REMOVING CONC (RIPRAP)
|
CY
|
16.000
|
$165.000
|
$125.000
|
$152.570
|
$350.000
|
$30.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
650.000
|
$9.750
|
$13.500
|
$12.910
|
$25.000
|
$15.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY A)
|
CY
|
1,964.000
|
$25.000
|
$22.000
|
$29.020
|
$18.000
|
$30.000
|
|
|
BACKFILL (TY A)
|
STA
|
1,158.530
|
$222.600
|
$200.000
|
$171.540
|
$240.000
|
$250.000
|
|
|
BACKFILL (TY B)
|
STA
|
992.000
|
$175.000
|
$100.000
|
$161.690
|
$240.000
|
$200.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
37,000.000
|
$0.250
|
$0.120
|
$0.100
|
$0.100
|
$0.140
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
66,989.000
|
$0.600
|
$0.570
|
$0.690
|
$0.650
|
$0.620
|
|
|
VEGETATIVE WATERING
|
MG
|
1,061.000
|
$10.000
|
$10.000
|
$1.170
|
$1.000
|
$15.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
43,136.000
|
$125.000
|
$141.500
|
$165.520
|
$165.000
|
$170.000
|
|
|
TACK COAT
|
GAL
|
39,219.000
|
$3.600
|
$3.250
|
$3.520
|
$3.500
|
$6.000
|
|
|
TBPFC (MEMBRANE)
|
GAL
|
35,250.000
|
$2.770
|
$3.250
|
$3.940
|
$4.350
|
$4.000
|
|
|
TBPFC (ASPHALT)(PG 76-22)
|
TON
|
503.000
|
$118.000
|
$185.500
|
$126.890
|
$180.000
|
$180.000
|
|
|
TBPFC (AGGREGATE) (SAC-A)
|
TON
|
7,109.000
|
$118.000
|
$185.500
|
$158.380
|
$180.000
|
$180.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
369.000
|
$160.000
|
$125.000
|
$55.130
|
$90.000
|
$60.000
|
|
|
FLEX PAVEMENT STRUCTURE REPAIR (2-8")
|
SY
|
600.000
|
$35.380
|
$92.500
|
$64.590
|
$98.000
|
$80.000
|
|
|
PLAN & TEXT ASPH CONC PAV(2" TO 4")
|
SY
|
2,536.000
|
$4.000
|
$4.850
|
$3.240
|
$3.700
|
$6.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
392,144.000
|
$1.500
|
$1.350
|
$1.620
|
$1.250
|
$2.250
|
|
|
PLANE ASPH CONC PAV (10")
|
SY
|
1,778.000
|
$10.000
|
$14.750
|
$8.620
|
$5.250
|
$20.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 1 1/2")
|
SY
|
29,560.000
|
$3.000
|
$4.850
|
$2.410
|
$1.600
|
$4.000
|
|
|
PLANE ASPH CONC PAV (0" TO 1/2" MICRO)
|
SY
|
23,259.000
|
$5.000
|
$4.000
|
$1.850
|
$1.650
|
$4.000
|
|
|
FULL - DEPTH REPAIR CRCP (8")
|
SY
|
678.900
|
$400.000
|
$470.000
|
$194.450
|
$300.000
|
$448.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
150.000
|
$210.000
|
$485.000
|
$230.510
|
$300.000
|
$300.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
58.000
|
$35.000
|
$50.000
|
$3.370
|
$50.000
|
$30.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
360.000
|
$40.000
|
$20.000
|
$17.580
|
$74.000
|
$50.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
1.000
|
$500.000
|
$2,600.000
|
$2,089.610
|
$2,500.000
|
$2,000.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
103.000
|
$450.000
|
$530.000
|
$404.090
|
$525.000
|
$600.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
56.000
|
$175.000
|
$300.000
|
$242.340
|
$165.000
|
$200.000
|
|
|
SET (TY I) (42 IN) (6: 1) (C)
|
EA
|
1.000
|
$4,500.000
|
$4,400.000
|
$6,519.740
|
$8,600.000
|
$15,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
56.000
|
$15.000
|
$100.000
|
$17.540
|
$48.000
|
$25.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,076,000.000
|
$147,000.000
|
$1,274,253.400
|
$1,100,000.000
|
$1,400,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$4,500.000
|
$13,250.000
|
$17,535.600
|
$7,500.000
|
$50,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
200.000
|
$5.000
|
$3.000
|
$4.510
|
$5.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
200.000
|
$1.250
|
$0.500
|
$1.400
|
$3.000
|
$1.000
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
960.000
|
$80.000
|
$124.500
|
$86.050
|
$95.000
|
$100.000
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
480.000
|
$10.000
|
$27.000
|
$11.280
|
$14.000
|
$20.000
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
960.000
|
$10.000
|
$52.000
|
$9.730
|
$20.000
|
$20.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
225,640.000
|
$0.370
|
$0.250
|
$0.070
|
$0.120
|
$0.250
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,913.000
|
$20.000
|
$25.500
|
$12.200
|
$28.100
|
$28.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
113.000
|
$50.000
|
$85.000
|
$43.850
|
$94.000
|
$100.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
11.000
|
$1,250.000
|
$1,375.000
|
$1,260.220
|
$1,515.000
|
$1,600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,850.000
|
$2.500
|
$2.250
|
$2.520
|
$2.500
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
11.000
|
$220.000
|
$150.000
|
$212.140
|
$165.000
|
$200.000
|
|
|
CABLE BARRIER SYSTEM (TL-3)
|
LF
|
150.000
|
$20.000
|
$35.000
|
$29.880
|
$45.000
|
$20.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
150.000
|
$10.000
|
$20.000
|
$7.200
|
$8.500
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
11.000
|
$2,500.000
|
$3,225.000
|
$2,364.060
|
$3,550.000
|
$3,800.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
11.000
|
$220.000
|
$200.000
|
$285.820
|
$220.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$3,500.000
|
$2,000.000
|
$1,352.050
|
$1,650.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,750.000
|
$1,000.000
|
$732.020
|
$880.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$15,000.000
|
$10,250.000
|
$2,817.380
|
$10,800.000
|
$12,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
4.000
|
$50.000
|
$50.000
|
$116.900
|
$17.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
4.000
|
$20.000
|
$50.000
|
$116.900
|
$17.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
45.000
|
$25.000
|
$35.000
|
$28.260
|
$39.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
28.000
|
$22.000
|
$35.000
|
$29.330
|
$39.000
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
24,435.000
|
$0.200
|
$0.150
|
$0.180
|
$0.170
|
$0.160
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
9,904.000
|
$0.250
|
$0.220
|
$0.260
|
$0.250
|
$0.240
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
33,300.000
|
$0.220
|
$0.220
|
$0.260
|
$0.250
|
$0.240
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
5,880.000
|
$0.550
|
$0.300
|
$0.380
|
$0.350
|
$0.330
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
17,395.000
|
$0.500
|
$0.150
|
$0.180
|
$0.170
|
$0.160
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
33,300.000
|
$0.220
|
$0.220
|
$0.260
|
$0.250
|
$0.240
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
25,344.000
|
$0.420
|
$0.010
|
$2.130
|
$1.400
|
$4.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,295.000
|
$1.120
|
$1.000
|
$1.170
|
$1.100
|
$1.100
|
|
PREFAB PAV MRK TY C (W) (NUMBER)
|
EA
|
24.000
|
$233.330
|
$125.000
|
$146.130
|
$137.500
|
$140.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,727.000
|
$2.910
|
$3.700
|
$4.330
|
$4.100
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
10,905.000
|
$1.250
|
$0.750
|
$0.880
|
$0.830
|
$0.800
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
4,782.000
|
$121.940
|
$146.750
|
$133.820
|
$145.000
|
$150.000
|
|
|
TACK COAT
|
GAL
|
18,965.000
|
$3.670
|
$0.010
|
$4.240
|
$3.500
|
$4.000
|
|
|
SP MIXES SP-C OR SP-D PG 70-22
|
TON
|
1,059.000
|
$135.000
|
$109.500
|
$126.890
|
$138.000
|
$150.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
8.000
|
$6,436.100
|
$15,000.000
|
$3,507.120
|
$18,000.000
|
$40,000.000
|
|
|
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
|
LF
|
109,880.000
|
$0.520
|
$0.550
|
$0.640
|
$0.610
|
$0.600
|
|
|
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
|
LF
|
29,076.000
|
$0.620
|
$0.650
|
$0.640
|
$0.720
|
$0.700
|
|
|
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
|
LF
|
116,300.000
|
$0.580
|
$0.550
|
$0.640
|
$0.610
|
$0.600
|
|
|
TMA (STATIONARY)
|
DAY
|
157.000
|
$104.800
|
$150.000
|
$175.360
|
$200.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
82.000
|
$31.690
|
$1.000
|
$292.260
|
$200.000
|
$200.000
|
|
Totals: |
$10,866,753.828
|
$11,381,826.000
|
$12,982,343.461
|
$13,253,745.270
|
$15,153,029.740
|