REMOVING CONC (PAV)
|
SY
|
252.000
|
$20.000
|
$25.000
|
$30.000
|
$20.000
|
$10.000
|
$12.000
|
$200.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
8.000
|
$20.000
|
$50.000
|
$24.000
|
$20.000
|
$145.000
|
$150.000
|
$300.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
12.000
|
$50.000
|
$50.000
|
$25.000
|
$20.000
|
$145.000
|
$150.000
|
$328.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
14.000
|
$10.000
|
$25.000
|
$11.000
|
$10.000
|
$15.000
|
$15.000
|
$25.000
|
|
|
REMOVING CONC (APPR SLAB)
|
SY
|
112.000
|
$220.000
|
$25.000
|
$18.000
|
$30.000
|
$20.000
|
$20.000
|
$50.000
|
|
|
REMOVE CONC (RAIL)
|
LF
|
38.000
|
$100.000
|
$25.000
|
$30.000
|
$10.000
|
$25.000
|
$25.000
|
$100.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
410.000
|
$10.000
|
$15.000
|
$10.000
|
$10.000
|
$12.000
|
$15.000
|
$25.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
166.000
|
$30.000
|
$20.000
|
$50.000
|
$50.000
|
$45.000
|
$50.000
|
$55.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
90.000
|
$50.000
|
$20.000
|
$48.000
|
$50.000
|
$45.000
|
$50.000
|
$144.800
|
|
|
BLOCK SODDING
|
SY
|
30.000
|
$15.000
|
$5.000
|
$4.000
|
$5.000
|
$9.000
|
$10.000
|
$25.000
|
|
|
FERTILIZER
|
AC
|
0.006
|
$5,000.000
|
$1,000.000
|
$815.000
|
$10,000.000
|
$1,800.000
|
$2,000.000
|
$100,000.000
|
|
|
VEGETATIVE WATERING
|
MG
|
0.800
|
$100.000
|
$1,000.000
|
$15.000
|
$250.000
|
$80.000
|
$1,000.000
|
$1,000.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
492.000
|
$10.000
|
$14.000
|
$20.000
|
$15.000
|
$7.000
|
$8.000
|
$5.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
8.000
|
$300.000
|
$375.000
|
$190.000
|
$160.000
|
$200.000
|
$200.000
|
$250.000
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
492.000
|
$20.000
|
$20.000
|
$38.000
|
$29.000
|
$10.000
|
$200.000
|
$15.000
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
28.000
|
$120.000
|
$200.000
|
$400.000
|
$60.000
|
$235.000
|
$250.000
|
$145.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
470.000
|
$80.000
|
$200.000
|
$115.000
|
$148.000
|
$400.000
|
$425.000
|
$100.000
|
|
|
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
|
SY
|
32.000
|
$1,000.000
|
$600.000
|
$690.000
|
$380.000
|
$445.000
|
$450.000
|
$400.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
1.000
|
$500.000
|
$750.000
|
$300.000
|
$2,000.000
|
$219.000
|
$220.000
|
$1,000.000
|
|
|
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
|
SF
|
6.000
|
$250.000
|
$200.000
|
$675.000
|
$140.000
|
$195.000
|
$250.000
|
$1,000.000
|
|
|
CONC STR REPR(RAPID DECK REP(FULL DPT))
|
SF
|
198.000
|
$350.000
|
$150.000
|
$52.000
|
$150.000
|
$235.000
|
$250.000
|
$600.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
172.000
|
$150.000
|
$115.000
|
$325.000
|
$90.000
|
$200.000
|
$250.000
|
$339.000
|
|
|
CONC STR REPR(REMOV AND REPL BACKWALL)
|
CY
|
12.000
|
$3,000.000
|
$2,500.000
|
$1,200.000
|
$2,500.000
|
$1,400.000
|
$1,500.000
|
$1,578.000
|
|
|
CONC STR REPR(REMOV AND REPL WINGWALL)
|
CY
|
8.000
|
$3,000.000
|
$2,500.000
|
$1,200.000
|
$2,500.000
|
$1,400.000
|
$1,500.000
|
$2,100.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
3.000
|
$600.000
|
$1,000.000
|
$680.000
|
$900.000
|
$750.000
|
$800.000
|
$1,643.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
171.000
|
$40.000
|
$100.000
|
$35.000
|
$35.000
|
$150.000
|
$150.000
|
$22.000
|
|
|
RAIL (TY T552)
|
LF
|
38.000
|
$200.000
|
$175.000
|
$256.000
|
$290.000
|
$148.000
|
$150.000
|
$200.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$65,600.000
|
$63,000.000
|
$75,000.000
|
$77,000.000
|
$81,000.000
|
$100,000.000
|
$100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$15,000.000
|
$3,500.000
|
$5,000.000
|
$19,000.000
|
$16,000.000
|
$10,000.000
|
$10,000.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
480.000
|
$20.000
|
$40.000
|
$22.000
|
$20.000
|
$40.000
|
$40.000
|
$50.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
600.000
|
$10.000
|
$20.000
|
$20.000
|
$15.000
|
$19.000
|
$20.000
|
$8.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
480.000
|
$15.000
|
$15.000
|
$20.000
|
$15.000
|
$28.000
|
$30.000
|
$50.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
25.000
|
$20.000
|
$8.000
|
$11.000
|
$20.000
|
$19.000
|
$20.000
|
$100.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
25.000
|
$60.000
|
$30.000
|
$40.000
|
$66.000
|
$28.000
|
$28.000
|
$69.690
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$2,000.000
|
$2,500.000
|
$2,600.000
|
$2,500.000
|
$2,250.000
|
$2,500.000
|
$2,498.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
25.000
|
$20.000
|
$1.000
|
$3.000
|
$20.000
|
$18.000
|
$15.000
|
$52.590
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$5,000.000
|
$2,750.000
|
$3,200.000
|
$3,160.000
|
$3,500.000
|
$3,000.000
|
$3,419.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$1,000.000
|
$300.000
|
$250.000
|
$500.000
|
$990.000
|
$1,000.000
|
$1,314.000
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
2.000
|
$5,000.000
|
$4,000.000
|
$3,000.000
|
$2,000.000
|
$2,500.000
|
$10,000.000
|
$1,973.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,500.000
|
$1,500.000
|
$1,600.000
|
$2,000.000
|
$2,500.000
|
$2,500.000
|
$1,973.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
2.000
|
$1,500.000
|
$2,000.000
|
$1,250.000
|
$500.000
|
$1,300.000
|
$2,500.000
|
$1,315.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
180.000
|
$10.000
|
$3.500
|
$5.000
|
$3.200
|
$14.000
|
$15.000
|
$4.210
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
94.000
|
$3.000
|
$2.000
|
$1.750
|
$1.500
|
$5.000
|
$2.000
|
$1.970
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
482.000
|
$1.000
|
$2.000
|
$1.750
|
$1.500
|
$5.000
|
$2.000
|
$1.970
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
3.000
|
$150.000
|
$100.000
|
$100.000
|
$85.000
|
$5.000
|
$2.000
|
$111.840
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
3.000
|
$175.000
|
$100.000
|
$110.000
|
$95.000
|
$5.000
|
$200.000
|
$125.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
6,213.000
|
$1.000
|
$0.750
|
$1.000
|
$0.650
|
$1.500
|
$2.000
|
$0.860
|
|
REFL PAV MRK TY II (Y) (MED NOSE)
|
EA
|
1.000
|
$100.000
|
$500.000
|
$600.000
|
$500.000
|
$55.000
|
$2.000
|
$657.890
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
78.000
|
$10.000
|
$5.000
|
$5.250
|
$4.500
|
$5.000
|
$2.000
|
$5.920
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,904.000
|
$0.500
|
$1.000
|
$0.600
|
$0.500
|
$5.000
|
$2.000
|
$0.660
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
188.000
|
$1.000
|
$1.500
|
$1.100
|
$1.000
|
$5.000
|
$2.000
|
$1.320
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
320.000
|
$2.500
|
$4.000
|
$3.500
|
$3.000
|
$5.000
|
$2.000
|
$3.950
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
2,126.000
|
$0.100
|
$0.250
|
$0.170
|
$0.150
|
$2.000
|
$1.000
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
520.000
|
$0.150
|
$0.500
|
$0.350
|
$0.300
|
$1.500
|
$1.000
|
$0.390
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
492.000
|
$0.300
|
$2.000
|
$1.750
|
$1.500
|
$2.000
|
$1.500
|
$1.970
|
|
|
BRIDGE JOINT REPLACEMENT (SEJ)
|
LF
|
68.000
|
$450.000
|
$350.000
|
$150.000
|
$525.000
|
$295.000
|
$100.000
|
$400.000
|
|
|
WIDE FLANGE PAVEMENT TERMINALS
|
LF
|
65.000
|
$800.000
|
$865.000
|
$490.000
|
$890.000
|
$900.000
|
$1,000.000
|
$220.000
|
|
|
REPLACE ELASTOMERIC BEARING PADS
|
EA
|
24.000
|
$8,000.000
|
$3,000.000
|
$11,000.000
|
$8,000.000
|
$750.000
|
$2,000.000
|
$12,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
234.000
|
$84.000
|
$75.000
|
$90.000
|
$50.000
|
$185.000
|
$200.000
|
$53.000
|
|
MULTIPOLYMER PAV MRK (W)(4")(BRK)
|
LF
|
630.000
|
$1.000
|
$1.000
|
$1.000
|
$0.850
|
$2.250
|
$2.500
|
$1.120
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
188.000
|
$2.000
|
$2.000
|
$1.750
|
$1.500
|
$2.250
|
$2.500
|
$1.970
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
74.000
|
$5.000
|
$8.000
|
$8.000
|
$7.000
|
$2.250
|
$2.500
|
$9.210
|
|
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
|
LF
|
1,496.000
|
$1.000
|
$1.000
|
$1.000
|
$0.850
|
$2.250
|
$2.500
|
$1.120
|
|
MULTIPOLYMER PAV MRK (Y)(24")(SLD)
|
LF
|
418.000
|
$5.000
|
$8.000
|
$9.000
|
$7.000
|
$2.250
|
$2.500
|
$9.210
|
|
|
TMA (STATIONARY)
|
DAY
|
56.000
|
$227.000
|
$250.000
|
$275.000
|
$250.000
|
$500.000
|
$500.000
|
$263.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
16.000
|
$50.000
|
$100.000
|
$100.000
|
$60.000
|
$200.000
|
$200.000
|
$500.000
|
|
Totals: |
$814,620.200
|
$632,045.250
|
$768,717.010
|
$775,218.450
|
$808,870.800
|
$966,282.000
|
$1,026,337.710
|