REMOVING CONCRETE(MOW STRIP)
|
LF
|
25.000
|
$17.360
|
$1.000
|
$26.000
|
$25.000
|
$1.000
|
$25.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
50.000
|
$275.750
|
$75.000
|
$100.000
|
$250.000
|
$75.000
|
$300.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
50.000
|
$368.000
|
$300.000
|
$100.000
|
$200.000
|
$300.000
|
$250.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
10.000
|
$734.180
|
$200.000
|
$650.000
|
$1,000.000
|
$400.000
|
$500.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
30.000
|
$728.810
|
$1.000
|
$500.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
12.000
|
$1,500.000
|
$2,000.000
|
$1,000.000
|
$1,500.000
|
$400.000
|
$1.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
60.000
|
$25.000
|
$10.000
|
$10.000
|
$100.000
|
$10.000
|
$100.000
|
|
|
PORT CTB (ALIGNING)
|
LF
|
1,500.000
|
$20.000
|
$5.000
|
$4.000
|
$5.000
|
$5.000
|
$20.000
|
|
|
CONC CURB (TY II)
|
LF
|
20.000
|
$40.960
|
$5.000
|
$50.000
|
$150.000
|
$5.000
|
$50.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
200.000
|
$30.770
|
$60.000
|
$24.000
|
$30.000
|
$19.000
|
$15.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
200.000
|
$35.420
|
$60.000
|
$30.000
|
$35.000
|
$20.000
|
$22.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
5.000
|
$2,359.350
|
$1,700.000
|
$2,000.000
|
$3,000.000
|
$1,700.000
|
$500.000
|
|
|
SHORT RADIUS
|
LF
|
80.000
|
$163.470
|
$15.000
|
$50.000
|
$40.000
|
$40.000
|
$10.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
10.000
|
$1,512.030
|
$1,600.000
|
$1,850.000
|
$1,800.000
|
$2,000.000
|
$1,100.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
50.000
|
$4.470
|
$1.000
|
$10.000
|
$20.000
|
$1.000
|
$5.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
10.000
|
$337.980
|
$1.000
|
$350.000
|
$1.000
|
$1.000
|
$100.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$25,777.780
|
$20,000.000
|
$500.000
|
$3,000.000
|
$2,500.000
|
$18,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
1.000
|
$35,000.000
|
$20,000.000
|
$500.000
|
$3,500.000
|
$3,500.000
|
$22,000.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
300.000
|
$42.750
|
$26.000
|
$25.000
|
$25.000
|
$35.000
|
$20.000
|
|
|
CHAIN LINK FENCE (REPAIR) (6')
|
LF
|
300.000
|
$8.000
|
$18.000
|
$18.000
|
$20.000
|
$15.000
|
$10.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
50.000
|
$20.330
|
$10.000
|
$10.000
|
$50.000
|
$5.000
|
$5.000
|
|
|
GATE (INSTALL) (DOUBLE) (6' X 14')
|
EA
|
1.000
|
$1,000.000
|
$800.000
|
$850.000
|
$1,500.000
|
$1,000.000
|
$500.000
|
|
|
GATE (REPAIR) (DOUBLE) (6' X 14')
|
EA
|
1.000
|
$500.000
|
$650.000
|
$850.000
|
$1,500.000
|
$500.000
|
$500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
1,000.000
|
$33.770
|
$1.000
|
$14.000
|
$12.000
|
$5.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
1,000.000
|
$374.020
|
$1.000
|
$14.000
|
$15.000
|
$5.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
|
EA
|
500.000
|
$12.250
|
$20.000
|
$19.000
|
$25.000
|
$8.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
|
EA
|
30.000
|
$0.700
|
$50.000
|
$19.000
|
$25.000
|
$8.000
|
$25.000
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
5,000.000
|
$25.940
|
$0.500
|
$0.650
|
$4.000
|
$0.500
|
$4.000
|
|
|
GRAFFITI REMOVAL (BLAST CLEANING)
|
SF
|
500.000
|
$5.590
|
$1.000
|
$1.500
|
$8.000
|
$1.000
|
$5.000
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
3,000.000
|
$0.100
|
$0.250
|
$2.500
|
$4.000
|
$0.200
|
$3.000
|
|
|
GRAFFITI REMOVAL (CHEMICAL CLEANING)
|
SF
|
100.000
|
$0.100
|
$3.000
|
$8.500
|
$1.000
|
$3.000
|
$12.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
4,000.000
|
$24.390
|
$40.000
|
$21.000
|
$15.000
|
$40.000
|
$15.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
100.000
|
$138.500
|
$15.000
|
$20.000
|
$50.000
|
$20.000
|
$35.000
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
75.000
|
$71.880
|
$15.000
|
$50.000
|
$60.000
|
$20.000
|
$35.000
|
|
|
REPAIR RAIL ELEMENT (CURVED RAIL)
|
LF
|
100.000
|
$28.890
|
$88.000
|
$45.000
|
$35.000
|
$60.000
|
$5.000
|
|
|
RAISE RAIL ELEMENT
|
LF
|
200.000
|
$1.000
|
$2.000
|
$45.000
|
$30.000
|
$20.000
|
$15.000
|
|
|
REALIGN EXISTING RAIL
|
LF
|
100.000
|
$1.000
|
$100.000
|
$10.000
|
$20.000
|
$2.000
|
$30.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
250.000
|
$122.670
|
$200.000
|
$55.000
|
$100.000
|
$100.000
|
$75.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
200.000
|
$56.400
|
$200.000
|
$150.000
|
$40.000
|
$35.000
|
$75.000
|
|
|
REALIGN POSTS
|
EA
|
100.000
|
$46.000
|
$5.000
|
$75.000
|
$30.000
|
$50.000
|
$200.000
|
|
|
REMOVE & REPLACE BLOCKOUT
|
EA
|
75.000
|
$176.860
|
$75.000
|
$75.000
|
$40.000
|
$200.000
|
$12.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
3,000.000
|
$39.630
|
$35.000
|
$25.000
|
$32.000
|
$40.000
|
$20.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
400.000
|
$188.670
|
$125.000
|
$50.000
|
$80.000
|
$200.000
|
$50.000
|
|
|
REPLACE TERMINAL ANCHOR POSTS
|
EA
|
5.000
|
$50.750
|
$1.000
|
$350.000
|
$1.000
|
$100.000
|
$100.000
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
20.000
|
$3,461.600
|
$3,200.000
|
$3,850.000
|
$4,400.000
|
$6,000.000
|
$2,350.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
50.000
|
$926.750
|
$2,000.000
|
$1,350.000
|
$1,000.000
|
$2,200.000
|
$500.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
20.000
|
$386.000
|
$85.000
|
$350.000
|
$100.000
|
$200.000
|
$100.000
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
50.000
|
$50.750
|
$80.000
|
$175.000
|
$100.000
|
$150.000
|
$50.000
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
50.000
|
$60.500
|
$80.000
|
$125.000
|
$85.000
|
$150.000
|
$50.000
|
|
|
REPLACE SGT STRUT
|
EA
|
20.000
|
$41.400
|
$80.000
|
$250.000
|
$85.000
|
$100.000
|
$50.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
70.000
|
$18.290
|
$30.000
|
$35.000
|
$30.000
|
$50.000
|
$15.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
25.000
|
$137.500
|
$300.000
|
$525.000
|
$100.000
|
$200.000
|
$50.000
|
|
|
REPAIR REACT (N) (MISC HARDWARE)
|
EA
|
1.000
|
$300.000
|
$1,200.000
|
$3,500.000
|
$2,000.000
|
$4,000.000
|
$1,000.000
|
|
|
REPAIR REACT (W) (MISC) (HARDWARE)
|
EA
|
1.000
|
$500.000
|
$1,200.000
|
$3,500.000
|
$2,000.000
|
$4,000.000
|
$1,000.000
|
|
|
REMOVE AND REPLACE (SMTC) (N)
|
EA
|
8.000
|
$20,000.000
|
$20,000.000
|
$25,000.000
|
$26,000.000
|
$20,000.000
|
$5,000.000
|
|
|
REPAIR (SMTC) (N)
|
EA
|
10.000
|
$2,000.000
|
$1,200.000
|
$1,500.000
|
$3,000.000
|
$4,000.000
|
$1,000.000
|
|
|
REMOVE AND REPLACE (SMTC) (W)
|
EA
|
10.000
|
$1,000.000
|
$20,000.000
|
$35,000.000
|
$37,000.000
|
$20,000.000
|
$5,000.000
|
|
|
REPAIR (SMTC) (W)
|
EA
|
15.000
|
$2,000.000
|
$1,200.000
|
$2,000.000
|
$2,000.000
|
$5,000.000
|
$1,000.000
|
|
|
REMOVE & REPLACE REACT 350(TXDOT FRNSH)
|
EA
|
1.000
|
$1,500.000
|
$2,000.000
|
$2,000.000
|
$3,000.000
|
$2,500.000
|
$1,000.000
|
|
|
REPAIR (EXISTING METAL PED. RAIL)
|
LF
|
100.000
|
$127.500
|
$100.000
|
$50.000
|
$200.000
|
$100.000
|
$250.000
|
|
|
CONCRETE RAIL REPAIR (MISC)
|
LF
|
100.000
|
$350.000
|
$300.000
|
$50.000
|
$300.000
|
$100.000
|
$250.000
|
|
|
PEDESTRIAN BARRIER (INSTALL)
|
LF
|
1,000.000
|
$150.000
|
$50.000
|
$25.000
|
$50.000
|
$150.000
|
$300.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
14.000
|
$178.940
|
$10.000
|
$300.000
|
$100.000
|
$10.000
|
$150.000
|
|
|
TMA (STATIONARY)
|
DAY
|
120.000
|
$341.520
|
$1.000
|
$650.000
|
$1.000
|
$1.000
|
$5,000.000
|
|
Totals: |
$1,766,592.140
|
$1,277,980.000
|
$1,331,720.000
|
$1,369,790.000
|
$1,457,715.000
|
$1,599,492.000
|