PREPARING ROW
|
STA
|
5.300
|
$2,000.000
|
$5,000.000
|
$15,000.000
|
$5,000.000
|
$800.000
|
$9,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
651.000
|
$5.000
|
$7.000
|
$10.000
|
$4.000
|
$12.000
|
$4.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
55.000
|
$8.000
|
$8.000
|
$10.000
|
$5.000
|
$25.000
|
$5.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
96.000
|
$11.000
|
$15.000
|
$10.000
|
$10.000
|
$15.000
|
$5.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,051.000
|
$14.000
|
$15.000
|
$15.000
|
$30.000
|
$21.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
227.000
|
$12.000
|
$20.000
|
$20.000
|
$30.000
|
$35.000
|
$20.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
1,682.000
|
$1.400
|
$1.000
|
$1.000
|
$1.000
|
$5.500
|
$1.000
|
|
|
BLOCK SODDING
|
SY
|
464.000
|
$5.500
|
$8.000
|
$5.000
|
$4.000
|
$8.500
|
$3.000
|
|
|
STRAW OR HAY MULCH
|
SY
|
1,682.000
|
$0.400
|
$2.500
|
$0.300
|
$0.200
|
$0.800
|
$0.500
|
|
|
BROADCAST SEED (PERM)(SPECIAL MIX)
|
SY
|
1,682.000
|
$0.300
|
$1.000
|
$0.500
|
$0.150
|
$0.300
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
53.500
|
$15.000
|
$10.000
|
$20.000
|
$15.000
|
$14.000
|
$20.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
544.000
|
$2.000
|
$4.000
|
$5.000
|
$18.000
|
$8.500
|
$6.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
7.350
|
$150.000
|
$500.000
|
$170.000
|
$160.000
|
$200.000
|
$150.000
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
248.000
|
$63.000
|
$100.000
|
$130.000
|
$120.000
|
$92.000
|
$98.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
79.000
|
$74.000
|
$100.000
|
$140.000
|
$130.000
|
$180.000
|
$130.000
|
|
|
CONC PAV (JOINT REINF) (6")
|
SY
|
508.000
|
$65.000
|
$75.000
|
$60.000
|
$60.000
|
$80.000
|
$60.000
|
|
|
CEM STABIL BKFL
|
CY
|
25.000
|
$38.000
|
$100.000
|
$55.000
|
$50.000
|
$45.000
|
$60.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
100.000
|
$2.000
|
$1.000
|
$1.000
|
$5.000
|
$1.000
|
$2.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
205.000
|
$130.000
|
$100.000
|
$190.000
|
$100.000
|
$74.000
|
$220.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
452.000
|
$179.000
|
$200.000
|
$235.000
|
$175.000
|
$174.000
|
$350.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
132.000
|
$200.000
|
$250.000
|
$295.000
|
$200.000
|
$200.000
|
$550.000
|
|
|
CL C CONC (ABUT)
|
CY
|
54.000
|
$918.000
|
$1,200.000
|
$1,050.000
|
$1,500.000
|
$1,200.000
|
$1,500.000
|
|
|
REINF CONC SLAB (BOX BEAM)
|
SF
|
1,648.200
|
$13.000
|
$18.000
|
$12.000
|
$34.000
|
$17.000
|
$20.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
2,180.500
|
$15.000
|
$14.000
|
$12.000
|
$34.000
|
$23.000
|
$15.000
|
|
|
BRIDGE SIDEWALK
|
SF
|
779.700
|
$10.000
|
$13.000
|
$9.500
|
$15.000
|
$9.000
|
$25.000
|
|
|
APPROACH SLAB
|
CY
|
181.300
|
$450.000
|
$600.000
|
$420.000
|
$500.000
|
$715.000
|
$450.000
|
|
|
SHEAR KEY
|
CY
|
9.300
|
$280.000
|
$300.000
|
$550.000
|
$400.000
|
$250.000
|
$200.000
|
|
|
PRESTR CONC BOX BEAM (4B20)
|
LF
|
245.936
|
$180.000
|
$255.000
|
$195.000
|
$200.000
|
$203.000
|
$310.000
|
|
|
PRESTR CONC BOX BEAM (5B20)
|
LF
|
122.960
|
$180.000
|
$255.000
|
$195.000
|
$300.000
|
$206.000
|
$310.000
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
99.060
|
$100.000
|
$230.000
|
$195.000
|
$200.000
|
$210.000
|
$310.000
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
346.710
|
$100.000
|
$230.000
|
$195.000
|
$300.000
|
$205.000
|
$310.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
103.000
|
$185.000
|
$150.000
|
$195.000
|
$150.000
|
$148.000
|
$70.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
154.000
|
$142.000
|
$150.000
|
$215.000
|
$150.000
|
$176.000
|
$75.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
26.000
|
$560.000
|
$600.000
|
$450.000
|
$775.000
|
$630.000
|
$350.000
|
|
|
RAIL (TY T223)
|
LF
|
156.000
|
$69.000
|
$125.000
|
$90.000
|
$200.000
|
$99.000
|
$90.000
|
|
|
RAIL (TY C223)
|
LF
|
124.100
|
$85.000
|
$150.000
|
$175.000
|
$300.000
|
$110.000
|
$110.000
|
|
|
CMP (GAL STL 36 IN)
|
LF
|
94.000
|
$93.000
|
$100.000
|
$45.000
|
$70.000
|
$84.000
|
$80.000
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
3.000
|
$4,400.000
|
$6,000.000
|
$6,200.000
|
$5,000.000
|
$5,200.000
|
$4,000.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
1.000
|
$1,500.000
|
$1,000.000
|
$500.000
|
$3,000.000
|
$990.000
|
$500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
50.000
|
$35.000
|
$20.000
|
$10.000
|
$30.000
|
$20.000
|
$5.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$15,000.000
|
$15,000.000
|
$25,000.000
|
$12,000.000
|
$30,000.000
|
$50,000.000
|
|
|
MOBILIZATION
|
LS
|
2.000
|
$45,000.000
|
$50,000.000
|
$40,000.000
|
$65,000.000
|
$135,000.000
|
$70,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$3,000.000
|
$1,000.000
|
$2,500.000
|
$2,500.000
|
$1,600.000
|
$1,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
155.000
|
$35.000
|
$75.000
|
$50.000
|
$35.000
|
$66.000
|
$45.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
155.000
|
$15.000
|
$30.000
|
$10.000
|
$15.000
|
$34.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
268.000
|
$34.000
|
$50.000
|
$35.000
|
$30.000
|
$41.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
268.000
|
$9.000
|
$20.000
|
$5.000
|
$10.000
|
$20.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,391.000
|
$2.800
|
$4.000
|
$4.250
|
$3.000
|
$3.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,391.000
|
$0.900
|
$1.500
|
$1.000
|
$1.000
|
$1.500
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
345.000
|
$63.000
|
$50.000
|
$65.000
|
$80.000
|
$88.000
|
$50.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
400.000
|
$28.000
|
$20.000
|
$65.000
|
$50.000
|
$65.000
|
$25.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$25.000
|
$20.000
|
$65.000
|
$50.000
|
$65.000
|
$25.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
320.000
|
$5.500
|
$4.000
|
$20.000
|
$10.000
|
$10.000
|
$11.660
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
160.000
|
$6.100
|
$4.000
|
$20.000
|
$10.000
|
$10.000
|
$2.920
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
400.000
|
$7.000
|
$12.000
|
$25.000
|
$15.000
|
$9.000
|
$14.800
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$7.000
|
$12.000
|
$25.000
|
$15.000
|
$9.000
|
$11.660
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
372.000
|
$4.000
|
$5.000
|
$6.000
|
$10.000
|
$4.000
|
$10.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
97.000
|
$35.000
|
$50.000
|
$45.000
|
$100.000
|
$76.000
|
$80.000
|
|
|
DRIVEWAYS (CONC) (FAST TRACK)
|
SY
|
99.000
|
$70.000
|
$90.000
|
$85.000
|
$150.000
|
$95.000
|
$133.800
|
|
|
CONC SIDEWALKS (5")
|
SY
|
169.000
|
$65.000
|
$60.000
|
$65.000
|
$100.000
|
$55.000
|
$60.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
375.000
|
$22.000
|
$25.000
|
$15.000
|
$19.500
|
$24.000
|
$23.250
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
4.000
|
$1,567.000
|
$1,250.000
|
$1,650.000
|
$1,000.000
|
$1,700.000
|
$1,140.000
|
|
|
SHORT RADIUS
|
LF
|
30.000
|
$51.000
|
$35.000
|
$25.000
|
$29.610
|
$43.000
|
$28.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,187.000
|
$1,500.000
|
$1,350.000
|
$1,130.000
|
$1,300.000
|
$950.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,343.000
|
$2,500.000
|
$1,400.000
|
$2,300.000
|
$2,700.000
|
$2,450.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
70.000
|
$20.000
|
$75.000
|
$20.000
|
$40.000
|
$35.000
|
$25.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$486.000
|
$600.000
|
$500.000
|
$600.000
|
$900.000
|
$800.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$200.000
|
$45.000
|
$450.000
|
$45.000
|
$88.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
24.000
|
$40.000
|
$50.000
|
$20.000
|
$50.000
|
$24.000
|
$52.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
|
EA
|
12.000
|
$27.000
|
$50.000
|
$20.000
|
$50.000
|
$24.000
|
$59.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
12.000
|
$48.000
|
$10.000
|
$20.000
|
$10.000
|
$6.000
|
$21.000
|
|
|
INSTL OM ASSM (OM-3L)(FLX)SRF
|
EA
|
4.000
|
$198.000
|
$205.000
|
$20.000
|
$205.000
|
$145.000
|
$214.000
|
|
|
INSTL OM ASSM (OM-3R)(FLX)SRF
|
EA
|
4.000
|
$130.000
|
$205.000
|
$20.000
|
$205.000
|
$145.000
|
$214.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
7.000
|
$20.000
|
$15.000
|
$20.000
|
$15.000
|
$15.000
|
$10.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
1,014.000
|
$0.300
|
$0.500
|
$1.500
|
$0.650
|
$0.250
|
$0.650
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
1,985.000
|
$0.600
|
$1.000
|
$2.000
|
$1.300
|
$0.600
|
$1.300
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
55.000
|
$6.000
|
$5.000
|
$9.000
|
$6.500
|
$6.400
|
$6.500
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
987.000
|
$0.600
|
$1.000
|
$2.000
|
$1.300
|
$0.700
|
$1.300
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
100.000
|
$0.700
|
$1.000
|
$10.000
|
$0.500
|
$0.750
|
$1.000
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
510.000
|
$0.700
|
$1.000
|
$2.500
|
$3.000
|
$0.100
|
$3.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,968.000
|
$0.350
|
$1.000
|
$3.000
|
$0.750
|
$2.250
|
$0.750
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
32.000
|
$3.000
|
$5.000
|
$10.000
|
$4.000
|
$2.750
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
29.000
|
$59.000
|
$20.000
|
$100.000
|
$100.000
|
$100.000
|
$90.000
|
|
Totals: |
$916,217.980
|
$1,137,427.780
|
$1,181,970.770
|
$1,314,851.700
|
$1,353,420.718
|
$1,402,401.310
|