REMOVING CONC (MEDIANS)
|
SY
|
169.000
|
$32.000
|
$25.000
|
$25.000
|
$140.000
|
$50.000
|
$40.000
|
$30.000
|
$25.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,745.000
|
$6.000
|
$5.000
|
$10.000
|
$18.250
|
$15.000
|
$50.000
|
$8.000
|
$25.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
425.000
|
$25.000
|
$30.000
|
$25.000
|
$57.000
|
$30.000
|
$40.000
|
$25.000
|
$50.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
1,310.000
|
$1.000
|
$1.000
|
$2.000
|
$1.930
|
$1.000
|
$2.000
|
$1.830
|
$2.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
655.000
|
$0.750
|
$1.000
|
$2.000
|
$1.930
|
$1.000
|
$2.000
|
$1.950
|
$2.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
655.000
|
$0.750
|
$1.000
|
$2.000
|
$1.930
|
$1.000
|
$2.000
|
$1.850
|
$2.000
|
|
|
VEGETATIVE WATERING
|
MG
|
22.000
|
$15.000
|
$10.000
|
$20.000
|
$275.000
|
$60.000
|
$1.000
|
$15.000
|
$15.000
|
|
|
PLAN & TEXT CONC PAV(0" TO 3/4")
|
SY
|
468.000
|
$20.000
|
$98.000
|
$70.000
|
$82.500
|
$90.000
|
$80.000
|
$82.000
|
$147.000
|
|
|
PLAN & TEXT CONC PAV(0" TO 1-1/2")
|
SY
|
376.000
|
$20.000
|
$98.000
|
$65.000
|
$44.000
|
$80.000
|
$80.000
|
$82.000
|
$147.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
1,350.000
|
$10.000
|
$15.000
|
$8.250
|
$15.000
|
$3.000
|
$20.000
|
$12.000
|
$12.000
|
|
|
CONC STR REPAIR (EPOXY MORTAR)
|
SF
|
5.000
|
$100.000
|
$250.000
|
$315.000
|
$350.000
|
$400.000
|
$200.000
|
$200.000
|
$2,500.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
60.000
|
$88.000
|
$200.000
|
$200.000
|
$150.000
|
$100.000
|
$200.000
|
$125.000
|
$1,000.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
225.000
|
$185.000
|
$180.000
|
$140.000
|
$240.000
|
$200.000
|
$200.000
|
$185.000
|
$1,000.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
5.000
|
$200.000
|
$200.000
|
$350.000
|
$350.000
|
$150.000
|
$200.000
|
$200.000
|
$2,500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
143.000
|
$425.000
|
$400.000
|
$500.000
|
$1,000.000
|
$900.000
|
$500.000
|
$450.000
|
$450.000
|
|
|
CLEANING AND SEALING JOINTS
|
LF
|
995.000
|
$8.000
|
$55.000
|
$33.000
|
$44.000
|
$15.000
|
$30.000
|
$35.000
|
$75.000
|
|
|
CLEANING AND SEALING JOINTS (CL 7)
|
LF
|
995.000
|
$75.000
|
$65.000
|
$33.000
|
$44.000
|
$30.000
|
$40.000
|
$38.000
|
$75.000
|
|
|
CONCRETE OVERLAY (2 IN)
|
SY
|
2,707.000
|
$80.000
|
$21.000
|
$80.000
|
$71.000
|
$40.000
|
$100.000
|
$49.000
|
$100.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
1,132.000
|
$150.000
|
$190.000
|
$170.000
|
$171.000
|
$220.000
|
$200.000
|
$170.500
|
$250.000
|
|
|
RETROFIT RAIL (TY T221)
|
LF
|
600.000
|
$150.000
|
$200.000
|
$165.000
|
$150.000
|
$200.000
|
$250.000
|
$125.000
|
$250.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
LF
|
240.000
|
$85.000
|
$30.000
|
$125.000
|
$83.000
|
$400.000
|
$150.000
|
$160.000
|
$400.000
|
|
|
JOINT SEALANT
|
LF
|
240.000
|
$15.000
|
$25.000
|
$16.000
|
$20.000
|
$40.000
|
$30.000
|
$30.000
|
$125.000
|
|
|
HYDRO-DEMOLITION (1/2 IN)
|
SY
|
2,707.000
|
$50.000
|
$38.000
|
$40.000
|
$60.000
|
$10.000
|
$60.000
|
$110.000
|
$75.000
|
|
|
SHOT BLASTING
|
SY
|
3,373.000
|
$15.000
|
$15.000
|
$6.000
|
$5.500
|
$6.500
|
$10.000
|
$10.000
|
$7.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$200,000.000
|
$200,000.000
|
$220,000.000
|
$208,500.000
|
$330,000.000
|
$235,000.000
|
$250,000.000
|
$250,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
21.000
|
$2,500.000
|
$5,000.000
|
$5,000.000
|
$4,550.000
|
$6,000.000
|
$5,000.000
|
$1,400.000
|
$1,000.000
|
|
|
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
|
LF
|
850.000
|
$35.000
|
$75.000
|
$75.000
|
$35.000
|
$60.000
|
$70.000
|
$93.000
|
$100.000
|
|
|
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
1,275.000
|
$8.000
|
$25.000
|
$15.000
|
$12.000
|
$30.000
|
$20.000
|
$28.000
|
$25.000
|
|
|
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
850.000
|
$10.000
|
$25.000
|
$20.000
|
$13.500
|
$30.000
|
$20.000
|
$28.000
|
$25.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (48 )
|
LF
|
768.000
|
$160.000
|
$150.000
|
$135.000
|
$265.000
|
$300.000
|
$200.000
|
$205.000
|
$50.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,150.000
|
$20.000
|
$20.000
|
$20.000
|
$19.800
|
$28.000
|
$24.000
|
$19.800
|
$35.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
15.000
|
$1,750.000
|
$1,500.000
|
$1,500.000
|
$1,485.000
|
$1,500.000
|
$1,600.000
|
$1,485.000
|
$2,500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,000.000
|
$788.000
|
$1,200.000
|
$1,193.500
|
$1,500.000
|
$900.000
|
$1,193.500
|
$5,000.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
4.000
|
$1,225.000
|
$625.000
|
$600.000
|
$577.500
|
$1,000.000
|
$800.000
|
$577.500
|
$5,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,125.000
|
$2.000
|
$2.000
|
$2.500
|
$2.480
|
$3.000
|
$3.000
|
$2.460
|
$25.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
16.000
|
$275.000
|
$200.000
|
$220.000
|
$220.000
|
$400.000
|
$300.000
|
$220.000
|
$500.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
4.000
|
$100.000
|
$250.000
|
$220.000
|
$220.000
|
$400.000
|
$300.000
|
$220.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
15.000
|
$2,500.000
|
$2,475.000
|
$2,500.000
|
$2,502.500
|
$2,500.000
|
$2,600.000
|
$2,502.500
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$350.000
|
$300.000
|
$220.000
|
$220.000
|
$400.000
|
$400.000
|
$220.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
3.000
|
$10,000.000
|
$9,500.000
|
$10,500.000
|
$10,257.500
|
$8,000.000
|
$10,000.000
|
$10,257.500
|
$10,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$350.000
|
$2,500.000
|
$2,200.000
|
$2,200.000
|
$1,500.000
|
$3,000.000
|
$2,200.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$1,000.000
|
$550.000
|
$550.000
|
$1,500.000
|
$900.000
|
$550.000
|
$1,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
45.000
|
$35.000
|
$24.000
|
$20.000
|
$16.500
|
$60.000
|
$30.000
|
$16.500
|
$30.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
3.000
|
$35.000
|
$24.000
|
$20.000
|
$16.500
|
$60.000
|
$30.000
|
$16.500
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
66.000
|
$30.000
|
$29.000
|
$35.000
|
$33.000
|
$60.000
|
$40.000
|
$33.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
|
EA
|
42.000
|
$30.000
|
$24.000
|
$35.000
|
$33.000
|
$60.000
|
$40.000
|
$33.000
|
$50.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
2,220.000
|
$3.000
|
$4.000
|
$4.400
|
$4.400
|
$3.000
|
$5.000
|
$4.400
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
3,236.000
|
$3.000
|
$4.000
|
$4.400
|
$4.400
|
$4.000
|
$5.000
|
$4.400
|
$5.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
3,757.000
|
$0.250
|
$1.000
|
$1.100
|
$1.100
|
$2.000
|
$2.000
|
$1.100
|
$3.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
2.000
|
$32.000
|
$100.000
|
$110.000
|
$110.000
|
$200.000
|
$120.000
|
$110.000
|
$1,000.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$325.000
|
$250.000
|
$275.000
|
$275.000
|
$400.000
|
$260.000
|
$275.000
|
$1,000.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
18.000
|
$11.000
|
$5.000
|
$5.500
|
$5.500
|
$20.000
|
$6.000
|
$5.500
|
$100.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
18.000
|
$11.000
|
$5.000
|
$5.500
|
$5.500
|
$20.000
|
$6.000
|
$5.500
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
3,757.000
|
$0.100
|
$1.000
|
$1.100
|
$1.100
|
$2.000
|
$1.500
|
$1.100
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
2.000
|
$35.000
|
$100.000
|
$110.000
|
$110.000
|
$300.000
|
$120.000
|
$110.000
|
$25.000
|
|
|
CRACK CLEANING AND SEALING (JCP)
|
LF
|
600.000
|
$2.500
|
$55.000
|
$13.000
|
$15.000
|
$15.000
|
$20.000
|
$22.000
|
$25.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
245.000
|
$95.000
|
$75.000
|
$85.000
|
$100.000
|
$40.000
|
$120.000
|
$150.000
|
$200.000
|
|
|
CARBON FIBER REINF POLYMER PROTECTION
|
SF
|
180.000
|
$35.000
|
$100.000
|
$85.000
|
$82.500
|
$300.000
|
$100.000
|
$80.000
|
$100.000
|
|
|
POLYESTER POLYMER CONC OVERLAY (3/4")
|
SY
|
3,373.000
|
$100.000
|
$95.000
|
$135.000
|
$108.000
|
$100.000
|
$170.000
|
$250.000
|
$143.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$7,500.000
|
$10,000.000
|
$20,000.000
|
$23,000.000
|
$12,000.000
|
$6,000.000
|
$8,000.000
|
$20,000.000
|
|
|
PREFB PV MK W/WNTY TY B (W)(6")(SLD)
|
LF
|
1,212.000
|
$8.000
|
$6.000
|
$6.600
|
$6.600
|
$6.000
|
$7.000
|
$6.600
|
$10.000
|
|
|
PREFB PV MK W/WNTY TY B(W)6"(BRK)CNTST
|
LF
|
300.000
|
$10.000
|
$8.000
|
$8.800
|
$8.800
|
$12.000
|
$10.000
|
$8.800
|
$10.000
|
|
|
PREFB PV MK W/WNTY TY B (Y)(6")(SLD)
|
LF
|
1,060.000
|
$8.000
|
$6.000
|
$6.600
|
$6.600
|
$12.000
|
$7.000
|
$6.600
|
$10.000
|
|
|
PREFB PV MK W/WNTY TY B(Y)6"(BRK)CNTST
|
LF
|
63.000
|
$10.000
|
$8.000
|
$8.800
|
$8.800
|
$12.000
|
$10.000
|
$8.800
|
$10.000
|
|
|
PREFB PV MK W/WNTY TY B(Y)6"(SLD)CNTST
|
LF
|
1,122.000
|
$15.000
|
$8.000
|
$8.800
|
$8.800
|
$12.000
|
$10.000
|
$8.800
|
$10.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$4,500.000
|
$10,000.000
|
$30,000.000
|
$39,000.000
|
$5,000.000
|
$16,000.000
|
$12,000.000
|
$5,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
20.000
|
$25.000
|
$100.000
|
$50.000
|
$100.000
|
$500.000
|
$30.000
|
$27.500
|
$500.000
|
|
Totals: |
$1,955,599.450
|
$2,087,956.000
|
$2,296,341.000
|
$2,452,659.350
|
$2,476,053.500
|
$2,802,336.500
|
$2,814,823.800
|
$3,204,221.000
|