PREPARING ROW
|
STA
|
1.950
|
$21,000.000
|
$12,000.000
|
$9,000.000
|
$21,101.050
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
105.000
|
$16.000
|
$15.000
|
$12.000
|
$45.940
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
250.000
|
$10.000
|
$5.000
|
$16.000
|
$11.570
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
374.000
|
$8.000
|
$13.000
|
$5.000
|
$23.210
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
213.000
|
$30.000
|
$22.000
|
$12.000
|
$51.560
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
140.000
|
$29.000
|
$40.000
|
$15.000
|
$50.910
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
117.000
|
$32.000
|
$15.000
|
$15.000
|
$65.670
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
164.000
|
$95.000
|
$100.000
|
$45.000
|
$188.110
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
22.000
|
$30.000
|
$80.000
|
$50.000
|
$162.000
|
|
|
BLOCK SODDING
|
SY
|
299.000
|
$5.000
|
$6.000
|
$8.000
|
$17.740
|
|
|
FERTILIZER
|
AC
|
0.070
|
$1,500.000
|
$800.000
|
$3,000.000
|
$6,171.430
|
|
|
VEGETATIVE WATERING
|
MG
|
9.000
|
$35.000
|
$35.000
|
$35.000
|
$360.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
304.000
|
$5.000
|
$8.000
|
$12.000
|
$56.210
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
5.000
|
$285.000
|
$300.000
|
$400.000
|
$2,664.000
|
|
|
CEM STABIL BKFL
|
CY
|
20.000
|
$213.000
|
$80.000
|
$100.000
|
$466.800
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
35.000
|
$50.000
|
$80.000
|
$90.000
|
$290.230
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
50.000
|
$6.000
|
$2.000
|
$25.000
|
$116.760
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
360.000
|
$210.000
|
$500.000
|
$350.000
|
$250.130
|
|
|
CL C CONC (ABUT)
|
CY
|
31.600
|
$1,400.000
|
$1,500.000
|
$1,150.000
|
$1,146.200
|
|
|
REINF CONC SLAB (BOX BEAM)
|
SF
|
1,971.000
|
$25.000
|
$20.000
|
$25.000
|
$25.150
|
|
|
BRIDGE SIDEWALK
|
SF
|
342.000
|
$58.000
|
$15.000
|
$16.000
|
$10.680
|
|
|
APPROACH SLAB
|
CY
|
57.000
|
$755.000
|
$750.000
|
$700.000
|
$830.130
|
|
|
SHEAR KEY
|
CY
|
11.000
|
$500.000
|
$250.000
|
$450.000
|
$691.420
|
|
|
PRESTR CONC BOX BEAM (4B20)
|
LF
|
338.890
|
$235.000
|
$250.000
|
$310.000
|
$245.590
|
|
|
PRESTR CONC BOX BEAM (5B20)
|
LF
|
112.960
|
$235.000
|
$250.000
|
$350.000
|
$267.260
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
94.000
|
$200.000
|
$200.000
|
$185.000
|
$176.130
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
178.000
|
$18.000
|
$35.000
|
$25.000
|
$33.360
|
|
|
RAIL (TY T223)
|
LF
|
77.000
|
$150.000
|
$170.000
|
$200.000
|
$354.930
|
|
|
RAIL (TY C223)
|
LF
|
67.000
|
$185.000
|
$200.000
|
$200.000
|
$671.390
|
|
|
TYPE A JOINT
|
LF
|
58.000
|
$75.000
|
$5.000
|
$85.000
|
$291.590
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
50.000
|
$100.000
|
$110.000
|
$160.000
|
$191.160
|
|
|
MANH (COMPL)(TY A)
|
EA
|
2.000
|
$8,750.000
|
$12,000.000
|
$8,000.000
|
$15,914.880
|
|
|
INLET (COMPL)(CURB)(TY C)
|
EA
|
2.000
|
$6,600.000
|
$7,500.000
|
$8,000.000
|
$9,266.880
|
|
|
INLET (COMPL)(TY AZ2G)
|
EA
|
1.000
|
$10,300.000
|
$13,000.000
|
$10,000.000
|
$12,335.760
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$33,000.000
|
$40,000.000
|
$85,000.000
|
$30,704.400
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$68,281.000
|
$80,000.000
|
$80,000.000
|
$80,946.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$8,000.000
|
$1,300.000
|
$5,000.000
|
$1,008.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
105.000
|
$70.000
|
$40.000
|
$55.000
|
$36.340
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
105.000
|
$20.000
|
$10.000
|
$15.000
|
$4.860
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
171.000
|
$7.000
|
$25.000
|
$15.000
|
$10.350
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
340.000
|
$4.000
|
$3.000
|
$4.000
|
$7.920
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
340.000
|
$1.000
|
$1.000
|
$1.000
|
$1.760
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
51.000
|
$5.000
|
$7.000
|
$6.000
|
$19.220
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
51.000
|
$1.000
|
$1.000
|
$1.000
|
$5.880
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
141.000
|
$42.000
|
$35.000
|
$26.000
|
$39.130
|
|
|
DRIVEWAYS (CONC)
|
SY
|
87.000
|
$105.000
|
$100.000
|
$85.000
|
$131.720
|
|
|
CONC SIDEWALKS (4")
|
SY
|
61.000
|
$100.000
|
$75.000
|
$75.000
|
$125.100
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
40.000
|
$10.000
|
$10.000
|
$10.000
|
$15.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$70.000
|
$150.000
|
$150.000
|
$120.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
5.000
|
$30.000
|
$25.000
|
$40.000
|
$66.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
6.000
|
$60.000
|
$30.000
|
$150.000
|
$70.000
|
|
|
INSTL OM ASSM (OM-3L)(WFLX)SRF)SRF
|
EA
|
2.000
|
$225.000
|
$235.000
|
$500.000
|
$303.600
|
|
|
INSTL OM ASSM (OM-3R)(WFLX)SRF)SRF
|
EA
|
1.000
|
$225.000
|
$235.000
|
$600.000
|
$513.600
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
391.000
|
$0.600
|
$2.000
|
$1.500
|
$8.920
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
391.000
|
$0.600
|
$2.000
|
$1.500
|
$8.920
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
10.000
|
$10.000
|
$20.000
|
$15.000
|
$208.320
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
782.000
|
$0.200
|
$1.000
|
$0.500
|
$1.640
|
|
|
D-GR HMA TY-B SAC-B PG70-22
|
TON
|
58.000
|
$220.000
|
$225.000
|
$220.000
|
$262.970
|
|
|
TACK COAT
|
GAL
|
54.000
|
$13.000
|
$5.500
|
$10.000
|
$97.250
|
|
|
D-GR HMA TY-C SAC-B PG70-22 (EXEMPT)
|
TON
|
58.000
|
$300.000
|
$225.000
|
$220.000
|
$247.170
|
|
|
D-GR HMA TY-D SAC-A PG70-22 (EXEMPT)
|
TON
|
29.000
|
$365.000
|
$300.000
|
$220.000
|
$303.030
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
180.000
|
$65.000
|
$60.000
|
$200.000
|
$43.670
|
|
Totals: |
$800,384.350
|
$824,263.500
|
$882,796.900
|
$935,819.862
|