PREPARING ROW
|
STA
|
48.000
|
$4,000.000
|
$8,350.000
|
$7,000.000
|
$2,500.000
|
$1,600.000
|
$400.000
|
$10,400.000
|
$3,185.180
|
|
|
REMOVING CONC (PAV)
|
SY
|
2,701.000
|
$20.600
|
$13.790
|
$8.000
|
$4.210
|
$5.000
|
$3.130
|
$15.000
|
$5.950
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
5,246.000
|
$15.000
|
$3.640
|
$6.000
|
$3.040
|
$2.000
|
$1.790
|
$5.000
|
$9.040
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
1,071.000
|
$15.000
|
$5.330
|
$9.000
|
$3.040
|
$2.000
|
$2.000
|
$5.000
|
$11.570
|
|
|
REMOVING CONC (CTB)
|
LF
|
1,584.000
|
$30.000
|
$7.610
|
$10.000
|
$5.000
|
$10.000
|
$6.000
|
$10.500
|
$9.650
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
2,242.000
|
$78.780
|
$41.470
|
$30.000
|
$4.830
|
$4.000
|
$4.000
|
$7.500
|
$55.030
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
2,343.000
|
$5.000
|
$1.610
|
$6.000
|
$2.000
|
$1.500
|
$1.500
|
$6.000
|
$13.610
|
|
|
REMOVING CONC (FLUME)
|
SY
|
784.000
|
$6.000
|
$12.460
|
$10.000
|
$3.040
|
$2.000
|
$2.000
|
$8.500
|
$14.840
|
|
|
REMOVING STAB BASE AND ASPH PAV (7")
|
SY
|
3,486.000
|
$3.110
|
$3.700
|
$2.000
|
$7.230
|
$5.000
|
$4.680
|
$5.000
|
$5.930
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
26,033.000
|
$10.000
|
$5.740
|
$4.000
|
$11.000
|
$15.000
|
$20.000
|
$0.800
|
$9.240
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
24,808.000
|
$10.000
|
$4.840
|
$5.000
|
$24.350
|
$15.000
|
$7.000
|
$0.500
|
$16.350
|
|
|
BLOCK SODDING
|
SY
|
3,434.000
|
$7.740
|
$4.690
|
$6.250
|
$3.900
|
$3.000
|
$3.250
|
$4.700
|
$3.610
|
|
|
STRAW OR HAY MULCH
|
SY
|
5,905.000
|
$0.200
|
$0.980
|
$0.460
|
$0.460
|
$0.200
|
$0.160
|
$0.550
|
$0.220
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
5,904.000
|
$0.290
|
$0.700
|
$0.460
|
$0.460
|
$0.300
|
$0.270
|
$0.550
|
$0.280
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
5,904.000
|
$0.290
|
$0.700
|
$0.460
|
$0.460
|
$0.300
|
$0.270
|
$0.550
|
$0.290
|
|
|
FERTILIZER
|
AC
|
1.220
|
$704.780
|
$1,690.000
|
$898.000
|
$890.640
|
$800.000
|
$800.000
|
$1,080.000
|
$630.730
|
|
|
VEGETATIVE WATERING
|
MG
|
147.000
|
$19.640
|
$55.980
|
$25.000
|
$55.000
|
$40.000
|
$45.000
|
$30.000
|
$16.870
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(FNAL POS)
|
CY
|
192.000
|
$7.740
|
$157.000
|
$150.000
|
$75.000
|
$100.000
|
$100.000
|
$150.000
|
$106.080
|
|
|
LIME (HYDRATED LIME (DRY))
|
TON
|
11.000
|
$9.740
|
$400.000
|
$250.000
|
$180.000
|
$350.000
|
$200.000
|
$450.000
|
$226.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
4,878.000
|
$2.000
|
$3.790
|
$5.500
|
$3.500
|
$6.000
|
$4.250
|
$9.000
|
$8.410
|
|
|
CEMENT TREAT (NEW BASE)(12")
|
SY
|
6,918.000
|
$2.440
|
$4.050
|
$3.000
|
$6.250
|
$6.000
|
$45.000
|
$53.000
|
$38.250
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
25.700
|
$72.170
|
$855.400
|
$400.000
|
$275.000
|
$130.000
|
$275.000
|
$400.000
|
$110.810
|
|
|
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
|
TON
|
8.700
|
$198.890
|
$855.400
|
$900.000
|
$600.000
|
$200.000
|
$600.000
|
$425.000
|
$107.390
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
5,827.000
|
$5.490
|
$5.260
|
$2.500
|
$3.000
|
$2.500
|
$1.000
|
$5.650
|
$2.050
|
|
|
CONC PVMT (CONT REINF - CRCP) (14")
|
SY
|
3,837.000
|
$45.000
|
$112.520
|
$100.000
|
$117.000
|
$100.000
|
$100.000
|
$100.000
|
$101.740
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
33.000
|
$105.540
|
$134.520
|
$120.000
|
$300.000
|
$150.000
|
$175.000
|
$100.000
|
$131.560
|
|
|
TEMPORARY SPL SHORING
|
SF
|
19,951.000
|
$3.840
|
$20.370
|
$19.000
|
$17.000
|
$10.000
|
$20.000
|
$22.750
|
$23.970
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
52.000
|
$235.130
|
$495.000
|
$495.000
|
$495.000
|
$500.000
|
$495.000
|
$594.000
|
$989.620
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
56.000
|
$230.220
|
$265.000
|
$265.000
|
$265.000
|
$275.000
|
$265.000
|
$318.000
|
$439.420
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
223.000
|
$318.150
|
$205.050
|
$400.000
|
$427.000
|
$390.000
|
$130.000
|
$650.000
|
$632.470
|
|
|
CL C CONC (COLLAR)
|
EA
|
4.000
|
$612.500
|
$1,100.000
|
$400.000
|
$1,200.000
|
$1,000.000
|
$1,250.000
|
$850.000
|
$1,342.430
|
|
|
RETAINING WALL (MSE)
|
SF
|
20,130.000
|
$36.000
|
$52.830
|
$54.000
|
$44.000
|
$60.000
|
$65.000
|
$43.200
|
$67.270
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
620.000
|
$481.740
|
$324.910
|
$445.000
|
$450.000
|
$440.000
|
$475.000
|
$700.000
|
$511.330
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
74.000
|
$443.120
|
$463.510
|
$450.000
|
$525.000
|
$600.000
|
$425.000
|
$700.000
|
$567.440
|
|
|
RAIL (TY T552)
|
LF
|
2,613.000
|
$80.000
|
$47.150
|
$45.000
|
$40.000
|
$50.000
|
$65.000
|
$125.000
|
$113.060
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
6.000
|
$63.570
|
$325.530
|
$300.000
|
$210.000
|
$125.000
|
$175.000
|
$85.000
|
$83.320
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
420.000
|
$70.470
|
$69.780
|
$90.000
|
$150.000
|
$130.000
|
$100.000
|
$88.000
|
$106.130
|
|
|
INLET (COMPL)(TY AZR2G)
|
EA
|
5.000
|
$5,925.760
|
$9,690.010
|
$6,500.000
|
$10,000.000
|
$9,000.000
|
$9,500.000
|
$7,500.000
|
$10,423.280
|
|
|
INLET (COMPL)(EXT TY C)
|
EA
|
2.000
|
$1,118.860
|
$2,556.410
|
$2,500.000
|
$1,235.000
|
$600.000
|
$1,150.000
|
$810.000
|
$2,018.420
|
|
|
INLET (COMPL)(TY C)
|
EA
|
4.000
|
$3,116.800
|
$5,543.350
|
$4,000.000
|
$5,870.000
|
$5,000.000
|
$5,425.000
|
$3,965.000
|
$4,976.620
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$643.070
|
$2,086.350
|
$1,500.000
|
$1,412.000
|
$800.000
|
$1,425.000
|
$775.000
|
$2,068.910
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,215.160
|
$1,587.610
|
$2,000.000
|
$1,718.000
|
$1,100.000
|
$1,700.000
|
$1,020.000
|
$1,828.900
|
|
|
REMOV STR (INLET)
|
EA
|
5.000
|
$505.870
|
$570.880
|
$600.000
|
$1,015.000
|
$1,000.000
|
$750.000
|
$400.000
|
$850.970
|
|
|
REMOV STR (PIPE)
|
LF
|
229.000
|
$20.000
|
$12.460
|
$20.000
|
$20.000
|
$20.000
|
$50.000
|
$10.000
|
$26.080
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$398,865.350
|
$449,484.950
|
$470,000.000
|
$450,000.000
|
$510,000.000
|
$445,000.000
|
$500,000.000
|
$605,694.940
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$3,000.000
|
$3,285.350
|
$35,000.000
|
$6,200.000
|
$35,000.000
|
$5,500.000
|
$1,275.000
|
$14,908.040
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
68.000
|
$78.000
|
$121.200
|
$78.000
|
$78.000
|
$100.000
|
$50.000
|
$94.000
|
$68.310
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
68.000
|
$8.880
|
$25.990
|
$16.000
|
$16.000
|
$20.000
|
$15.000
|
$20.000
|
$12.960
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
95.000
|
$28.220
|
$57.810
|
$31.590
|
$31.590
|
$60.000
|
$45.000
|
$38.000
|
$26.810
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
95.000
|
$9.030
|
$15.010
|
$13.000
|
$13.000
|
$10.000
|
$15.000
|
$16.000
|
$10.060
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,372.000
|
$2.680
|
$2.350
|
$2.940
|
$2.940
|
$2.500
|
$2.500
|
$3.500
|
$2.940
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,372.000
|
$0.830
|
$0.490
|
$0.740
|
$0.740
|
$0.500
|
$1.000
|
$0.900
|
$0.900
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
290.000
|
$3.420
|
$5.990
|
$6.880
|
$6.880
|
$6.000
|
$5.000
|
$8.250
|
$4.720
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
290.000
|
$0.750
|
$4.190
|
$1.180
|
$1.180
|
$2.000
|
$2.000
|
$1.400
|
$1.100
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
2,160.000
|
$9.000
|
$9.920
|
$9.000
|
$25.000
|
$20.000
|
$14.000
|
$16.000
|
$9.300
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,290.000
|
$6.000
|
$5.270
|
$7.000
|
$10.000
|
$10.000
|
$7.000
|
$7.000
|
$7.410
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
2,160.000
|
$8.000
|
$9.660
|
$9.000
|
$13.000
|
$20.000
|
$8.000
|
$15.000
|
$12.850
|
|
|
PORT CTB CONNECT HARDWARE
|
EA
|
72.000
|
$50.000
|
$1.080
|
$60.000
|
$110.000
|
$1.000
|
$50.000
|
$36.000
|
$101.260
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
1,820.000
|
$16.560
|
$6.270
|
$25.000
|
$17.000
|
$40.000
|
$22.500
|
$40.000
|
$29.330
|
|
|
CONC CURB (TY III)
|
LF
|
2,210.000
|
$15.000
|
$11.880
|
$6.000
|
$30.000
|
$10.000
|
$10.500
|
$25.000
|
$21.680
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
344.000
|
$2.900
|
$10.000
|
$7.250
|
$5.000
|
$5.000
|
$10.000
|
$12.000
|
$2.640
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$300.000
|
$500.000
|
$672.000
|
$450.000
|
$300.000
|
$500.000
|
$600.000
|
$300.800
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$300.000
|
$350.000
|
$450.000
|
$450.000
|
$300.000
|
$350.000
|
$420.000
|
$382.130
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,290.420
|
$4,600.000
|
$1,500.000
|
$4,600.000
|
$4,000.000
|
$4,600.000
|
$5,520.000
|
$1,783.260
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
3.000
|
$19,616.180
|
$24,800.000
|
$21,000.000
|
$32,000.000
|
$30,000.000
|
$24,800.000
|
$29,760.000
|
$24,686.120
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
1,989.000
|
$150.000
|
$8.880
|
$0.010
|
$21.000
|
$1.000
|
$35.000
|
$30.000
|
$22.550
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$1,485.000
|
$375.000
|
$375.000
|
$375.000
|
$400.000
|
$375.000
|
$450.000
|
$645.100
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
7.000
|
$2,932.100
|
$3,575.000
|
$3,575.000
|
$3,575.000
|
$3,600.000
|
$3,575.000
|
$4,290.000
|
$3,962.560
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,165.000
|
$12.030
|
$8.250
|
$8.250
|
$8.250
|
$8.250
|
$8.250
|
$9.900
|
$12.730
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
6,750.000
|
$8.150
|
$14.000
|
$14.000
|
$14.000
|
$14.000
|
$14.000
|
$16.800
|
$18.740
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
82.000
|
$11.690
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
$12.000
|
$27.090
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
1,220.000
|
$19.360
|
$25.000
|
$25.000
|
$25.000
|
$25.000
|
$25.000
|
$30.000
|
$32.440
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,307.000
|
$1.010
|
$1.950
|
$1.950
|
$1.950
|
$2.000
|
$1.950
|
$2.350
|
$1.220
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
2,614.000
|
$1.040
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$2.400
|
$1.600
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
5.000
|
$672.100
|
$795.000
|
$795.000
|
$795.000
|
$800.000
|
$795.000
|
$950.000
|
$1,049.260
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
2.000
|
$6,086.420
|
$24,000.000
|
$5,600.000
|
$5,600.000
|
$5,600.000
|
$5,600.000
|
$6,720.000
|
$6,624.480
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
193.000
|
$18.900
|
$34.950
|
$35.000
|
$35.000
|
$35.000
|
$35.000
|
$42.000
|
$28.460
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$558.810
|
$645.000
|
$455.000
|
$455.000
|
$450.000
|
$645.000
|
$775.000
|
$653.470
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
2.000
|
$625.220
|
$550.000
|
$395.000
|
$395.000
|
$550.000
|
$550.000
|
$660.000
|
$644.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
8.000
|
$1,060.350
|
$675.000
|
$510.000
|
$510.000
|
$550.000
|
$675.000
|
$810.000
|
$848.670
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
1.000
|
$730.000
|
$970.000
|
$640.000
|
$640.000
|
$750.000
|
$970.000
|
$1,165.000
|
$795.180
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
8.000
|
$80.650
|
$100.000
|
$60.000
|
$60.000
|
$95.000
|
$100.000
|
$120.000
|
$94.720
|
|
|
RELOCATE LRSA
|
EA
|
1.000
|
$5,834.610
|
$5,000.000
|
$1,250.000
|
$1,250.000
|
$1,250.000
|
$5,000.000
|
$1,500.000
|
$4,306.140
|
|
|
REMOVE LRSA
|
EA
|
2.000
|
$1,025.000
|
$2,500.000
|
$375.000
|
$375.000
|
$375.000
|
$2,500.000
|
$450.000
|
$1,027.080
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
2.000
|
$11,285.000
|
$21,795.060
|
$24,000.000
|
$24,000.000
|
$24,000.000
|
$24,000.000
|
$28,800.000
|
$23,623.120
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
2.000
|
$8,287.150
|
$12,530.000
|
$7,500.000
|
$900.000
|
$1,250.000
|
$2,500.000
|
$120.000
|
$22,473.660
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
308.000
|
$0.710
|
$1.100
|
$2.000
|
$2.000
|
$1.100
|
$1.100
|
$2.400
|
$1.430
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
3,178.000
|
$0.590
|
$0.720
|
$1.500
|
$1.500
|
$0.750
|
$0.720
|
$1.800
|
$0.870
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
6,182.000
|
$0.590
|
$0.720
|
$1.500
|
$1.500
|
$0.750
|
$0.720
|
$1.800
|
$0.980
|
|
REFL PAV MRKR TY I-R
|
EA
|
15.000
|
$5.770
|
$4.000
|
$8.000
|
$8.000
|
$4.000
|
$4.000
|
$9.500
|
$8.020
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
733.000
|
$4.180
|
$4.000
|
$8.000
|
$8.000
|
$4.000
|
$4.000
|
$9.500
|
$5.240
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,802.000
|
$0.240
|
$0.450
|
$1.000
|
$1.000
|
$0.450
|
$0.450
|
$1.200
|
$0.730
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,372.570
|
$10,818.340
|
$5,000.000
|
$5,827.230
|
$15,000.000
|
$7,500.000
|
$28,800.000
|
$12,667.290
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
5,758.000
|
$0.570
|
$1.000
|
$0.800
|
$0.800
|
$1.000
|
$1.000
|
$0.950
|
$0.890
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
1,729.000
|
$0.550
|
$1.100
|
$0.800
|
$0.800
|
$1.100
|
$1.100
|
$0.950
|
$0.820
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
4,525.000
|
$1.000
|
$1.700
|
$1.600
|
$1.600
|
$1.700
|
$1.700
|
$1.900
|
$1.570
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
4,288.000
|
$0.560
|
$1.000
|
$0.800
|
$0.800
|
$1.000
|
$1.000
|
$0.950
|
$0.890
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
17.000
|
$2,729.720
|
$2,500.000
|
$2,500.000
|
$2,500.000
|
$2,500.000
|
$2,500.000
|
$3,000.000
|
$4,698.860
|
|
Totals: |
$4,114,789.514
|
$4,637,319.220
|
$4,787,132.740
|
$4,863,923.621
|
$5,099,757.750
|
$5,130,458.110
|
$5,394,422.450
|
$6,243,916.451
|