PREPARING ROW
|
STA
|
18.000
|
$3,000.000
|
$800.000
|
$10,000.000
|
$600.000
|
$500.000
|
$2,500.000
|
$7,500.000
|
$325.000
|
$3,000.000
|
$13,500.000
|
|
|
REMOVING STAB BASE & ASPH PAV(15"-20")
|
SY
|
2,143.000
|
$7.000
|
$3.500
|
$4.500
|
$10.500
|
$14.000
|
$14.500
|
$10.000
|
$29.000
|
$12.250
|
$5.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
351.000
|
$8.000
|
$17.000
|
$125.000
|
$7.000
|
$31.000
|
$24.000
|
$15.000
|
$12.000
|
$22.750
|
$7.000
|
|
|
EMBANKMENT (VEHICLE)(DENS CONT)(TY C)
|
CY
|
4,244.000
|
$14.000
|
$25.000
|
$16.000
|
$21.000
|
$26.000
|
$24.000
|
$20.000
|
$27.000
|
$17.250
|
$11.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
6,111.000
|
$4.000
|
$1.500
|
$1.330
|
$1.050
|
$1.600
|
$1.000
|
$1.500
|
$6.000
|
$1.350
|
$3.500
|
|
|
BLOCK SODDING
|
SY
|
9,990.000
|
$2.500
|
$4.000
|
$4.500
|
$3.720
|
$4.600
|
$4.000
|
$4.000
|
$4.500
|
$3.800
|
$4.000
|
|
|
STRAW OR HAY MULCH
|
SY
|
15,774.000
|
$0.300
|
$0.600
|
$0.250
|
$0.210
|
$0.680
|
$0.200
|
$0.500
|
$0.250
|
$0.600
|
$1.000
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
15,774.000
|
$0.300
|
$0.140
|
$0.150
|
$0.160
|
$0.130
|
$0.160
|
$0.100
|
$0.200
|
$0.110
|
$1.000
|
|
|
FERTILIZER
|
AC
|
6.100
|
$800.000
|
$900.000
|
$1,250.000
|
$850.000
|
$950.000
|
$1,000.000
|
$800.000
|
$1,050.000
|
$855.000
|
$1,350.000
|
|
|
VEGETATIVE WATERING
|
MG
|
732.000
|
$35.000
|
$12.000
|
$5.000
|
$18.000
|
$25.000
|
$44.250
|
$30.000
|
$12.000
|
$110.000
|
$60.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
2,180.000
|
$6.000
|
$9.000
|
$5.000
|
$6.500
|
$5.500
|
$4.150
|
$8.000
|
$4.600
|
$8.000
|
$4.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
31.000
|
$220.000
|
$195.000
|
$177.000
|
$188.000
|
$180.000
|
$225.000
|
$180.000
|
$227.000
|
$210.000
|
$180.000
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
2,180.000
|
$8.000
|
$14.000
|
$20.000
|
$16.000
|
$22.000
|
$20.000
|
$20.000
|
$23.000
|
$18.000
|
$20.000
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(8")
|
SY
|
2,240.000
|
$9.000
|
$22.000
|
$23.000
|
$18.000
|
$27.000
|
$27.000
|
$23.000
|
$33.000
|
$23.000
|
$25.000
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
120.000
|
$110.000
|
$240.000
|
$220.000
|
$148.000
|
$260.000
|
$260.000
|
$150.000
|
$154.000
|
$209.000
|
$155.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (12.5")
|
SY
|
1,895.000
|
$98.000
|
$93.000
|
$90.000
|
$88.000
|
$115.000
|
$95.000
|
$110.000
|
$122.000
|
$109.000
|
$85.000
|
|
|
CEM STABIL BKFL
|
CY
|
156.000
|
$74.000
|
$45.000
|
$40.000
|
$36.000
|
$39.000
|
$55.000
|
$40.000
|
$109.000
|
$131.000
|
$70.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
18.600
|
$60.000
|
$45.000
|
$40.000
|
$37.000
|
$39.000
|
$100.000
|
$40.000
|
$63.000
|
$224.000
|
$75.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
26.000
|
$3.000
|
$1.000
|
$1.000
|
$22.000
|
$1.000
|
$12.000
|
$5.000
|
$6.500
|
$106.000
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,076.000
|
$25.000
|
$4.000
|
$1.000
|
$16.000
|
$28.000
|
$43.000
|
$40.000
|
$27.000
|
$5.000
|
$40.000
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
280.000
|
$350.000
|
$330.000
|
$300.000
|
$592.000
|
$525.000
|
$680.000
|
$640.000
|
$725.000
|
$590.000
|
$550.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
59.000
|
$400.000
|
$480.000
|
$475.000
|
$346.000
|
$750.000
|
$925.000
|
$500.000
|
$1,275.000
|
$538.000
|
$950.000
|
|
|
CL C CONC (SIGN COLUMN)
|
CY
|
83.000
|
$850.000
|
$1,200.000
|
$1,000.000
|
$1,130.000
|
$1,400.000
|
$1,200.000
|
$1,400.000
|
$1,200.000
|
$2,205.000
|
$1,200.000
|
|
|
CL C CONC (SIGN FOOTING)
|
CY
|
39.200
|
$1,100.000
|
$650.000
|
$950.000
|
$768.500
|
$1,200.000
|
$800.000
|
$1,200.000
|
$1,450.000
|
$2,100.000
|
$900.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
96.400
|
$420.000
|
$402.000
|
$450.000
|
$350.000
|
$420.000
|
$450.000
|
$500.000
|
$535.000
|
$541.000
|
$410.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
39.000
|
$600.000
|
$464.000
|
$400.000
|
$523.000
|
$435.000
|
$530.000
|
$650.000
|
$570.000
|
$610.000
|
$450.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
107.000
|
$130.000
|
$194.000
|
$175.000
|
$108.000
|
$210.000
|
$160.000
|
$170.000
|
$207.000
|
$122.000
|
$280.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
14.300
|
$520.000
|
$650.000
|
$475.000
|
$500.000
|
$700.000
|
$450.000
|
$1,200.000
|
$1,010.000
|
$1,240.000
|
$350.000
|
|
|
RAIL (TY SSTR)
|
LF
|
116.000
|
$52.000
|
$147.000
|
$65.000
|
$115.000
|
$70.000
|
$62.000
|
$120.000
|
$181.000
|
$162.000
|
$70.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
274.000
|
$52.000
|
$130.000
|
$47.000
|
$115.000
|
$61.000
|
$65.500
|
$120.000
|
$183.000
|
$85.000
|
$75.000
|
|
|
CONCRETE BOX CULVERT(9FT X 10FT) EXTEND
|
LF
|
150.000
|
$1,000.000
|
$1,360.000
|
$1,100.000
|
$1,138.000
|
$1,150.000
|
$1,100.000
|
$1,500.000
|
$1,243.000
|
$2,016.000
|
$1,300.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
26.000
|
$100.000
|
$47.000
|
$80.000
|
$68.000
|
$90.000
|
$95.000
|
$125.000
|
$84.000
|
$135.000
|
$70.000
|
|
|
RC PIPE (CL V)(48 IN)
|
LF
|
62.000
|
$240.000
|
$383.000
|
$300.000
|
$250.000
|
$380.000
|
$390.000
|
$300.000
|
$373.000
|
$430.000
|
$375.000
|
|
|
INLET (COMPL)(TY A)
|
EA
|
1.000
|
$3,800.000
|
$5,600.000
|
$5,000.000
|
$4,700.000
|
$5,200.000
|
$5,300.000
|
$9,000.000
|
$7,585.000
|
$6,800.000
|
$5,850.000
|
|
|
MANH (COMPL)(TY A)
|
EA
|
1.000
|
$4,000.000
|
$12,530.000
|
$8,500.000
|
$7,680.000
|
$8,800.000
|
$9,000.000
|
$9,000.000
|
$10,225.000
|
$9,900.000
|
$14,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 18 IN)
|
EA
|
2.000
|
$3,800.000
|
$3,100.000
|
$4,000.000
|
$3,374.000
|
$3,100.000
|
$4,100.000
|
$1,500.000
|
$4,850.000
|
$4,400.000
|
$4,750.000
|
|
|
WINGWALL (FW - S) (HW=12 FT)
|
EA
|
2.000
|
$22,000.000
|
$22,000.000
|
$2,500.000
|
$27,000.000
|
$33,000.000
|
$34,000.000
|
$2,000.000
|
$51,150.000
|
$75,000.000
|
$37,500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,800.000
|
$2,000.000
|
$710.000
|
$2,100.000
|
$2,300.000
|
$3,000.000
|
$200.000
|
$4,500.000
|
$4,100.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
43.000
|
$20.000
|
$46.000
|
$13.000
|
$42.000
|
$26.000
|
$29.000
|
$50.000
|
$22.000
|
$70.000
|
$15.000
|
|
|
REMOVING ROCK RIPRAP
|
LF
|
60.000
|
$50.000
|
$70.000
|
$15.000
|
$26.000
|
$22.000
|
$20.000
|
$60.000
|
$47.000
|
$142.000
|
$10.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$153,509.820
|
$150,000.000
|
$190,000.000
|
$335,000.000
|
$100,000.000
|
$200,000.000
|
$220,000.000
|
$155,000.000
|
$170,000.000
|
$275,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$5,000.000
|
$1,000.000
|
$5,000.000
|
$3,000.000
|
$1,500.000
|
$900.000
|
$750.000
|
$1,865.000
|
$5,000.000
|
$2,550.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
333.000
|
$32.000
|
$22.000
|
$22.500
|
$26.600
|
$31.000
|
$38.000
|
$25.000
|
$33.000
|
$25.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
333.000
|
$14.000
|
$7.000
|
$15.500
|
$10.000
|
$9.000
|
$11.000
|
$5.000
|
$13.000
|
$7.600
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,268.000
|
$4.000
|
$3.500
|
$1.950
|
$2.900
|
$4.250
|
$3.000
|
$3.500
|
$3.500
|
$3.260
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,268.000
|
$2.000
|
$1.000
|
$1.050
|
$0.800
|
$1.000
|
$0.950
|
$1.000
|
$1.000
|
$0.900
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
412.000
|
$4.000
|
$4.500
|
$3.590
|
$4.800
|
$5.000
|
$6.650
|
$4.000
|
$6.000
|
$3.750
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
412.000
|
$1.200
|
$1.000
|
$1.050
|
$1.000
|
$1.000
|
$2.100
|
$1.000
|
$1.500
|
$0.900
|
$1.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,560.000
|
$41.000
|
$70.000
|
$40.000
|
$75.500
|
$90.000
|
$84.000
|
$47.000
|
$7.500
|
$81.000
|
$65.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,560.000
|
$12.000
|
$17.000
|
$8.000
|
$23.750
|
$13.000
|
$22.000
|
$5.000
|
$7.500
|
$20.000
|
$22.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
160.000
|
$130.000
|
$85.000
|
$65.000
|
$71.740
|
$200.000
|
$49.000
|
$90.000
|
$145.000
|
$110.000
|
$65.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
237.500
|
$32.000
|
$18.000
|
$21.000
|
$22.340
|
$26.000
|
$26.000
|
$22.000
|
$27.000
|
$22.000
|
$35.000
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$1,200.000
|
$450.000
|
$850.000
|
$1,600.000
|
$1,000.000
|
$1,050.000
|
$900.000
|
$1,950.000
|
$1,500.000
|
$1,750.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$2,200.000
|
$2,200.000
|
$1,725.000
|
$1,835.000
|
$2,200.000
|
$2,300.000
|
$1,800.000
|
$2,250.000
|
$1,500.000
|
$2,250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$3,200.000
|
$2,900.000
|
$2,500.000
|
$2,650.000
|
$3,200.000
|
$3,100.000
|
$2,500.000
|
$3,250.000
|
$2,500.000
|
$1,650.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$900.000
|
$225.000
|
$900.000
|
$500.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$1,170.000
|
$1,844.050
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
|
EA
|
2.000
|
$25,000.000
|
$23,000.000
|
$20,450.000
|
$19,900.000
|
$25,000.000
|
$31,000.000
|
$6,000.000
|
$27,250.000
|
$24,561.030
|
$27,500.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
20.000
|
$28.000
|
$130.000
|
$137.150
|
$32.000
|
$65.000
|
$37.000
|
$50.000
|
$65.000
|
$120.000
|
$35.000
|
|
|
GATE (INSTALL) (DOUBLE) (6' X 14')
|
EA
|
1.000
|
$2,000.000
|
$1,800.000
|
$1,724.130
|
$1,300.000
|
$2,500.000
|
$5,500.000
|
$2,500.000
|
$3,250.000
|
$350.000
|
$1,500.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
2,195.000
|
$5.400
|
$8.600
|
$8.000
|
$11.360
|
$9.500
|
$13.000
|
$11.000
|
$14.000
|
$8.000
|
$9.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
192.000
|
$26.000
|
$12.000
|
$11.000
|
$10.150
|
$13.000
|
$11.500
|
$16.000
|
$12.500
|
$11.000
|
$15.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
2,486.000
|
$5.800
|
$13.000
|
$12.000
|
$9.520
|
$14.500
|
$11.000
|
$12.000
|
$12.000
|
$12.000
|
$11.000
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
338.000
|
$42.000
|
$16.000
|
$15.000
|
$13.380
|
$18.000
|
$15.500
|
$15.000
|
$16.500
|
$15.000
|
$16.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
420.000
|
$7.400
|
$13.000
|
$12.000
|
$7.870
|
$14.500
|
$9.000
|
$18.000
|
$10.000
|
$13.250
|
$10.000
|
|
|
CONDT (RM) (2")
|
LF
|
280.000
|
$26.000
|
$43.000
|
$40.000
|
$27.830
|
$48.910
|
$32.250
|
$35.000
|
$34.000
|
$40.000
|
$40.000
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
692.000
|
$0.900
|
$1.100
|
$1.000
|
$1.110
|
$1.200
|
$1.300
|
$0.750
|
$1.500
|
$1.000
|
$1.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
597.000
|
$1.600
|
$1.600
|
$1.500
|
$1.460
|
$1.800
|
$1.600
|
$1.500
|
$2.000
|
$1.500
|
$2.000
|
|
|
ELEC CONDR (NO.2) BARE
|
LF
|
100.000
|
$2.000
|
$2.250
|
$2.100
|
$2.170
|
$2.500
|
$2.500
|
$2.750
|
$3.000
|
$2.100
|
$4.000
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
300.000
|
$2.100
|
$2.400
|
$2.250
|
$2.270
|
$2.700
|
$2.600
|
$2.750
|
$3.000
|
$2.250
|
$5.000
|
|
|
ELEC CONDR (NO.1) INSULATED
|
LF
|
1,791.000
|
$3.000
|
$2.900
|
$2.700
|
$2.820
|
$3.300
|
$3.250
|
$3.500
|
$3.500
|
$2.700
|
$6.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
8.000
|
$800.000
|
$1,200.000
|
$1,050.000
|
$915.000
|
$1,270.000
|
$1,050.000
|
$900.000
|
$1,125.000
|
$1,050.000
|
$1,200.000
|
|
|
ELC SRV TY D 120/240 200(NS)SS(N)GC(O)
|
EA
|
1.000
|
$6,000.000
|
$7,300.000
|
$6,775.000
|
$7,000.000
|
$8,200.000
|
$8,200.000
|
$10,000.000
|
$8,600.000
|
$6,775.000
|
$7,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$540.000
|
$900.000
|
$650.000
|
$691.000
|
$795.000
|
$800.000
|
$700.000
|
$845.000
|
$870.000
|
$950.000
|
|
|
INS OH SN SUP(35 FT CANT)(SPAN ONLY)
|
EA
|
4.000
|
$18,400.000
|
$16,100.000
|
$14,500.000
|
$15,748.000
|
$18,000.000
|
$18,300.000
|
$18,000.000
|
$19,250.000
|
$14,500.000
|
$35,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
4.000
|
$32.000
|
$20.000
|
$28.000
|
$30.000
|
$34.000
|
$37.000
|
$30.000
|
$36.000
|
$75.000
|
$450.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
2.000
|
$32.000
|
$20.000
|
$28.000
|
$30.000
|
$34.000
|
$49.000
|
$30.000
|
$36.000
|
$75.000
|
$550.000
|
|
|
PAV SURF PREP FOR MRK (BLAST CLN)(6")
|
LF
|
1,288.000
|
$0.500
|
$0.130
|
$0.650
|
$1.060
|
$0.600
|
$0.300
|
$1.000
|
$1.500
|
$0.650
|
$2.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
14.000
|
$110.000
|
$85.000
|
$120.000
|
$200.000
|
$425.000
|
$200.000
|
$150.000
|
$325.000
|
$80.000
|
$100.000
|
|
|
FO CBL (6 SMF)(PIGTAIL)(INS ONLY)
|
LF
|
462.000
|
$14.000
|
$3.200
|
$3.000
|
$2.360
|
$3.650
|
$2.700
|
$15.500
|
$3.000
|
$3.000
|
$5.000
|
|
|
FO CBL (12 SMF)
|
LF
|
200.000
|
$20.000
|
$3.000
|
$2.800
|
$3.440
|
$3.400
|
$4.000
|
$16.500
|
$4.000
|
$2.800
|
$5.500
|
|
|
FO CBL (12 SMF)(INS ONLY)
|
LF
|
5,424.000
|
$6.000
|
$3.000
|
$2.700
|
$2.760
|
$3.300
|
$3.200
|
$7.000
|
$3.500
|
$2.700
|
$4.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
644.000
|
$1.200
|
$3.500
|
$1.250
|
$3.190
|
$2.800
|
$1.800
|
$1.500
|
$4.000
|
$1.250
|
$2.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
644.000
|
$1.200
|
$3.500
|
$1.250
|
$3.190
|
$2.800
|
$1.650
|
$1.500
|
$4.000
|
$1.250
|
$2.000
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$220.000
|
$200.000
|
$300.000
|
$230.000
|
$400.000
|
$220.000
|
$500.000
|
$235.000
|
$600.000
|
$450.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
3.000
|
$3,500.000
|
$3,100.000
|
$2,900.000
|
$2,840.000
|
$3,500.000
|
$3,300.000
|
$5,600.000
|
$3,475.000
|
$2,900.000
|
$3,000.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243648)W/APRN
|
EA
|
8.000
|
$3,600.000
|
$4,100.000
|
$3,900.000
|
$2,970.000
|
$4,700.000
|
$3,400.000
|
$7,000.000
|
$3,650.000
|
$3,900.000
|
$3,500.000
|
|
|
LIGHTNING PROTECTION SYSTEM
|
LS
|
2.000
|
$11,500.000
|
$23,000.000
|
$21,250.000
|
$22,605.000
|
$26,000.000
|
$26,300.000
|
$30,000.000
|
$27,625.000
|
$21,250.000
|
$105,400.000
|
|
Totals: |
$1,780,741.020
|
$1,915,649.700
|
$1,918,944.740
|
$2,075,337.660
|
$2,171,616.240
|
$2,249,364.690
|
$2,295,181.900
|
$2,361,843.100
|
$2,588,445.530
|
$2,696,223.000
|