REMOVING CONC (CURB)
|
LF
|
406.000
|
$8.000
|
$4.500
|
$7.000
|
$25.000
|
$8.000
|
$33.000
|
$150.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
450.000
|
$32.000
|
$22.000
|
$30.000
|
$81.000
|
$30.000
|
$138.000
|
$150.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,581.900
|
$16.000
|
$11.000
|
$13.000
|
$27.000
|
$12.000
|
$150.000
|
$150.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
80.020
|
$34.000
|
$233.000
|
$200.000
|
$475.000
|
$250.000
|
$700.000
|
$85.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
220.320
|
$243.000
|
$332.000
|
$1,300.000
|
$550.000
|
$600.000
|
$1,300.000
|
$500.000
|
|
|
FULL - DEPTH REPAIR CRCP (6")
|
SY
|
12.000
|
$185.000
|
$600.000
|
$600.000
|
$1,075.000
|
$1,000.000
|
$1,500.000
|
$400.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
2.000
|
$475.000
|
$700.000
|
$3,000.000
|
$1,330.000
|
$10,000.000
|
$3,600.000
|
$800.000
|
|
|
CL K CONC (MISC)
|
CY
|
13.000
|
$2,091.000
|
$7,600.000
|
$7,500.000
|
$24,300.000
|
$11,000.000
|
$27,000.000
|
$1,850.000
|
|
|
BLAST FINISH
|
SF
|
11,200.000
|
$1.200
|
$1.700
|
$3.000
|
$0.650
|
$2.500
|
$2.400
|
$3.000
|
|
|
CONC STR REPAIR (EPOXY MORTAR)
|
SF
|
103.000
|
$140.000
|
$100.000
|
$14.000
|
$160.000
|
$747.000
|
$105.000
|
$225.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
105.000
|
$226.000
|
$250.000
|
$500.000
|
$555.000
|
$283.000
|
$600.000
|
$300.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
356.000
|
$331.000
|
$180.000
|
$85.000
|
$185.000
|
$500.000
|
$250.000
|
$300.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
401.000
|
$206.000
|
$150.000
|
$75.000
|
$220.000
|
$145.000
|
$175.000
|
$300.000
|
|
|
CONC STR REPR(REMOV AND REPL WINGWALL)
|
CY
|
1.000
|
$4,003.000
|
$2,700.000
|
$15,000.000
|
$16,500.000
|
$15,000.000
|
$17,000.000
|
$25,000.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
920.910
|
$701.000
|
$583.000
|
$900.000
|
$995.000
|
$600.000
|
$1,300.000
|
$1,850.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
30.000
|
$40.000
|
$25.000
|
$70.000
|
$92.000
|
$120.000
|
$65.000
|
$100.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
277.000
|
$49.000
|
$35.000
|
$90.000
|
$53.000
|
$59.000
|
$70.000
|
$100.000
|
|
|
CLEANING AND SEALING JOINTS (FOAM)
|
LF
|
149.000
|
$105.000
|
$50.000
|
$65.000
|
$74.000
|
$120.000
|
$200.000
|
$125.000
|
|
|
STR STEEL (DIAPHRAGM & STIFFENER)
|
LB
|
1,005.000
|
$2.400
|
$28.000
|
$30.000
|
$18.000
|
$50.000
|
$40.000
|
$95.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
498.000
|
$236.000
|
$312.000
|
$600.000
|
$850.000
|
$350.000
|
$200.000
|
$335.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$800,000.000
|
$490,000.000
|
$620,000.000
|
$885,000.000
|
$840,000.000
|
$830,000.000
|
$922,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$7,900.000
|
$75,000.000
|
$55,000.000
|
$95,000.000
|
$15,000.000
|
$64,000.000
|
$85,000.000
|
|
|
PORT CTB (ALIGNING)
|
LF
|
250.000
|
$5.000
|
$6.200
|
$18.000
|
$42.000
|
$45.000
|
$45.000
|
$15.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
150.000
|
$76.000
|
$263.000
|
$450.000
|
$700.000
|
$180.000
|
$260.000
|
$200.000
|
|
|
CONC DIRECTIONAL ISLAND
|
LF
|
406.000
|
$46.000
|
$20.000
|
$70.000
|
$50.000
|
$90.000
|
$144.000
|
$125.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
17,494.000
|
$30.000
|
$18.800
|
$33.000
|
$30.000
|
$20.000
|
$32.000
|
$48.000
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
LF
|
19.000
|
$77.000
|
$70.000
|
$100.000
|
$115.000
|
$120.000
|
$110.000
|
$112.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
64.000
|
$2,060.000
|
$1,585.000
|
$2,100.000
|
$2,300.000
|
$1,700.000
|
$2,500.000
|
$3,500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
60.000
|
$1,735.000
|
$1,050.000
|
$1,100.000
|
$1,715.000
|
$1,368.000
|
$1,300.000
|
$2,500.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
1.000
|
$999.000
|
$800.000
|
$1,300.000
|
$1,100.000
|
$2,633.000
|
$1,400.000
|
$1,280.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
17,756.000
|
$3.400
|
$0.450
|
$4.000
|
$3.200
|
$1.600
|
$4.000
|
$1.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
59.000
|
$284.000
|
$150.000
|
$250.000
|
$335.000
|
$117.000
|
$270.000
|
$240.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
63.000
|
$242.000
|
$335.000
|
$3,500.000
|
$335.000
|
$117.000
|
$500.000
|
$288.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
56.000
|
$3,189.000
|
$2,720.000
|
$3,500.000
|
$4,025.000
|
$2,500.000
|
$4,000.000
|
$5,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
56.000
|
$285.000
|
$280.000
|
$500.000
|
$350.000
|
$117.000
|
$560.000
|
$448.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
22.000
|
$31.000
|
$75.000
|
$100.000
|
$15.000
|
$1,000.000
|
$178.000
|
$120.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$1,859.000
|
$2,500.000
|
$2,500.000
|
$4,250.000
|
$2,700.000
|
$3,200.000
|
$4,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
599.000
|
$17.000
|
$20.000
|
$23.000
|
$26.000
|
$12.000
|
$27.000
|
$32.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
139.000
|
$9.000
|
$20.000
|
$23.000
|
$26.000
|
$13.000
|
$33.000
|
$32.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
8.000
|
$26.000
|
$35.000
|
$29.000
|
$33.000
|
$27.000
|
$33.000
|
$56.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
2.000
|
$27.000
|
$35.000
|
$29.000
|
$28.000
|
$27.000
|
$47.000
|
$56.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
17,494.000
|
$1.700
|
$1.500
|
$1.530
|
$2.900
|
$1.700
|
$1.700
|
$2.200
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
17,494.000
|
$1.700
|
$1.500
|
$1.530
|
$2.900
|
$1.700
|
$1.700
|
$2.200
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
34,988.000
|
$0.600
|
$0.600
|
$0.520
|
$1.000
|
$0.900
|
$1.000
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
34,988.000
|
$0.100
|
$0.010
|
$0.110
|
$0.300
|
$0.100
|
$0.100
|
$1.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
262.000
|
$24.000
|
$15.650
|
$15.000
|
$36.000
|
$25.000
|
$20.000
|
$85.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
44.000
|
$73.000
|
$75.000
|
$275.000
|
$180.000
|
$550.000
|
$290.000
|
$125.000
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
1.000
|
$2,936.000
|
$3,000.000
|
$4,000.000
|
$4,550.000
|
$6,500.000
|
$4,300.000
|
$6,500.000
|
|
|
REPLACE (STEEL RAIL)
|
LF
|
10.000
|
$450.000
|
$307.000
|
$700.000
|
$345.000
|
$750.000
|
$1,000.000
|
$425.000
|
|
|
CONCRETE RAIL REPLACEMENT (TYPE 501)
|
LF
|
40.000
|
$1,209.000
|
$585.000
|
$600.000
|
$810.000
|
$600.000
|
$1,000.000
|
$1,150.000
|
|
|
CONCRETE RAIL REPLACEMENT (IN-KIND)
|
LF
|
120.000
|
$445.000
|
$837.000
|
$1,250.000
|
$830.000
|
$2,400.000
|
$600.000
|
$750.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
3.000
|
$113.000
|
$200.000
|
$1,000.000
|
$635.000
|
$3,750.000
|
$500.000
|
$2,250.000
|
|
|
REP STL BRIDGE MEMBER (DIAPHRAGM)
|
EA
|
4.000
|
$4,500.000
|
$3,965.000
|
$3,500.000
|
$3,000.000
|
$9,750.000
|
$5,000.000
|
$7,500.000
|
|
|
REP STL BRIDGE MEMBER(STRAIGHTEN MEMB)
|
EA
|
3.000
|
$4,625.000
|
$4,150.000
|
$27,000.000
|
$22,000.000
|
$40,000.000
|
$7,000.000
|
$75,000.000
|
|
|
BRIDGE JOINT REPLACEMENT (ARMOR)
|
LF
|
25.000
|
$526.000
|
$205.000
|
$1,000.000
|
$1,215.000
|
$800.000
|
$850.000
|
$1,500.000
|
|
|
BRIDGE JOINT REPLACEMENT (SEJ)
|
LF
|
64.000
|
$672.000
|
$488.000
|
$900.000
|
$1,100.000
|
$606.000
|
$850.000
|
$1,500.000
|
|
|
CARBON FIBER REINF POLYMER STRENGTHNING
|
SF
|
78.000
|
$50.000
|
$79.000
|
$160.000
|
$55.000
|
$212.000
|
$200.000
|
$225.000
|
|
|
CONCRETE BEAM REPAIR
|
EA
|
3.000
|
$3,217.000
|
$2,500.000
|
$4,700.000
|
$5,250.000
|
$35,000.000
|
$14,000.000
|
$15,000.000
|
|
|
CONCRETE BEAM REPAIR (CFRP)
|
EA
|
3.000
|
$25,517.000
|
$23,700.000
|
$24,000.000
|
$64,000.000
|
$75,000.000
|
$19,000.000
|
$15,000.000
|
|
|
CONCRETE BEAM REP(STRAND SPLICE & CFRP)
|
EA
|
1.000
|
$21,117.000
|
$8,850.000
|
$35,000.000
|
$24,500.000
|
$42,500.000
|
$28,000.000
|
$15,000.000
|
|
|
REPLACE ELASTOMERIC BEARING PADS
|
EA
|
158.000
|
$20,000.000
|
$7,730.000
|
$4,800.000
|
$2,950.000
|
$23,000.000
|
$14,000.000
|
$9,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
788.000
|
$136.000
|
$71.000
|
$75.000
|
$125.000
|
$125.000
|
$350.000
|
$200.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
17,494.000
|
$1.600
|
$1.500
|
$1.550
|
$2.850
|
$1.600
|
$2.000
|
$2.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
17,494.000
|
$1.300
|
$1.500
|
$1.550
|
$2.850
|
$1.600
|
$2.000
|
$2.000
|
|
|
TMA (STATIONARY)
|
DAY
|
499.000
|
$259.000
|
$206.000
|
$250.000
|
$250.000
|
$1,000.000
|
$500.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
400.000
|
$96.000
|
$67.000
|
$550.000
|
$125.000
|
$45.000
|
$90.000
|
$200.000
|
|
Totals: |
$7,045,880.950
|
$4,990,800.710
|
$6,220,713.180
|
$6,899,353.850
|
$8,774,779.800
|
$8,827,958.400
|
$9,164,902.800
|