000
|
$15.000
|
$10.000
|
$13.000
|
$30.000
|
$30.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
3,150.000
|
$9.000
|
$10.000
|
$7.000
|
$11.700
|
$6.320
|
$1.900
|
$7.000
|
$4.000
|
$10.000
|
$8.900
|
$20.000
|
$23.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
3,120.000
|
$15.000
|
$12.000
|
$12.000
|
$13.300
|
$9.840
|
$6.200
|
$9.000
|
$15.000
|
$10.000
|
$7.100
|
$20.000
|
$25.000
|
|
|
PORT CTB (CONNECTION HARDWARE)
|
EA
|
205.000
|
$97.000
|
$100.000
|
$105.000
|
$68.300
|
$1.270
|
$30.000
|
$22.000
|
$117.000
|
$100.000
|
$100.000
|
$250.000
|
$75.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
1,106.910
|
$13.000
|
$10.000
|
$5.500
|
$5.000
|
$4.290
|
$10.300
|
$5.500
|
$4.250
|
$20.000
|
$12.800
|
$75.000
|
$16.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
525.000
|
$35.500
|
$30.000
|
$35.000
|
$33.600
|
$28.500
|
$34.100
|
$29.500
|
$35.000
|
$40.000
|
$29.500
|
$50.000
|
$38.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,000.000
|
$2,400.000
|
$2,200.000
|
$2,111.600
|
$2,465.000
|
$2,143.000
|
$2,250.000
|
$3,600.000
|
$2,200.000
|
$2,900.000
|
$1,850.000
|
$2,500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,500.000
|
$1,500.000
|
$1,500.000
|
$1,404.900
|
$1,600.000
|
$1,426.000
|
$1,400.000
|
$2,000.000
|
$1,500.000
|
$1,400.000
|
$1,850.000
|
$1,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
532.680
|
$4.060
|
$3.000
|
$3.150
|
$3.200
|
$5.000
|
$3.200
|
$2.500
|
$6.000
|
$5.000
|
$2.500
|
$3.000
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$300.000
|
$250.000
|
$215.000
|
$210.000
|
$500.000
|
$213.150
|
$250.000
|
$600.000
|
$220.000
|
$250.000
|
$500.000
|
$235.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$3,100.000
|
$3,200.000
|
$3,250.000
|
$3,255.000
|
$3,150.000
|
$3,304.000
|
$3,000.000
|
$3,800.000
|
$3,200.000
|
$3,000.000
|
$3,850.000
|
$3,600.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$300.000
|
$350.000
|
$215.000
|
$210.000
|
$300.000
|
$213.000
|
$250.000
|
$365.000
|
$220.000
|
$250.000
|
$1,500.000
|
$360.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
3.000
|
$2,420.000
|
$3,000.000
|
$3,500.000
|
$3,517.500
|
$4,650.000
|
$1,507.000
|
$3,000.000
|
$5,700.000
|
$4,000.000
|
$770.000
|
$6,500.000
|
$3,400.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,500.000
|
$1,200.000
|
$1,250.000
|
$1,890.000
|
$1,500.000
|
$620.000
|
$1,050.000
|
$1,800.000
|
$2,000.000
|
$885.000
|
$2,500.000
|
$1,430.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
4.000
|
$26,265.000
|
$35,000.000
|
$27,500.000
|
$27,090.000
|
$26,500.000
|
$27,876.000
|
$30,000.000
|
$32,000.000
|
$30,000.000
|
$35,000.000
|
$21,000.000
|
$35,000.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
930.000
|
$12.700
|
$11.000
|
$30.000
|
$14.700
|
$19.740
|
$14.460
|
$8.790
|
$17.000
|
$27.000
|
$16.000
|
$30.000
|
$22.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
616.000
|
$19.750
|
$14.000
|
$18.000
|
$16.800
|
$13.300
|
$16.530
|
$10.390
|
$19.000
|
$30.000
|
$12.000
|
$60.000
|
$15.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
520.000
|
$48.000
|
$60.000
|
$81.000
|
$50.400
|
$85.520
|
$49.590
|
$54.100
|
$58.000
|
$50.000
|
$80.000
|
$65.000
|
$95.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
4,900.000
|
$55.000
|
$2.000
|
$4.250
|
$1.100
|
$4.280
|
$1.030
|
$1.610
|
$1.250
|
$6.000
|
$4.000
|
$20.000
|
$4.750
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
6,150.000
|
$1.200
|
$1.000
|
$1.350
|
$1.600
|
$0.850
|
$1.550
|
$0.730
|
$2.000
|
$3.000
|
$1.250
|
$3.000
|
$2.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
620.000
|
$1.820
|
$1.500
|
$3.150
|
$2.200
|
$1.320
|
$2.170
|
$1.230
|
$2.500
|
$3.000
|
$3.000
|
$3.000
|
$4.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,240.000
|
$1.880
|
$1.700
|
$3.500
|
$2.300
|
$1.420
|
$2.270
|
$1.310
|
$3.000
|
$3.000
|
$3.250
|
$3.000
|
$4.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
3.000
|
$4,500.000
|
$6,400.000
|
$5,250.000
|
$4,305.000
|
$8,041.700
|
$4,236.000
|
$5,192.640
|
$5,000.000
|
$6,500.000
|
$5,100.000
|
$6,500.000
|
$9,000.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
2.000
|
$1,200.000
|
$2,500.000
|
$1,300.000
|
$1,365.000
|
$1,348.230
|
$1,343.000
|
$1,646.300
|
$1,600.000
|
$2,000.000
|
$1,005.000
|
$1,250.000
|
$1,500.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
45.000
|
$40.000
|
$30.000
|
$90.000
|
$85.600
|
$74.280
|
$84.000
|
$45.000
|
$99.000
|
$40.000
|
$81.550
|
$50.000
|
$84.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
747.000
|
$45.000
|
$35.000
|
$55.000
|
$48.800
|
$38.520
|
$48.000
|
$33.050
|
$56.500
|
$40.000
|
$30.000
|
$60.000
|
$39.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$875.000
|
$1,000.000
|
$1,400.000
|
$1,377.600
|
$1,100.000
|
$1,355.000
|
$1,100.000
|
$1,600.000
|
$1,500.000
|
$1,312.000
|
$1,150.000
|
$2,700.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,125.000
|
$1,200.000
|
$1,750.000
|
$1,677.900
|
$1,500.000
|
$1,651.000
|
$1,500.000
|
$1,900.000
|
$1,600.000
|
$1,598.000
|
$1,150.000
|
$3,250.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
11.000
|
$36.000
|
$30.000
|
$32.000
|
$29.400
|
$35.000
|
$28.930
|
$53.750
|
$34.000
|
$30.000
|
$28.000
|
$100.000
|
$82.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
4.000
|
$38.000
|
$30.000
|
$35.000
|
$29.400
|
$35.000
|
$28.930
|
$49.000
|
$34.000
|
$30.000
|
$28.000
|
$100.000
|
$82.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
9,231.000
|
$1.350
|
$1.300
|
$0.900
|
$0.900
|
$1.200
|
$0.840
|
$0.810
|
$1.000
|
$1.000
|
$0.810
|
$2.000
|
$1.300
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
3,981.000
|
$2.250
|
$2.000
|
$1.750
|
$1.700
|
$1.800
|
$1.650
|
$1.600
|
$2.000
|
$2.000
|
$1.600
|
$6.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)12"(SLD)
|
LF
|
3,581.000
|
$3.500
|
$5.500
|
$3.050
|
$3.200
|
$5.000
|
$3.100
|
$3.000
|
$4.000
|
$3.000
|
$3.000
|
$6.000
|
$5.500
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
7,855.000
|
$1.310
|
$1.300
|
$0.900
|
$0.900
|
$1.200
|
$0.880
|
$0.850
|
$1.000
|
$1.000
|
$0.850
|
$2.000
|
$1.300
|
|
RE PM TY III (W)(6")(SLD)
|
LF
|
4,102.000
|
$1.250
|
$1.200
|
$1.550
|
$1.600
|
$1.050
|
$1.550
|
$1.500
|
$2.000
|
$2.000
|
$1.500
|
$3.000
|
$1.100
|
|
RE PM TY III (W)(6")(BRK)
|
LF
|
340.000
|
$1.400
|
$2.750
|
$2.150
|
$2.100
|
$2.500
|
$2.070
|
$2.000
|
$2.500
|
$2.000
|
$2.000
|
$3.000
|
$3.000
|
|
RE PM TY III (W)(6")(DOT)
|
LF
|
168.000
|
$2.900
|
$3.300
|
$2.500
|
$2.100
|
$3.000
|
$2.070
|
$2.000
|
$2.500
|
$2.000
|
$2.000
|
$3.000
|
$3.300
|
|
RE PM TY III (W)(8")(SLD)
|
LF
|
1,242.000
|
$2.400
|
$1.800
|
$2.750
|
$2.600
|
$1.600
|
$2.580
|
$2.500
|
$3.000
|
$3.000
|
$2.500
|
$6.000
|
$1.800
|
|
RE PM TY III (W)(12")(SLD)
|
LF
|
2,797.000
|
$4.500
|
$4.000
|
$4.000
|
$3.300
|
$3.500
|
$3.200
|
$3.100
|
$4.000
|
$3.000
|
$3.100
|
$6.000
|
$3.800
|
|
RE PM TY III (Y)(6")(SLD)
|
LF
|
3,493.000
|
$0.900
|
$1.200
|
$1.400
|
$1.400
|
$1.050
|
$1.340
|
$1.300
|
$1.500
|
$2.000
|
$1.300
|
$3.000
|
$1.200
|
|
RE PM TY III (BLK)(6")(SHADOW)
|
LF
|
340.000
|
$1.600
|
$2.750
|
$5.750
|
$5.800
|
$2.500
|
$5.680
|
$5.500
|
$6.750
|
$6.000
|
$5.500
|
$3.000
|
$2.800
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
5.000
|
$290.000
|
$225.000
|
$300.000
|
$266.900
|
$200.000
|
$263.000
|
$254.150
|
$310.000
|
$300.000
|
$254.150
|
$250.000
|
$220.000
|
|
PREFAB PM TY C (W)(DBL ARROW)
|
EA
|
2.000
|
$410.000
|
$420.000
|
$475.000
|
$486.200
|
$380.000
|
$478.000
|
$463.000
|
$560.000
|
$500.000
|
$463.000
|
$500.000
|
$422.000
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
6.000
|
$370.000
|
$385.000
|
$400.000
|
$396.900
|
$350.000
|
$391.000
|
$378.000
|
$460.000
|
$500.000
|
$378.000
|
$250.000
|
$389.000
|
|
PREFAB PM TY C (MULTI)(SHIELD)
|
EA
|
3.000
|
$3,000.000
|
$3,100.000
|
$2,600.000
|
$2,099.200
|
$2,800.000
|
$2,065.000
|
$1,999.200
|
$2,400.000
|
$2,000.000
|
$1,999.200
|
$4,500.000
|
$3,100.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
216.000
|
$6.100
|
$6.500
|
$6.000
|
$5.300
|
$6.000
|
$5.170
|
$5.000
|
$6.000
|
$10.000
|
$5.000
|
$6.000
|
$6.700
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
19,960.000
|
$0.520
|
$0.550
|
$0.650
|
$0.500
|
$0.500
|
$0.460
|
$0.450
|
$0.500
|
$0.500
|
$0.450
|
$0.650
|
$0.600
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
4,617.000
|
$0.800
|
$0.800
|
$1.000
|
$0.800
|
$0.750
|
$0.830
|
$0.800
|
$1.000
|
$1.000
|
$0.800
|
$1.000
|
$0.850
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
5,045.000
|
$1.400
|
$1.100
|
$1.350
|
$1.100
|
$1.000
|
$1.030
|
$1.000
|
$1.200
|
$2.000
|
$1.000
|
$1.000
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
8,443.000
|
$0.100
|
$0.250
|
$0.150
|
$0.100
|
$0.200
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$3.000
|
$0.220
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,242.000
|
$1.500
|
$0.350
|
$0.250
|
$0.200
|
$0.300
|
$0.210
|
$0.200
|
$0.250
|
$0.200
|
$0.200
|
$6.000
|
$0.330
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
2,797.000
|
$0.200
|
$0.500
|
$0.400
|
$0.300
|
$0.400
|
$0.310
|
$0.300
|
$0.350
|
$0.300
|
$0.300
|
$6.000
|
$0.450
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
5.000
|
$11.250
|
$35.000
|
$17.500
|
$15.800
|
$30.000
|
$15.500
|
$15.000
|
$18.000
|
$12.000
|
$15.000
|
$250.000
|
$34.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
2.000
|
$13.000
|
$45.000
|
$35.000
|
$31.500
|
$40.000
|
$30.990
|
$30.000
|
$36.000
|
$30.000
|
$30.000
|
$500.000
|
$45.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
6.000
|
$11.750
|
$45.000
|
$20.000
|
$15.800
|
$40.000
|
$15.500
|
$15.000
|
$18.000
|
$15.000
|
$15.000
|
$250.000
|
$45.000
|
|
|
PAV SURF PREP FOR MRK (SHIELD)
|
EA
|
3.000
|
$40.000
|
$110.000
|
$110.000
|
$105.000
|
$100.000
|
$103.000
|
$100.000
|
$120.000
|
$100.000
|
$100.000
|
$100.000
|
$111.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$2,500.000
|
$500.000
|
$2,000.000
|
$694.100
|
$3,487.190
|
$4,766.000
|
$1,250.000
|
$500.000
|
$5,000.000
|
$1,000.000
|
$1,000.000
|
$1,500.000
|
|
|
LITTER REMOVAL
|
CYC
|
11.000
|
$1,720.140
|
$1,000.000
|
$850.000
|
$962.900
|
$2,939.840
|
$5,606.000
|
$1,250.000
|
$350.000
|
$2,500.000
|
$757.000
|
$2,000.000
|
$1,600.000
|
|
|
CLEANING / SWEEPING (DIRECT CONNECTOR)
|
CYC
|
11.000
|
$2,500.000
|
$500.000
|
$1,800.000
|
$546.000
|
$1,551.470
|
$4,427.000
|
$4,500.000
|
$500.000
|
$150.000
|
$420.000
|
$2,000.000
|
$3,000.000
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
192.000
|
$180.000
|
$90.000
|
$170.000
|
$52.500
|
$24.980
|
$51.660
|
$78.310
|
$61.000
|
$40.000
|
$50.000
|
$100.000
|
$62.000
|
|
|
FIBER OPTIC CBL(SINGLE-MODE)(144 FIBER)
|
LF
|
6,430.000
|
$6.000
|
$3.500
|
$5.000
|
$5.000
|
$3.390
|
$4.910
|
$2.740
|
$6.000
|
$4.000
|
$4.750
|
$10.000
|
$3.750
|
|
|
FIBER OPTIC PATCH PANEL (144 POSITIONS)
|
EA
|
1.000
|
$3,300.000
|
$3,000.000
|
$12,500.000
|
$4,042.500
|
$6,355.990
|
$3,978.000
|
$2,609.220
|
$4,700.000
|
$6,000.000
|
$10,500.000
|
$2,500.000
|
$7,000.000
|
|
Totals: |
$4,638,209.375
|
$3,950,379.325
|
$3,954,794.182
|
$4,298,538.421
|
$4,408,972.106
|
$4,456,695.041
|
$4,522,062.148
|
$4,587,698.348
|
$4,591,721.620
|
$5,089,370.491
|
$6,024,358.700
|
$6,428,531.558
|