REMOVING CONC (CURB)
|
LF
|
30.000
|
$5.000
|
$23.000
|
$50.000
|
$225.000
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
62.000
|
$62.000
|
$300.000
|
$500.000
|
$755.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
8,727.000
|
$115.000
|
$137.500
|
$140.000
|
$131.000
|
|
|
PLAN & TEXT ASPH CONC PAV (2")
|
SY
|
79,342.000
|
$1.020
|
$0.250
|
$3.750
|
$5.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
28.000
|
$522.000
|
$750.000
|
$850.000
|
$1,250.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$134,280.200
|
$69,000.000
|
$200,000.000
|
$200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
2.000
|
$15,000.000
|
$7,800.000
|
$80,000.000
|
$123,123.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
84.000
|
$6.000
|
$15.000
|
$25.000
|
$36.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
84.000
|
$0.830
|
$6.000
|
$10.000
|
$18.000
|
|
|
PTB (DES SOURCE)(TY P&P)
|
LF
|
30.000
|
$50.000
|
$60.000
|
$100.000
|
$272.000
|
|
|
PTB (STKPL)(TY P&P)
|
LF
|
30.000
|
$50.000
|
$60.000
|
$75.000
|
$272.000
|
|
|
CONC CURB (DOWEL)
|
LF
|
30.000
|
$15.000
|
$40.000
|
$50.000
|
$139.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
175.000
|
$40.000
|
$24.000
|
$23.000
|
$57.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
7.000
|
$2,000.000
|
$2,100.000
|
$2,300.000
|
$3,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
194.000
|
$3.200
|
$3.500
|
$3.000
|
$15.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$250.000
|
$350.000
|
$400.000
|
$1,000.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
7.000
|
$2,500.000
|
$3,200.000
|
$3,000.000
|
$4,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
7.000
|
$320.000
|
$350.000
|
$300.000
|
$800.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
7.000
|
$50.000
|
$86.000
|
$75.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
21.000
|
$40.000
|
$29.000
|
$30.000
|
$75.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
32,667.000
|
$0.200
|
$0.170
|
$0.200
|
$0.150
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
|
LF
|
132.000
|
$0.270
|
$1.150
|
$1.000
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
38,535.000
|
$0.200
|
$0.170
|
$0.200
|
$0.150
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
9,153.000
|
$0.350
|
$0.350
|
$0.600
|
$0.330
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(LNDP)
|
LF
|
2,919.000
|
$0.650
|
$0.900
|
$0.750
|
$0.770
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
4,053.000
|
$0.950
|
$0.650
|
$0.750
|
$0.560
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
33.000
|
$60.000
|
$86.000
|
$75.000
|
$77.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(DBL ARW)
|
EA
|
3.000
|
$64.000
|
$98.000
|
$90.000
|
$87.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
33.000
|
$55.000
|
$86.000
|
$75.000
|
$77.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
39,090.000
|
$0.450
|
$0.170
|
$0.200
|
$0.150
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
44.000
|
$1.500
|
$1.750
|
$1.500
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
3,051.000
|
$1.500
|
$1.000
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
973.000
|
$2.900
|
$1.750
|
$1.650
|
$1.500
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,351.000
|
$3.000
|
$1.750
|
$1.650
|
$1.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
11.000
|
$100.000
|
$150.000
|
$125.000
|
$128.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
1.000
|
$150.000
|
$200.000
|
$185.000
|
$189.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
11.000
|
$125.000
|
$150.000
|
$125.000
|
$128.000
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
10,889.000
|
$0.650
|
$0.600
|
$0.600
|
$0.560
|
|
|
PAVEMENT SEALER 6"
|
LF
|
47,697.000
|
$0.120
|
$0.100
|
$0.080
|
$0.080
|
|
|
PAVEMENT SEALER 8"
|
LF
|
3,051.000
|
$0.300
|
$0.160
|
$0.140
|
$0.150
|
|
|
PAVEMENT SEALER 12"
|
LF
|
2,324.000
|
$1.000
|
$0.180
|
$0.160
|
$0.150
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
11.000
|
$25.000
|
$25.000
|
$20.000
|
$25.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
11.000
|
$28.000
|
$25.000
|
$20.000
|
$25.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
1.000
|
$40.000
|
$40.000
|
$35.000
|
$36.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
10,889.000
|
$0.500
|
$0.600
|
$0.550
|
$0.530
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
12,845.000
|
$0.650
|
$0.550
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
13,030.000
|
$0.500
|
$0.550
|
$0.500
|
$0.500
|
|
PREFAB PAV MRK TY C (MULTI) (SHIELD)
|
EA
|
4.000
|
$1,800.000
|
$1,300.000
|
$1,100.000
|
$1,250.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
903.000
|
$4.500
|
$5.000
|
$4.250
|
$4.500
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
47,653.000
|
$0.070
|
$0.010
|
$0.010
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
3,051.000
|
$0.070
|
$0.020
|
$0.020
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
2,324.000
|
$0.250
|
$0.060
|
$0.050
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
11.000
|
$11.000
|
$6.000
|
$5.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
1.000
|
$20.000
|
$11.500
|
$10.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
11.000
|
$16.000
|
$6.000
|
$5.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRKS (SHIELD)
|
EA
|
4.000
|
$75.000
|
$11.500
|
$10.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
903.000
|
$0.550
|
$0.250
|
$0.200
|
$0.250
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
1.230
|
$200.000
|
$4,200.000
|
$30,000.000
|
$41,000.000
|
|
|
CONCRETE RAIL REPAIR (TYPE 551)
|
LF
|
8.000
|
$1,500.000
|
$200.000
|
$750.000
|
$2,075.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
291.000
|
$45.000
|
$40.000
|
$190.000
|
$75.000
|
|
|
TMA (STATIONARY)
|
EA
|
18.000
|
$350.000
|
$3,500.000
|
$3,000.000
|
$1,500.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
490.000
|
$45.000
|
$29.000
|
$100.000
|
$75.000
|
|
Totals: |
$1,480,366.520
|
$1,581,261.010
|
$2,279,653.990
|
$2,402,448.120
|