PREPARING ROW
|
STA
|
9.100
|
$4,200.000
|
$1,200.000
|
$1,450.000
|
$2,200.000
|
$2,250.000
|
$2,500.000
|
$2,900.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
84.000
|
$7.000
|
$20.000
|
$15.000
|
$12.000
|
$20.000
|
$25.000
|
$17.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
316.000
|
$18.000
|
$15.000
|
$12.000
|
$12.000
|
$14.000
|
$25.000
|
$22.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
28.000
|
$8.000
|
$15.000
|
$18.000
|
$30.000
|
$14.000
|
$10.000
|
$6.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
90.000
|
$17.500
|
$30.000
|
$14.250
|
$30.000
|
$14.000
|
$100.000
|
$12.000
|
|
|
REMOVING CONC (APPR SLAB)
|
SY
|
306.000
|
$40.000
|
$15.000
|
$16.750
|
$26.000
|
$20.000
|
$50.000
|
$45.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
34.000
|
$20.000
|
$15.000
|
$15.000
|
$12.000
|
$34.000
|
$25.000
|
$12.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
1,604.000
|
$4.000
|
$4.000
|
$3.000
|
$8.000
|
$5.860
|
$15.000
|
$8.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
764.000
|
$5.000
|
$10.000
|
$12.500
|
$20.000
|
$5.700
|
$20.000
|
$12.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
7,191.000
|
$8.500
|
$11.000
|
$11.250
|
$14.000
|
$15.850
|
$17.000
|
$16.000
|
|
|
FURNISHING AND PLACING TOPSOIL (6")
|
SY
|
11,218.000
|
$3.000
|
$1.100
|
$1.900
|
$2.500
|
$3.440
|
$2.000
|
$2.250
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
11,218.000
|
$0.800
|
$0.700
|
$0.680
|
$0.700
|
$0.660
|
$1.000
|
$1.650
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
5,609.000
|
$0.700
|
$0.650
|
$0.660
|
$0.600
|
$0.640
|
$1.000
|
$1.650
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
5,609.000
|
$0.700
|
$0.600
|
$0.600
|
$0.600
|
$0.590
|
$1.000
|
$1.650
|
|
|
VEGETATIVE WATERING
|
MG
|
360.000
|
$5.000
|
$4.000
|
$2.000
|
$1.000
|
$25.000
|
$10.000
|
$25.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
3,786.000
|
$1.620
|
$0.870
|
$0.860
|
$1.250
|
$0.850
|
$5.000
|
$5.250
|
|
|
CEMENT
|
TON
|
41.000
|
$155.000
|
$170.000
|
$190.000
|
$200.000
|
$204.000
|
$180.000
|
$195.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
3,027.000
|
$2.750
|
$3.500
|
$3.250
|
$6.500
|
$11.650
|
$7.000
|
$13.650
|
|
|
PRIME COAT (MC-30)
|
GAL
|
605.000
|
$4.720
|
$5.000
|
$5.500
|
$8.000
|
$6.400
|
$10.000
|
$12.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
795.000
|
$1.750
|
$5.000
|
$6.750
|
$15.000
|
$6.600
|
$5.000
|
$7.500
|
|
|
CEM STABIL BKFL
|
CY
|
489.000
|
$189.860
|
$185.000
|
$190.000
|
$225.000
|
$184.000
|
$180.000
|
$295.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
28.000
|
$65.870
|
$200.000
|
$240.000
|
$225.000
|
$207.000
|
$180.000
|
$365.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
8,838.000
|
$32.490
|
$30.000
|
$38.000
|
$5.000
|
$32.000
|
$35.000
|
$62.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
220.000
|
$120.000
|
$90.000
|
$115.000
|
$90.000
|
$110.000
|
$100.000
|
$110.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,045.000
|
$170.000
|
$215.000
|
$220.000
|
$135.000
|
$203.000
|
$270.000
|
$195.000
|
|
|
CL A CONC (FLUME)
|
CY
|
40.000
|
$600.000
|
$650.000
|
$410.000
|
$500.000
|
$425.000
|
$500.000
|
$425.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
104.600
|
$954.000
|
$950.000
|
$975.000
|
$1,000.000
|
$1,150.000
|
$950.000
|
$975.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
42.400
|
$900.000
|
$1,100.000
|
$950.000
|
$1,000.000
|
$1,450.000
|
$1,500.000
|
$1,225.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
42.500
|
$875.000
|
$1,100.000
|
$1,000.000
|
$1,400.000
|
$1,450.000
|
$1,100.000
|
$1,425.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
17,280.000
|
$17.540
|
$22.000
|
$18.000
|
$20.000
|
$18.000
|
$21.000
|
$18.980
|
|
|
BRIDGE SIDEWALK (HPC)
|
SF
|
4,066.000
|
$10.000
|
$8.000
|
$8.000
|
$20.000
|
$12.500
|
$15.000
|
$17.650
|
|
|
APPROACH SLAB (HPC)
|
CY
|
165.000
|
$521.240
|
$550.000
|
$445.000
|
$600.000
|
$600.000
|
$500.000
|
$625.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
6,333.000
|
$55.000
|
$72.000
|
$77.000
|
$100.000
|
$85.000
|
$45.000
|
$92.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
2,151.100
|
$128.470
|
$162.000
|
$170.000
|
$185.000
|
$163.000
|
$193.000
|
$161.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
41.000
|
$400.000
|
$500.000
|
$490.000
|
$500.000
|
$500.000
|
$600.000
|
$400.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
108.000
|
$500.000
|
$500.000
|
$485.000
|
$550.000
|
$500.000
|
$600.000
|
$450.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
42.000
|
$442.690
|
$450.000
|
$525.000
|
$500.000
|
$500.000
|
$450.000
|
$425.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
320.000
|
$10.000
|
$20.000
|
$25.000
|
$20.000
|
$30.000
|
$50.000
|
$22.000
|
|
|
RAIL (TY C221)(HPC)
|
LF
|
556.000
|
$105.000
|
$120.000
|
$145.000
|
$200.000
|
$137.000
|
$220.000
|
$110.000
|
|
|
ARMOR JOINT
|
LF
|
116.000
|
$60.000
|
$50.000
|
$45.000
|
$80.000
|
$83.000
|
$180.000
|
$85.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
118.300
|
$90.000
|
$85.000
|
$86.000
|
$95.000
|
$114.000
|
$55.000
|
$105.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
114.000
|
$48.150
|
$60.000
|
$70.000
|
$80.000
|
$83.000
|
$100.000
|
$85.000
|
|
|
INLET (COMPL)(PCO)(5FT)(LEFT)
|
EA
|
2.000
|
$5,500.000
|
$5,000.000
|
$5,400.000
|
$4,000.000
|
$6,575.000
|
$5,000.000
|
$6,500.000
|
|
|
INLET (COMPL)(PCO)(5FT)(RIGHT)
|
EA
|
2.000
|
$5,500.000
|
$5,000.000
|
$5,400.000
|
$4,000.000
|
$6,575.000
|
$5,000.000
|
$6,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,696.570
|
$1,000.000
|
$990.000
|
$1,000.000
|
$1,900.000
|
$1,000.000
|
$850.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$30,000.000
|
$100,000.000
|
$30,000.000
|
$160,000.000
|
$122,000.000
|
$200,000.000
|
$365,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$324,000.000
|
$220,000.000
|
$232,000.000
|
$320,000.000
|
$391,000.000
|
$350,000.000
|
$400,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$5,000.000
|
$5,000.000
|
$3,500.000
|
$4,500.000
|
$5,000.000
|
$10,000.000
|
$2,200.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
140.000
|
$38.230
|
$32.000
|
$32.000
|
$5.000
|
$31.000
|
$35.000
|
$55.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
140.000
|
$14.070
|
$9.000
|
$10.000
|
$1.000
|
$10.000
|
$10.000
|
$12.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
220.000
|
$28.130
|
$30.000
|
$30.000
|
$1.000
|
$29.000
|
$25.000
|
$35.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
220.000
|
$15.000
|
$9.000
|
$10.000
|
$1.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,044.000
|
$2.680
|
$2.600
|
$2.550
|
$1.000
|
$2.500
|
$3.000
|
$2.650
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,044.000
|
$1.000
|
$0.700
|
$0.800
|
$1.000
|
$0.750
|
$1.000
|
$1.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
1,272.000
|
$10.000
|
$27.000
|
$32.000
|
$35.000
|
$35.000
|
$55.000
|
$26.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
336.000
|
$81.450
|
$95.000
|
$84.000
|
$80.000
|
$85.000
|
$100.000
|
$85.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
102.000
|
$40.650
|
$38.000
|
$55.000
|
$60.000
|
$45.000
|
$55.000
|
$60.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
817.000
|
$66.000
|
$70.000
|
$74.000
|
$80.000
|
$75.000
|
$65.000
|
$16.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
4.000
|
$1,500.000
|
$2,000.000
|
$2,800.000
|
$5,000.000
|
$2,200.000
|
$1,500.000
|
$2,600.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
300.000
|
$20.090
|
$23.000
|
$22.000
|
$20.000
|
$21.250
|
$21.000
|
$26.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,746.360
|
$1,600.000
|
$1,780.000
|
$1,500.000
|
$1,725.000
|
$1,600.000
|
$1,400.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$2.880
|
$2.200
|
$2.200
|
$2.000
|
$2.300
|
$4.000
|
$2.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$200.000
|
$220.000
|
$330.000
|
$400.000
|
$350.000
|
$200.000
|
$1,600.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,640.520
|
$2,700.000
|
$2,890.000
|
$2,600.000
|
$2,775.000
|
$2,500.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$659.560
|
$220.000
|
$330.000
|
$500.000
|
$350.000
|
$250.000
|
$200.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,341.670
|
$1,100.000
|
$2,750.000
|
$1,000.000
|
$2,650.000
|
$1,500.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
2.000
|
$23,000.000
|
$25,000.000
|
$26,000.000
|
$25,000.000
|
$24,800.000
|
$16,000.000
|
$9,500.000
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
473.000
|
$12.750
|
$40.000
|
$44.000
|
$10.000
|
$25.000
|
$10.000
|
$22.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
1.000
|
$233.700
|
$470.000
|
$290.000
|
$600.000
|
$520.720
|
$350.000
|
$450.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$355.000
|
$635.000
|
$400.000
|
$600.000
|
$675.000
|
$500.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$712.920
|
$630.000
|
$580.000
|
$800.000
|
$615.000
|
$850.000
|
$400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$748.260
|
$810.000
|
$770.000
|
$800.000
|
$790.000
|
$1,000.000
|
$500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
12.000
|
$95.070
|
$55.000
|
$70.000
|
$50.000
|
$172.000
|
$100.000
|
$200.000
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
8.000
|
$200.000
|
$300.000
|
$385.000
|
$500.000
|
$295.000
|
$350.000
|
$500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
13.000
|
$30.000
|
$20.000
|
$31.000
|
$20.000
|
$31.000
|
$35.000
|
$45.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
8.000
|
$60.000
|
$85.000
|
$110.000
|
$100.000
|
$124.000
|
$75.000
|
$45.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
540.000
|
$1.300
|
$4.350
|
$4.400
|
$4.000
|
$4.330
|
$10.000
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
80.000
|
$1.480
|
$4.350
|
$4.400
|
$4.000
|
$5.090
|
$10.000
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
30.000
|
$120.000
|
$2.000
|
$1.200
|
$5.000
|
$0.350
|
$1.000
|
$6.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,800.000
|
$0.200
|
$0.320
|
$0.330
|
$0.500
|
$5.290
|
$2.000
|
$0.650
|
|
|
PAVEMENT SEALER 24"
|
LF
|
200.000
|
$3.220
|
$3.250
|
$3.300
|
$4.000
|
$3.510
|
$6.000
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
45.000
|
$13.850
|
$16.000
|
$16.500
|
$15.000
|
$17.340
|
$20.000
|
$10.000
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
435.000
|
$15.710
|
$13.000
|
$13.250
|
$15.000
|
$12.760
|
$15.000
|
$10.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
92.000
|
$3.000
|
$5.500
|
$5.500
|
$5.000
|
$6.030
|
$10.000
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,800.000
|
$0.220
|
$0.270
|
$0.280
|
$0.250
|
$0.300
|
$1.000
|
$0.750
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
200.000
|
$3.300
|
$2.150
|
$2.200
|
$2.000
|
$2.460
|
$3.000
|
$1.000
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
1,326.000
|
$115.000
|
$115.000
|
$115.000
|
$130.000
|
$146.000
|
$120.000
|
$140.000
|
|
|
TACK COAT
|
GAL
|
721.000
|
$2.000
|
$4.000
|
$3.500
|
$6.000
|
$4.300
|
$10.000
|
$5.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$100.000
|
$250.000
|
$2,500.000
|
$2,000.000
|
$500.000
|
$1,500.000
|
$500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$7,492.000
|
$5,000.000
|
$18,000.000
|
$9,000.000
|
$8,500.000
|
$10,000.000
|
$10,000.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,200.000
|
$0.600
|
$0.270
|
$0.280
|
$0.500
|
$2.160
|
$2.000
|
$0.650
|
|
|
REFL PAV MRK AWT (W) 4" (SLD) (100MIL)
|
LF
|
2,300.000
|
$0.450
|
$1.100
|
$1.100
|
$1.250
|
$1.080
|
$1.000
|
$1.000
|
|
|
REFL PAV MRK AWT (Y) 4" (SLD) (100MIL)
|
LF
|
3,800.000
|
$0.450
|
$1.100
|
$1.100
|
$1.250
|
$1.070
|
$1.000
|
$1.000
|
|
|
TMA (STATIONARY)
|
DAY
|
120.000
|
$224.760
|
$100.000
|
$200.000
|
$100.000
|
$150.000
|
$200.000
|
$150.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
80.000
|
$17.460
|
$25.000
|
$25.000
|
$50.000
|
$85.000
|
$50.000
|
$85.000
|
|
Totals: |
$3,144,026.527
|
$3,399,554.870
|
$3,496,192.940
|
$3,712,682.400
|
$3,919,191.190
|
$4,031,937.800
|
$4,430,231.450
|