PREPARING ROW
|
AC
|
1.000
|
$28,500.000
|
$7,541.000
|
$35,000.000
|
$10,000.000
|
$100,000.000
|
$65,000.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
2,620.000
|
$3.460
|
$4.000
|
$2.000
|
$15.000
|
$5.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,299.000
|
$11.500
|
$9.000
|
$20.000
|
$30.000
|
$60.000
|
$20.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
386.000
|
$3.500
|
$8.000
|
$3.700
|
$3.000
|
$2.000
|
$6.000
|
|
|
BLOCK SODDING
|
SY
|
5,339.000
|
$3.000
|
$5.000
|
$4.000
|
$4.000
|
$5.500
|
$6.000
|
|
|
FERTILIZER
|
AC
|
2.000
|
$700.000
|
$1,322.000
|
$2,800.000
|
$1,250.000
|
$1,250.000
|
$2,500.000
|
|
|
VEGETATIVE WATERING
|
MG
|
40.000
|
$25.000
|
$40.000
|
$50.000
|
$30.000
|
$100.000
|
$100.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(12")
|
SY
|
3,350.000
|
$70.000
|
$80.000
|
$107.000
|
$115.000
|
$160.000
|
$150.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
60.000
|
$10.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$10.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
200.000
|
$320.000
|
$385.000
|
$370.000
|
$350.000
|
$50.000
|
$550.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
2.000
|
$550.000
|
$500.000
|
$950.000
|
$1,600.000
|
$1,000.000
|
$550.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
34.000
|
$80.000
|
$75.000
|
$180.000
|
$300.000
|
$140.000
|
$200.000
|
|
|
INLET (COMPL)(TY AAD)
|
EA
|
4.000
|
$5,000.000
|
$2,750.000
|
$5,350.000
|
$5,500.000
|
$5,500.000
|
$6,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$60,000.000
|
$50,000.000
|
$45,000.000
|
$80,000.000
|
$90,000.000
|
$150,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$7,500.000
|
$1,649.000
|
$2,000.000
|
$10,000.000
|
$25,500.000
|
$8,500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
190.000
|
$35.000
|
$30.000
|
$35.000
|
$25.000
|
$25.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
190.000
|
$13.000
|
$5.000
|
$9.500
|
$5.000
|
$10.000
|
$20.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
2,770.000
|
$2.500
|
$7.000
|
$4.800
|
$5.000
|
$5.000
|
$20.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
262.000
|
$8.000
|
$12.000
|
$8.000
|
$10.000
|
$5.000
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
262.000
|
$2.500
|
$5.000
|
$5.000
|
$2.000
|
$1.000
|
$12.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
3,400.000
|
$8.000
|
$20.000
|
$16.000
|
$16.000
|
$9.000
|
$30.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
830.000
|
$5.000
|
$15.000
|
$11.000
|
$8.000
|
$3.000
|
$20.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
3,400.000
|
$8.000
|
$15.000
|
$11.000
|
$9.000
|
$9.000
|
$20.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
2,620.000
|
$4.000
|
$7.250
|
$5.000
|
$6.000
|
$6.000
|
$35.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
194.000
|
$23.000
|
$35.000
|
$35.000
|
$28.000
|
$37.500
|
$25.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$2,800.000
|
$2,750.000
|
$3,500.000
|
$3,000.000
|
$3,750.000
|
$3,000.000
|
|
|
RIDE PAYMENT ADJUSTMENT (ITEM 360)
|
DOL
|
1.000
|
$1.000
|
$15,000.000
|
$500.000
|
$1.000
|
$1.000
|
$50,000.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
2.000
|
$500.000
|
$750.000
|
$625.000
|
$550.000
|
$335.440
|
$8,500.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND(BR)
|
EA
|
3.000
|
$80.000
|
$100.000
|
$85.000
|
$80.000
|
$40.720
|
$100.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
1,821.000
|
$0.800
|
$1.150
|
$1.130
|
$1.000
|
$0.980
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (Y)8"(SLD)
|
LF
|
3,075.000
|
$0.850
|
$2.000
|
$1.740
|
$1.500
|
$1.500
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
59.000
|
$6.000
|
$8.000
|
$8.000
|
$7.000
|
$7.000
|
$20.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
2.000
|
$120.000
|
$155.000
|
$171.000
|
$150.000
|
$150.000
|
$250.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
1.000
|
$200.000
|
$250.000
|
$228.000
|
$200.000
|
$200.000
|
$250.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
2.000
|
$190.000
|
$250.000
|
$290.000
|
$250.000
|
$250.000
|
$250.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$140.000
|
$250.000
|
$200.000
|
$175.000
|
$175.000
|
$250.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
59.000
|
$1.150
|
$0.500
|
$2.300
|
$0.500
|
$0.250
|
$4.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
2.000
|
$30.000
|
$11.000
|
$11.600
|
$10.000
|
$10.000
|
$150.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
4.000
|
$28.000
|
$11.000
|
$11.600
|
$10.000
|
$10.000
|
$150.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
1.000
|
$35.000
|
$11.000
|
$11.600
|
$10.000
|
$10.000
|
$150.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
2.000
|
$43.000
|
$11.000
|
$11.600
|
$10.000
|
$10.000
|
$150.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
146.000
|
$4.100
|
$6.000
|
$7.000
|
$6.000
|
$6.000
|
$15.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
1,532.000
|
$0.300
|
$1.000
|
$0.460
|
$0.500
|
$0.400
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,559.000
|
$0.500
|
$1.000
|
$0.580
|
$0.500
|
$0.500
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
59.000
|
$2.150
|
$3.000
|
$3.500
|
$3.000
|
$3.000
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
4.000
|
$32.000
|
$50.000
|
$40.500
|
$35.000
|
$35.000
|
$250.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
6.000
|
$42.000
|
$50.000
|
$52.000
|
$45.000
|
$45.000
|
$250.000
|
|
|
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
|
EA
|
2.000
|
$72.000
|
$50.000
|
$52.000
|
$45.000
|
$45.000
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
4,356.000
|
$0.050
|
$0.050
|
$0.060
|
$0.050
|
$0.050
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,559.000
|
$0.080
|
$0.050
|
$0.090
|
$0.100
|
$0.080
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
116.000
|
$0.200
|
$0.050
|
$0.140
|
$0.150
|
$0.120
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
59.000
|
$0.800
|
$0.050
|
$0.290
|
$0.500
|
$0.250
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
4.000
|
$9.000
|
$0.150
|
$5.790
|
$5.000
|
$5.000
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
1.000
|
$8.000
|
$0.150
|
$11.500
|
$10.000
|
$10.000
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
2.000
|
$9.000
|
$0.150
|
$11.500
|
$10.000
|
$10.000
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
4.000
|
$9.500
|
$0.150
|
$11.500
|
$10.000
|
$10.000
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
146.000
|
$0.200
|
$0.150
|
$0.460
|
$0.400
|
$0.400
|
$10.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
21.000
|
$40.000
|
$250.000
|
$140.000
|
$100.000
|
$46.160
|
$150.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
2,178.000
|
$0.640
|
$1.500
|
$0.870
|
$0.750
|
$0.750
|
$3.000
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
1,408.000
|
$1.000
|
$2.000
|
$1.450
|
$1.250
|
$1.250
|
$3.000
|
|
MULTIPOLYMER PAV MRK (Y)(8")(SLD)
|
LF
|
151.000
|
$1.000
|
$2.500
|
$1.750
|
$1.500
|
$1.500
|
$3.000
|
|
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
|
LF
|
116.000
|
$2.600
|
$7.000
|
$3.500
|
$3.000
|
$3.000
|
$6.000
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
2,178.000
|
$0.700
|
$1.550
|
$0.870
|
$0.750
|
$0.750
|
$3.000
|
|
|
TMA (STATIONARY)
|
DAY
|
8.000
|
$260.000
|
$450.000
|
$385.000
|
$250.000
|
$500.000
|
$550.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
80.000
|
$30.000
|
$145.000
|
$90.000
|
$70.000
|
$80.000
|
$85.000
|
|
Totals: |
$600,815.890
|
$734,299.100
|
$796,829.380
|
$892,656.000
|
$1,136,848.120
|
$1,531,099.000
|