REMOVING CONC (RIPRAP)
|
SY
|
22.000
|
$20.000
|
$17.000
|
$25.000
|
$200.000
|
$50.000
|
$150.000
|
|
|
REMOVE CONC (MISC)
|
EA
|
2.000
|
$1,000.000
|
$2,200.000
|
$500.000
|
$9,100.000
|
$2,000.000
|
$2,500.000
|
|
|
REMOVING STAB BASE & ASPH PAV(13"-18")
|
SY
|
166.000
|
$12.000
|
$19.000
|
$15.000
|
$206.000
|
$50.000
|
$200.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
467.000
|
$18.000
|
$18.000
|
$30.000
|
$62.000
|
$50.000
|
$200.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
1,423.000
|
$1.000
|
$0.570
|
$1.000
|
$1.150
|
$2.000
|
$4.000
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
1,423.000
|
$0.200
|
$0.600
|
$1.000
|
$1.150
|
$2.000
|
$4.000
|
|
|
VEGETATIVE WATERING
|
MG
|
46.000
|
$20.000
|
$15.000
|
$10.000
|
$100.000
|
$50.000
|
$30.000
|
|
|
CEM STABIL BKFL
|
CY
|
28.000
|
$155.000
|
$261.000
|
$180.000
|
$465.000
|
$500.000
|
$600.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
11.000
|
$245.000
|
$285.000
|
$250.000
|
$455.000
|
$700.000
|
$500.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
62.000
|
$640.000
|
$845.000
|
$850.000
|
$1,050.000
|
$900.000
|
$750.000
|
|
|
EPOXY WATERPROOF FINISH
|
SF
|
630.000
|
$8.000
|
$24.000
|
$36.000
|
$23.000
|
$22.000
|
$25.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
1,199.000
|
$50.000
|
$19.700
|
$25.000
|
$19.000
|
$20.000
|
$10.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
3.000
|
$1,000.000
|
$800.000
|
$1,500.000
|
$1,000.000
|
$2,000.000
|
$250.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
169.000
|
$220.000
|
$137.250
|
$350.000
|
$215.000
|
$300.000
|
$350.000
|
|
|
CONC STR REPAIR (PAN GIRDER HOLE REPR)
|
EA
|
32.000
|
$200.000
|
$125.000
|
$250.000
|
$110.000
|
$150.000
|
$200.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
22.000
|
$450.000
|
$460.000
|
$650.000
|
$1,055.000
|
$700.000
|
$600.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
50.000
|
$150.000
|
$128.000
|
$250.000
|
$325.000
|
$400.000
|
$400.000
|
|
|
BEDDING MATERIAL (6 IN)
|
CY
|
13.000
|
$200.000
|
$110.000
|
$180.000
|
$930.000
|
$400.000
|
$250.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
48.000
|
$450.000
|
$430.000
|
$550.000
|
$821.000
|
$650.000
|
$600.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
373.000
|
$30.000
|
$23.000
|
$51.000
|
$40.000
|
$45.000
|
$33.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
610.000
|
$40.000
|
$22.000
|
$55.000
|
$25.000
|
$45.000
|
$30.000
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
533.000
|
$25.000
|
$17.000
|
$35.000
|
$10.000
|
$30.000
|
$17.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
357.000
|
$190.000
|
$205.000
|
$250.000
|
$336.000
|
$220.000
|
$400.000
|
|
|
ARMOR JOINT
|
LF
|
51.000
|
$80.000
|
$110.000
|
$180.000
|
$200.000
|
$300.000
|
$300.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
157.000
|
$460.000
|
$340.000
|
$350.000
|
$500.000
|
$500.000
|
$400.000
|
|
|
JOINT SEALANT
|
LF
|
773.000
|
$20.000
|
$16.000
|
$25.000
|
$10.000
|
$25.000
|
$25.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$63,180.000
|
$62,000.000
|
$120,000.000
|
$96,700.000
|
$95,000.000
|
$100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$4,000.000
|
$4,800.000
|
$5,000.000
|
$4,400.000
|
$12,000.000
|
$7,500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 3)
|
SY
|
468.000
|
$35.000
|
$22.000
|
$35.000
|
$67.000
|
$40.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
468.000
|
$9.000
|
$10.000
|
$10.000
|
$22.350
|
$10.000
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,700.000
|
$3.000
|
$2.450
|
$3.000
|
$3.350
|
$4.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,700.000
|
$2.000
|
$1.000
|
$1.000
|
$1.150
|
$1.000
|
$1.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
3.000
|
$6,000.000
|
$4,700.000
|
$7,000.000
|
$2,500.000
|
$10,000.000
|
$4,000.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
220.000
|
$35.000
|
$75.000
|
$25.000
|
$110.000
|
$100.000
|
$35.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$40.000
|
$85.000
|
$95.000
|
$110.000
|
$100.000
|
$40.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
220.000
|
$5.000
|
$5.000
|
$10.000
|
$20.000
|
$20.000
|
$10.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$10.000
|
$5.000
|
$10.000
|
$20.000
|
$20.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
220.000
|
$15.000
|
$12.000
|
$25.000
|
$75.000
|
$10.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$15.000
|
$12.000
|
$25.000
|
$75.000
|
$10.000
|
$10.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
700.000
|
$25.000
|
$27.500
|
$30.000
|
$29.400
|
$30.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,800.000
|
$2,000.000
|
$2,800.000
|
$2,180.000
|
$2,000.000
|
$3,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
800.000
|
$4.000
|
$2.500
|
$2.000
|
$2.250
|
$3.000
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,000.000
|
$3,300.000
|
$3,000.000
|
$3,375.000
|
$3,500.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$350.000
|
$300.000
|
$250.000
|
$224.000
|
$250.000
|
$1,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$25.000
|
$18.000
|
$35.000
|
$38.000
|
$30.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
14.000
|
$30.000
|
$40.000
|
$35.000
|
$43.600
|
$50.000
|
$25.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
90.000
|
$4.000
|
$11.000
|
$2.000
|
$11.100
|
$11.000
|
$11.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
192.000
|
$4.000
|
$11.000
|
$2.000
|
$11.100
|
$11.000
|
$11.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
270.000
|
$3.000
|
$11.000
|
$2.000
|
$11.100
|
$11.000
|
$11.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
576.000
|
$4.000
|
$11.000
|
$2.000
|
$11.100
|
$11.000
|
$11.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$22.000
|
$11.000
|
$10.000
|
$11.100
|
$11.000
|
$11.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
329.000
|
$1.000
|
$5.000
|
$2.000
|
$4.000
|
$6.000
|
$11.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
3,380.000
|
$0.500
|
$0.550
|
$1.000
|
$0.560
|
$0.600
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
49.000
|
$3.000
|
$11.000
|
$1.000
|
$11.100
|
$11.000
|
$11.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,780.000
|
$0.500
|
$1.650
|
$1.000
|
$1.700
|
$1.750
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
3,380.000
|
$0.500
|
$0.550
|
$1.000
|
$0.560
|
$0.600
|
$2.000
|
|
|
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
|
LF
|
14.000
|
$25.000
|
$200.000
|
$50.000
|
$45.000
|
$250.000
|
$110.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
280.000
|
$120.000
|
$85.000
|
$100.000
|
$75.000
|
$150.000
|
$125.000
|
|
|
REFL PAV MRK AWT (W) 4" (SLD) (100MIL)
|
LF
|
600.000
|
$0.500
|
$1.100
|
$1.000
|
$1.120
|
$1.200
|
$1.000
|
|
|
REFL PAV MRK AWT (Y) 4" (SLD) (100MIL)
|
LF
|
2,010.000
|
$0.500
|
$1.100
|
$2.000
|
$1.120
|
$1.200
|
$1.000
|
|
|
REFL PAV MRK AWT (Y) 4" (BRK) (100MIL)
|
LF
|
770.000
|
$0.500
|
$1.100
|
$2.000
|
$1.120
|
$1.200
|
$1.000
|
|
|
TMA (STATIONARY)
|
DAY
|
58.000
|
$200.000
|
$80.000
|
$250.000
|
$350.000
|
$400.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
20.000
|
$65.000
|
$100.000
|
$50.000
|
$100.000
|
$50.000
|
$10.000
|
|
Totals: |
$695,253.600
|
$639,848.460
|
$856,487.000
|
$972,488.400
|
$999,114.000
|
$1,028,575.000
|