|
|
REMOV CONC (MOWSTRIP)
|
LF
|
3,175.000
|
$20.000
|
$18.000
|
$5.000
|
$8.000
|
$12.500
|
$18.000
|
$35.000
|
|
|
REMOV CONC (CURB)
|
LF
|
1,179.000
|
$1.000
|
$52.300
|
$5.000
|
$6.000
|
$9.250
|
$20.000
|
$20.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
66,910.800
|
$155.000
|
$170.000
|
$195.000
|
$217.000
|
$243.000
|
$257.000
|
$235.000
|
|
|
PLANE CONC PAV(0" TO 1.5")
|
SY
|
24,386.100
|
$12.000
|
$6.500
|
$18.000
|
$7.000
|
$10.000
|
$6.000
|
$35.000
|
|
|
FULL-DEPTH REPAIR CRCP (VAR DEPTH)
|
CY
|
7,237.600
|
$820.000
|
$965.000
|
$750.000
|
$850.000
|
$1,145.000
|
$1,091.000
|
$1,100.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
137.200
|
$745.000
|
$1,000.000
|
$366.000
|
$900.000
|
$620.000
|
$374.000
|
$1,400.000
|
|
|
RAIL (CLF-RO)
|
LF
|
360.000
|
$160.000
|
$175.000
|
$108.000
|
$110.000
|
$195.000
|
$211.000
|
$150.000
|
|
|
ADJUSTING INLETS
|
EA
|
7.000
|
$929.000
|
$900.000
|
$618.000
|
$1,300.000
|
$750.000
|
$2,094.000
|
$3,200.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,889,512.830
|
$1,000,000.000
|
$1,250,000.000
|
$2,700,000.000
|
$225,000.000
|
$200,451.000
|
$2,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$3,462.000
|
$1,365.000
|
$6,750.000
|
$100,000.000
|
$35,000.000
|
$52,847.000
|
$50,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
390.000
|
$131.000
|
$130.000
|
$180.000
|
$106.000
|
$120.000
|
$112.000
|
$300.000
|
|
|
TMA (STATIONARY)
|
DAY
|
390.000
|
$220.000
|
$750.000
|
$3,100.000
|
$346.000
|
$285.000
|
$294.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
390.000
|
$120.000
|
$1.000
|
$400.000
|
$675.000
|
$1,250.000
|
$757.000
|
$350.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
1,179.000
|
$17.920
|
$74.000
|
$80.000
|
$13.000
|
$18.000
|
$5.000
|
$75.000
|
|
|
CONC CURB (DOWEL)
|
LF
|
471.600
|
$65.000
|
$144.000
|
$195.000
|
$41.500
|
$20.000
|
$12.000
|
$75.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
91,489.000
|
$0.130
|
$0.150
|
$0.430
|
$0.170
|
$0.150
|
$0.170
|
$0.280
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,175.000
|
$25.000
|
$32.000
|
$15.360
|
$27.150
|
$23.500
|
$30.000
|
$28.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
46.000
|
$1,815.000
|
$1,500.000
|
$1,512.000
|
$1,960.000
|
$1,912.500
|
$2,319.000
|
$2,850.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
46.000
|
$1,575.000
|
$1,300.000
|
$2,000.000
|
$1,115.000
|
$1,414.000
|
$1,791.000
|
$1,600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,175.000
|
$2.200
|
$8.000
|
$0.400
|
$2.000
|
$3.400
|
$5.000
|
$4.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
46.000
|
$164.000
|
$311.000
|
$25.580
|
$230.000
|
$131.250
|
$294.000
|
$150.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
46.000
|
$164.000
|
$465.000
|
$50.870
|
$260.000
|
$157.500
|
$294.000
|
$170.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
46.000
|
$2,900.000
|
$2,450.000
|
$2,500.000
|
$3,200.000
|
$3,196.200
|
$3,434.000
|
$3,805.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
46.000
|
$164.000
|
$311.000
|
$51.000
|
$330.000
|
$236.250
|
$352.000
|
$250.000
|
|
|
CHAIN LINK FENCE (INSTALL) (8')
|
LF
|
360.000
|
$35.000
|
$0.100
|
$114.000
|
$41.800
|
$36.750
|
$173.000
|
$50.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
50.000
|
$20.000
|
$21.000
|
$13.690
|
$13.160
|
$14.000
|
$25.000
|
$26.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
1,050.000
|
$30.000
|
$22.000
|
$12.750
|
$12.250
|
$13.000
|
$26.000
|
$27.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,640.000
|
$1.500
|
$1.850
|
$1.660
|
$1.600
|
$1.700
|
$2.000
|
$2.300
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
14.000
|
$1,500.000
|
$1,375.000
|
$1,296.000
|
$1,245.350
|
$1,308.000
|
$1,641.000
|
$1,700.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
100.000
|
$39.000
|
$25.000
|
$26.010
|
$34.700
|
$68.250
|
$23.000
|
$80.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$817.000
|
$625.000
|
$650.000
|
$695.000
|
$695.100
|
$814.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
10.000
|
$815.000
|
$825.000
|
$858.000
|
$945.000
|
$848.400
|
$894.000
|
$1,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
8.000
|
$152.000
|
$110.000
|
$114.000
|
$95.000
|
$78.750
|
$100.000
|
$90.000
|
|
|
IN SRSS & AM (RAIL)(130 MPH)(P MOUNT)
|
EA
|
1.000
|
$6,400.000
|
$7,125.000
|
$7,413.000
|
$4,125.000
|
$4,783.800
|
$5,284.000
|
$5,600.000
|
|
|
IN SRSS & AM (RAIL)(130 MPH)(U-BM MNT)
|
EA
|
1.000
|
$10,330.000
|
$6,150.000
|
$6,399.000
|
$4,285.000
|
$4,783.800
|
$14,089.000
|
$5,600.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
|
EA
|
317.000
|
$8.000
|
$21.000
|
$21.850
|
$24.000
|
$18.900
|
$29.000
|
$22.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
64.000
|
$25.000
|
$30.000
|
$31.210
|
$30.000
|
$24.150
|
$53.000
|
$28.750
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
|
EA
|
62.000
|
$8.000
|
$25.000
|
$26.010
|
$24.000
|
$18.900
|
$29.000
|
$22.500
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
|
EA
|
349.000
|
$7.000
|
$30.000
|
$31.210
|
$30.000
|
$24.150
|
$34.000
|
$28.750
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
9.000
|
$45.000
|
$30.000
|
$31.210
|
$30.000
|
$24.150
|
$53.000
|
$28.750
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-A
|
EA
|
769.000
|
$6.000
|
$4.000
|
$4.160
|
$2.000
|
$4.200
|
$2.000
|
$4.400
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
932.000
|
$6.000
|
$4.000
|
$4.160
|
$2.000
|
$4.200
|
$2.000
|
$4.400
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
4,637.000
|
$6.000
|
$3.000
|
$3.120
|
$2.000
|
$3.150
|
$2.000
|
$3.300
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
83,048.000
|
$0.330
|
$0.350
|
$0.370
|
$0.420
|
$0.380
|
$0.490
|
$0.400
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
97,576.000
|
$0.330
|
$0.350
|
$0.370
|
$0.420
|
$0.380
|
$0.490
|
$0.400
|
|
|
WK ZN PAV MRK REMOV (W)(ENTR GORE)
|
EA
|
21.000
|
$273.150
|
$200.000
|
$208.000
|
$835.060
|
$210.000
|
$980.000
|
$220.000
|
|
|
WK ZN PAV MRK REMOV (W)(EXIT GORE)
|
EA
|
21.000
|
$273.150
|
$350.000
|
$364.000
|
$553.120
|
$367.500
|
$649.000
|
$385.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
52,400.000
|
$0.330
|
$0.360
|
$0.370
|
$0.420
|
$0.380
|
$0.490
|
$0.400
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
1,058.000
|
$2.000
|
$2.300
|
$2.390
|
$2.250
|
$2.420
|
$3.000
|
$2.400
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
24,377.000
|
$2.050
|
$1.000
|
$1.040
|
$1.750
|
$1.200
|
$2.000
|
$1.100
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
4,152.000
|
$5.100
|
$3.000
|
$3.120
|
$3.750
|
$3.150
|
$4.000
|
$3.300
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
7,496.000
|
$5.900
|
$3.000
|
$3.120
|
$3.750
|
$3.150
|
$4.000
|
$3.300
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
558.000
|
$7.250
|
$6.000
|
$6.240
|
$7.750
|
$6.300
|
$9.000
|
$6.600
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
2,084.000
|
$1.800
|
$1.000
|
$1.040
|
$1.750
|
$1.050
|
$2.000
|
$1.100
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
1,185.000
|
$3.550
|
$6.000
|
$6.240
|
$3.750
|
$6.300
|
$4.000
|
$6.600
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
1,614.000
|
$0.900
|
$2.000
|
$2.080
|
$0.980
|
$2.100
|
$1.000
|
$2.200
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
1,653.000
|
$1.350
|
$2.000
|
$2.080
|
$0.980
|
$2.100
|
$1.000
|
$2.200
|
|
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
|
LF
|
74,998.000
|
$0.750
|
$0.800
|
$0.820
|
$0.880
|
$0.840
|
$1.000
|
$0.880
|
|
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
|
LF
|
49,170.000
|
$2.100
|
$0.800
|
$0.800
|
$0.880
|
$0.840
|
$1.000
|
$0.880
|
|
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
|
LF
|
62,893.000
|
$0.940
|
$0.800
|
$0.820
|
$0.880
|
$0.840
|
$1.000
|
$0.880
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
52.000
|
$8.000
|
$20.000
|
$21.000
|
$1.000
|
$21.000
|
$1.000
|
$22.000
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
52.000
|
$11.000
|
$20.000
|
$21.000
|
$1.000
|
$21.000
|
$1.000
|
$22.000
|
|
|
PAVEMENT SLER (DBL ARROW)
|
EA
|
31.000
|
$11.000
|
$25.000
|
$26.000
|
$1.000
|
$26.250
|
$1.000
|
$27.500
|
|
|
PAVEMENT SLER (UTURN ARROW)
|
EA
|
4.000
|
$18.000
|
$30.000
|
$31.000
|
$1.000
|
$31.500
|
$1.000
|
$33.000
|
|
|
PAVEMENT SLER (U-L ARROW)
|
EA
|
10.000
|
$20.000
|
$30.000
|
$31.000
|
$1.000
|
$31.500
|
$1.000
|
$33.000
|
|
|
PAVEMENT SLER (SYMBOL)
|
EA
|
4.000
|
$19.000
|
$40.000
|
$42.000
|
$1.000
|
$42.000
|
$1.000
|
$44.000
|
|
|
PAVEMENT SLER (RR XING)
|
EA
|
2.000
|
$160.000
|
$100.000
|
$104.000
|
$1.000
|
$105.000
|
$1.000
|
$110.000
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
52.000
|
$205.000
|
$230.000
|
$239.000
|
$272.460
|
$241.500
|
$320.000
|
$253.000
|
|
PREFAB PM TY C (W)(DBL ARROW)
|
EA
|
31.000
|
$295.000
|
$325.000
|
$338.000
|
$412.340
|
$341.250
|
$484.000
|
$357.500
|
|
PREFAB PM TY C (W)(UTURN ARROW)
|
EA
|
4.000
|
$320.000
|
$340.000
|
$354.000
|
$423.980
|
$357.000
|
$498.000
|
$374.000
|
|
PREFAB PM TY C (W)(U-LT ARROW)
|
EA
|
10.000
|
$327.000
|
$515.000
|
$536.000
|
$541.400
|
$540.750
|
$636.000
|
$566.500
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
52.000
|
$265.000
|
$290.000
|
$302.000
|
$322.420
|
$304.500
|
$379.000
|
$319.000
|
|
PREFAB PM TY C (W)(RR XING)
|
EA
|
2.000
|
$500.000
|
$700.000
|
$728.000
|
$521.840
|
$735.000
|
$613.000
|
$770.000
|
|
PREFAB PM TY C (MULTI)(SHIELD)
|
EA
|
4.000
|
$3,100.000
|
$2,500.000
|
$2,601.000
|
$3,133.000
|
$2,625.000
|
$3,679.000
|
$2,750.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
93.000
|
$5.700
|
$6.000
|
$6.240
|
$9.750
|
$6.400
|
$11.000
|
$6.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
16.000
|
$5.700
|
$6.000
|
$6.240
|
$9.750
|
$6.400
|
$11.000
|
$6.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
4,754.000
|
$6.150
|
$5.500
|
$5.720
|
$9.750
|
$5.800
|
$11.000
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
52.000
|
$10.600
|
$10.000
|
$10.400
|
$5.000
|
$10.500
|
$6.000
|
$11.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
31.000
|
$15.700
|
$10.000
|
$10.400
|
$5.000
|
$10.500
|
$6.000
|
$11.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
4.000
|
$14.500
|
$10.000
|
$10.400
|
$5.000
|
$10.500
|
$6.000
|
$11.000
|
|
|
PAV SURF PREP FOR MRK (U/LT ARROW)
|
EA
|
10.000
|
$14.000
|
$10.000
|
$10.400
|
$5.000
|
$10.500
|
$6.000
|
$11.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
52.000
|
$14.200
|
$10.000
|
$10.400
|
$5.000
|
$10.500
|
$6.000
|
$11.000
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
2.000
|
$30.000
|
$10.000
|
$10.400
|
$5.000
|
$10.500
|
$6.000
|
$11.000
|
|
|
PAV SURF PREP FOR MRK (SHIELD)
|
EA
|
4.000
|
$60.000
|
$10.000
|
$10.000
|
$5.000
|
$10.500
|
$6.000
|
$11.000
|
|
|
JT CLEANING AND SEALING(TRANS CNTR JTS)
|
LF
|
2,470.000
|
$23.500
|
$6.000
|
$2.000
|
$3.000
|
$3.200
|
$4.000
|
$18.000
|
|
|
JT CLEANING AND SEALING(LNGT CNSTR JTS)
|
LF
|
5,949.000
|
$20.000
|
$5.000
|
$2.000
|
$3.000
|
$3.200
|
$4.000
|
$18.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
121,656.000
|
$3.250
|
$6.000
|
$4.500
|
$4.200
|
$5.800
|
$6.000
|
$3.000
|
|
|
VIVDS PROSR SYS
|
EA
|
3.000
|
$7,000.000
|
$13,000.000
|
$4,918.000
|
$4,727.070
|
$4,965.000
|
$15,510.000
|
$14,300.000
|
|
|
VIVDS CAM ASSY VAR LNS
|
EA
|
17.000
|
$5,000.000
|
$3,600.000
|
$6,784.000
|
$6,520.070
|
$6,850.000
|
$4,289.000
|
$4,000.000
|
|
|
VIVDS CNTRL SOFTWARE
|
EA
|
1.000
|
$12,000.000
|
$850.000
|
$1,159.000
|
$1,113.900
|
$1,170.000
|
$1,014.000
|
$935.000
|
|
|
VIVDS CABLING
|
LF
|
4,010.000
|
$3.000
|
$1.800
|
$2.700
|
$2.580
|
$2.750
|
$2.000
|
$2.000
|
|
Totals: |
$20,784,641.170
|
$22,200,381.700
|
$23,639,645.100
|
$27,244,510.630
|
$28,210,071.770
|
$28,994,625.690
|
$29,881,179.600
|