REMOVING CONC (PAV)
|
SY
|
33,279.000
|
$7.000
|
$4.000
|
$6.000
|
$7.000
|
$5.000
|
$12.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
3,165.000
|
$6.500
|
$4.000
|
$2.000
|
$2.500
|
$1.500
|
$12.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,828.000
|
$7.000
|
$4.000
|
$3.000
|
$2.500
|
$5.000
|
$14.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
34,420.000
|
$8.000
|
$2.000
|
$3.000
|
$2.500
|
$1.500
|
$5.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-14")
|
SY
|
3,079.000
|
$10.000
|
$2.000
|
$3.000
|
$2.500
|
$1.500
|
$10.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(8")
|
SY
|
1,199.000
|
$9.000
|
$2.000
|
$3.000
|
$2.500
|
$1.500
|
$7.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,647.000
|
$15.000
|
$18.000
|
$10.000
|
$24.500
|
$15.000
|
$12.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
3,604.000
|
$15.000
|
$20.000
|
$10.000
|
$52.000
|
$4.000
|
$12.000
|
|
|
BLOCK SODDING
|
SY
|
4,192.000
|
$3.500
|
$4.000
|
$3.000
|
$7.000
|
$4.000
|
$3.000
|
|
|
FERTILIZER
|
AC
|
0.895
|
$700.000
|
$770.000
|
$500.000
|
$3,000.000
|
$400.000
|
$1,000.000
|
|
|
VEGETATIVE WATERING
|
MG
|
107.400
|
$15.000
|
$15.000
|
$25.000
|
$180.000
|
$30.000
|
$16.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
6,884.000
|
$4.000
|
$4.000
|
$4.000
|
$10.900
|
$5.000
|
$3.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
93.000
|
$200.000
|
$164.000
|
$165.000
|
$200.000
|
$160.000
|
$200.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
32,267.000
|
$90.000
|
$89.500
|
$89.000
|
$85.000
|
$97.750
|
$126.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(14")
|
SY
|
2,156.000
|
$100.000
|
$90.000
|
$98.000
|
$102.000
|
$105.000
|
$170.000
|
|
|
STRUCT EXCAV
|
CY
|
26.000
|
$50.000
|
$20.000
|
$20.000
|
$38.000
|
$25.000
|
$130.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
33.000
|
$50.000
|
$50.000
|
$50.000
|
$54.000
|
$45.000
|
$65.000
|
|
|
INLET (STG II)(TY B)
|
EA
|
14.000
|
$2,000.000
|
$1,600.000
|
$2,000.000
|
$1,400.000
|
$2,250.000
|
$5,500.000
|
|
|
INLET (STG II)(TY BB)
|
EA
|
3.000
|
$4,000.000
|
$1,700.000
|
$2,607.500
|
$2,000.000
|
$2,800.000
|
$7,000.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
18.000
|
$1,000.000
|
$380.000
|
$500.000
|
$520.000
|
$1,650.000
|
$650.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$447,532.000
|
$400,000.000
|
$480,000.000
|
$460,000.000
|
$515,000.000
|
$315,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$15,000.000
|
$7,000.000
|
$27,700.000
|
$20,000.000
|
$10,000.000
|
$10,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
651.000
|
$6.000
|
$4.500
|
$5.000
|
$7.000
|
$5.750
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
36.000
|
$8.000
|
$5.000
|
$10.000
|
$12.500
|
$5.750
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
687.000
|
$4.000
|
$2.500
|
$1.000
|
$2.000
|
$1.000
|
$1.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
17,888.000
|
$5.000
|
$3.750
|
$4.000
|
$3.650
|
$5.500
|
$18.000
|
|
|
DRIVEWAYS (CONC) (FAST TRACK)
|
SY
|
1,837.000
|
$70.000
|
$98.000
|
$72.000
|
$70.000
|
$100.000
|
$90.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
3,956.000
|
$60.000
|
$50.000
|
$50.000
|
$60.000
|
$80.000
|
$55.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
175.000
|
$25.000
|
$24.000
|
$30.000
|
$23.000
|
$30.000
|
$35.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
175.000
|
$5.000
|
$2.000
|
$5.000
|
$3.000
|
$5.000
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$3,000.000
|
$3,000.000
|
$2,625.000
|
$1,700.000
|
$2,625.000
|
$3,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$500.000
|
$225.000
|
$350.000
|
$300.000
|
$350.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$500.000
|
$550.000
|
$500.000
|
$500.000
|
$495.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$510.000
|
$830.000
|
$700.000
|
$800.000
|
$690.000
|
$750.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
19.000
|
$450.000
|
$415.000
|
$420.000
|
$400.000
|
$420.000
|
$1,000.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
2.000
|
$520.000
|
$530.000
|
$505.000
|
$480.000
|
$505.000
|
$650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$100.000
|
$90.000
|
$75.000
|
$85.000
|
$75.000
|
$125.000
|
|
|
RELOCATE LRSA
|
EA
|
1.000
|
$3,200.000
|
$5,200.000
|
$4,000.000
|
$2,000.000
|
$4,000.000
|
$20,000.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
13,289.000
|
$0.500
|
$0.700
|
$0.700
|
$0.600
|
$0.620
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
6.000
|
$100.000
|
$94.000
|
$100.000
|
$85.000
|
$85.000
|
$125.000
|
|
|
WK ZN PAV MRK REMOV (W)(DBL ARROW)
|
EA
|
2.000
|
$150.000
|
$135.000
|
$130.000
|
$125.000
|
$125.000
|
$250.000
|
|
|
WK ZN PAV MRK REMOV (W)(TPL ARROW)
|
EA
|
8.000
|
$200.000
|
$150.000
|
$140.000
|
$135.000
|
$135.000
|
$375.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
3.000
|
$200.000
|
$145.000
|
$140.000
|
$135.000
|
$135.000
|
$200.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
21,641.000
|
$0.800
|
$0.700
|
$0.700
|
$0.600
|
$0.620
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
1.000
|
$150.000
|
$575.000
|
$550.000
|
$520.000
|
$518.400
|
$300.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
1.000
|
$250.000
|
$510.000
|
$500.000
|
$460.000
|
$462.850
|
$325.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
230.000
|
$10.000
|
$4.250
|
$4.000
|
$3.800
|
$3.800
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
5.000
|
$50.000
|
$40.000
|
$50.000
|
$35.000
|
$35.000
|
$75.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
4.000
|
$100.000
|
$55.000
|
$50.000
|
$50.000
|
$50.000
|
$100.000
|
|
|
ELIM EXT PAV MRK & MRKS (TPL ARROW)
|
EA
|
6.000
|
$150.000
|
$83.000
|
$80.000
|
$75.000
|
$75.000
|
$125.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
3.000
|
$200.000
|
$50.000
|
$50.000
|
$45.000
|
$45.000
|
$125.000
|
|
|
ELIM EXT PAV MRK & MRKS (JIGGLE)
|
EA
|
16.000
|
$150.000
|
$10.000
|
$9.000
|
$8.500
|
$8.500
|
$125.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
23,850.000
|
$0.100
|
$0.050
|
$0.050
|
$0.040
|
$0.040
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
835.000
|
$0.100
|
$0.060
|
$0.100
|
$0.050
|
$0.050
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,310.000
|
$0.200
|
$0.120
|
$0.100
|
$0.100
|
$0.100
|
$0.750
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
335.000
|
$0.400
|
$0.220
|
$0.200
|
$0.200
|
$0.200
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
1.000
|
$30.000
|
$26.000
|
$25.000
|
$25.000
|
$25.000
|
$60.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
1.000
|
$50.000
|
$28.000
|
$25.000
|
$25.000
|
$25.000
|
$60.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
520.000
|
$84.000
|
$50.000
|
$55.000
|
$95.000
|
$25.000
|
$90.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
8,975.000
|
$0.500
|
$0.650
|
$0.600
|
$0.600
|
$0.580
|
$1.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
2,780.000
|
$0.600
|
$0.650
|
$0.600
|
$0.600
|
$0.580
|
$1.000
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
835.000
|
$1.000
|
$1.600
|
$2.000
|
$1.400
|
$1.420
|
$1.500
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
1,310.000
|
$3.000
|
$3.500
|
$3.200
|
$3.150
|
$3.150
|
$3.500
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
335.000
|
$6.000
|
$6.750
|
$6.200
|
$6.150
|
$6.150
|
$8.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
9,320.000
|
$2.000
|
$0.650
|
$0.700
|
$0.600
|
$0.580
|
$1.250
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
2,780.000
|
$1.000
|
$1.000
|
$1.000
|
$0.900
|
$0.920
|
$1.250
|
|
|
TMA (STATIONARY)
|
DAY
|
50.000
|
$200.000
|
$260.000
|
$250.000
|
$350.000
|
$250.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
21.000
|
$200.000
|
$185.000
|
$500.000
|
$600.000
|
$350.000
|
$450.000
|
|
Totals: |
$5,105,979.300
|
$4,552,329.650
|
$4,838,598.000
|
$4,944,945.300
|
$5,117,744.150
|
$6,664,133.900
|