PREPARING ROW
|
STA
|
23.000
|
$2,000.000
|
$1,750.000
|
$1,700.000
|
$2,500.000
|
$1,500.000
|
$1,500.000
|
$2,500.000
|
$7,500.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
65.000
|
$16.000
|
$50.000
|
$15.000
|
$25.000
|
$10.000
|
$25.000
|
$25.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
22,898.000
|
$6.000
|
$4.750
|
$2.500
|
$5.000
|
$3.500
|
$10.000
|
$9.000
|
$10.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
57,009.000
|
$7.000
|
$4.850
|
$7.750
|
$8.000
|
$6.000
|
$9.000
|
$12.000
|
$10.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
31,700.000
|
$1.000
|
$1.500
|
$1.340
|
$1.000
|
$0.600
|
$3.000
|
$1.500
|
$4.000
|
|
|
BLOCK SODDING
|
SY
|
1,610.000
|
$6.000
|
$5.050
|
$4.780
|
$5.000
|
$5.000
|
$5.000
|
$4.000
|
$5.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
30,090.000
|
$0.900
|
$1.050
|
$0.600
|
$1.050
|
$1.100
|
$0.940
|
$0.350
|
$1.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
20,000.000
|
$0.900
|
$1.050
|
$0.690
|
$1.050
|
$1.100
|
$0.950
|
$0.350
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
510.000
|
$10.000
|
$10.000
|
$25.000
|
$8.000
|
$60.000
|
$10.000
|
$1.000
|
$1.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
8,680.000
|
$2.700
|
$1.450
|
$1.490
|
$1.500
|
$1.500
|
$1.320
|
$3.000
|
$2.000
|
|
|
FL BS(CMP IN PLC)(TY D GR 4)(9")
|
SY
|
5,207.000
|
$16.000
|
$21.250
|
$23.000
|
$30.000
|
$20.250
|
$23.000
|
$19.750
|
$26.000
|
|
|
CEMENT
|
TON
|
88.000
|
$160.000
|
$190.000
|
$200.000
|
$175.000
|
$161.000
|
$160.000
|
$150.000
|
$200.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
6,658.000
|
$3.000
|
$2.000
|
$3.500
|
$4.000
|
$4.500
|
$2.000
|
$5.000
|
$6.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (2 TO 4")
|
SY
|
4,400.000
|
$3.000
|
$5.000
|
$3.700
|
$2.000
|
$3.500
|
$5.000
|
$7.000
|
$4.000
|
|
|
PRIME COAT & BLOTTER (MC-30)
|
GAL
|
1,265.000
|
$6.000
|
$4.250
|
$6.600
|
$7.000
|
$6.000
|
$7.000
|
$5.500
|
$8.000
|
|
|
ASPH (AC-10)
|
GAL
|
2,420.000
|
$3.000
|
$3.650
|
$4.400
|
$9.000
|
$6.000
|
$7.000
|
$5.000
|
$8.000
|
|
|
AGGR(TY-PB GR-3 SAC-A)
|
CY
|
56.000
|
$125.000
|
$215.000
|
$215.000
|
$400.000
|
$180.000
|
$180.000
|
$250.000
|
$400.000
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
57.000
|
$105.000
|
$220.000
|
$215.000
|
$400.000
|
$180.000
|
$180.000
|
$250.000
|
$400.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
2,228.000
|
$3.500
|
$4.350
|
$4.350
|
$9.500
|
$6.000
|
$4.500
|
$5.000
|
$8.000
|
|
|
D-GR HMA(SQ) TY-D PG64-22
|
TON
|
294.000
|
$150.000
|
$125.000
|
$144.000
|
$135.000
|
$200.000
|
$180.000
|
$200.000
|
$200.000
|
|
|
CEM STABIL BKFL
|
CY
|
335.000
|
$150.000
|
$175.000
|
$185.000
|
$200.000
|
$170.000
|
$180.000
|
$250.000
|
$200.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
432.000
|
$200.000
|
$190.000
|
$174.000
|
$170.000
|
$130.000
|
$180.000
|
$175.000
|
$160.000
|
|
|
CL C CONC (ABUT)
|
CY
|
44.000
|
$1,000.000
|
$910.000
|
$900.000
|
$950.000
|
$950.000
|
$785.000
|
$1,100.000
|
$1,000.000
|
|
|
CL C CONC (BENT)
|
CY
|
74.000
|
$1,100.000
|
$900.000
|
$950.000
|
$950.000
|
$950.000
|
$900.000
|
$1,100.000
|
$1,000.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
4.000
|
$1,500.000
|
$1,650.000
|
$950.000
|
$600.000
|
$500.000
|
$1,500.000
|
$600.000
|
$600.000
|
|
|
REINF CONC SLAB
|
SF
|
8,670.000
|
$16.500
|
$20.500
|
$18.000
|
$20.000
|
$19.000
|
$18.000
|
$25.000
|
$20.000
|
|
|
APPROACH SLAB
|
CY
|
72.000
|
$800.000
|
$575.000
|
$500.000
|
$500.000
|
$450.000
|
$500.000
|
$750.000
|
$550.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
1,014.000
|
$175.000
|
$155.000
|
$152.000
|
$165.000
|
$129.000
|
$148.000
|
$175.000
|
$145.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
10.000
|
$500.000
|
$525.000
|
$550.000
|
$600.000
|
$650.000
|
$500.000
|
$500.000
|
$500.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
250.000
|
$600.000
|
$455.000
|
$425.000
|
$400.000
|
$350.000
|
$450.000
|
$500.000
|
$450.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
86.000
|
$135.000
|
$205.000
|
$200.000
|
$180.000
|
$145.000
|
$180.000
|
$500.000
|
$150.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
24.000
|
$550.000
|
$580.000
|
$425.000
|
$425.000
|
$400.000
|
$450.000
|
$350.000
|
$400.000
|
|
|
RAIL (TY T552)
|
LF
|
550.000
|
$65.000
|
$90.000
|
$126.000
|
$100.000
|
$140.000
|
$130.000
|
$100.000
|
$80.000
|
|
|
ARMOR JOINT
|
LF
|
65.000
|
$100.000
|
$40.000
|
$85.000
|
$40.000
|
$65.000
|
$110.000
|
$100.000
|
$100.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
60.000
|
$200.000
|
$55.000
|
$85.000
|
$75.000
|
$85.000
|
$110.000
|
$100.000
|
$100.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
341.000
|
$60.000
|
$62.000
|
$60.000
|
$55.000
|
$52.000
|
$46.000
|
$50.000
|
$50.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$1,000.000
|
$615.000
|
$650.000
|
$650.000
|
$700.000
|
$850.000
|
$750.000
|
$1,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$1,100.000
|
$915.000
|
$885.000
|
$950.000
|
$1,100.000
|
$1,075.000
|
$850.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
238.000
|
$15.000
|
$20.000
|
$10.000
|
$12.000
|
$10.000
|
$30.000
|
$10.000
|
$20.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$260,000.000
|
$150,000.000
|
$240,000.000
|
$160,000.000
|
$255,000.000
|
$150,000.000
|
$250,000.000
|
$250,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$2,500.000
|
$2,000.000
|
$2,725.000
|
$2,000.000
|
$10,000.000
|
$1,500.000
|
$6,000.000
|
$12,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
100.000
|
$50.000
|
$26.000
|
$22.500
|
$25.000
|
$35.000
|
$22.000
|
$100.000
|
$50.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
120.000
|
$60.000
|
$38.000
|
$34.500
|
$36.000
|
$45.000
|
$33.000
|
$100.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
220.000
|
$9.000
|
$11.000
|
$9.500
|
$5.000
|
$10.000
|
$9.000
|
$10.000
|
$20.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
100.000
|
$35.000
|
$40.000
|
$20.000
|
$40.000
|
$50.000
|
$100.000
|
$100.000
|
$50.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,100.000
|
$4.000
|
$2.900
|
$2.900
|
$3.000
|
$4.000
|
$3.000
|
$4.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,100.000
|
$1.000
|
$0.950
|
$1.200
|
$0.500
|
$1.500
|
$1.000
|
$1.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
5,641.000
|
$60.000
|
$60.000
|
$57.000
|
$55.000
|
$85.000
|
$64.000
|
$75.000
|
$80.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
178.000
|
$70.000
|
$85.000
|
$90.000
|
$95.000
|
$60.000
|
$100.000
|
$60.000
|
$60.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
309.000
|
$25.000
|
$48.000
|
$45.000
|
$45.000
|
$20.000
|
$35.000
|
$60.000
|
$50.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
350.000
|
$25.000
|
$18.750
|
$18.000
|
$20.000
|
$20.000
|
$18.000
|
$20.000
|
$20.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,000.000
|
$1,625.000
|
$1,550.000
|
$1,800.000
|
$1,475.000
|
$150.000
|
$1,475.000
|
$1,500.000
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY I)
|
EA
|
4.000
|
$2,500.000
|
$2,400.000
|
$1,700.000
|
$2,400.000
|
$2,075.000
|
$2,250.000
|
$2,075.000
|
$2,200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-EXAL)
|
EA
|
2.000
|
$1,000.000
|
$1,125.000
|
$1,000.000
|
$1,130.000
|
$1,130.000
|
$1,028.000
|
$30.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
12.000
|
$500.000
|
$405.000
|
$391.000
|
$405.000
|
$405.000
|
$368.000
|
$50.000
|
$800.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
2.000
|
$500.000
|
$445.000
|
$450.000
|
$445.000
|
$445.000
|
$405.000
|
$500.000
|
$600.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
12.000
|
$75.000
|
$115.000
|
$100.000
|
$75.000
|
$115.000
|
$105.000
|
$230.000
|
$200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
8.000
|
$20.000
|
$26.000
|
$31.900
|
$20.000
|
$97.000
|
$20.000
|
$30.000
|
$30.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
4.000
|
$75.000
|
$85.000
|
$95.260
|
$150.000
|
$148.000
|
$100.000
|
$65.000
|
$80.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
10.000
|
$40.000
|
$32.000
|
$35.500
|
$35.000
|
$119.000
|
$30.000
|
$50.000
|
$30.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
9,704.000
|
$0.300
|
$0.330
|
$0.320
|
$0.330
|
$0.350
|
$0.300
|
$0.350
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
9,704.000
|
$0.300
|
$0.330
|
$0.320
|
$0.330
|
$0.350
|
$0.300
|
$0.350
|
$0.400
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
250.000
|
$1.500
|
$1.450
|
$2.000
|
$2.000
|
$0.500
|
$1.000
|
$1.000
|
$5.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,240.000
|
$1.000
|
$0.280
|
$0.280
|
$0.280
|
$0.300
|
$0.250
|
$0.350
|
$0.300
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
81.000
|
$20.000
|
$16.500
|
$16.000
|
$16.500
|
$16.500
|
$15.000
|
$20.000
|
$20.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
125.000
|
$4.000
|
$5.500
|
$5.500
|
$5.500
|
$6.250
|
$5.000
|
$6.000
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
4,000.000
|
$0.750
|
$1.100
|
$1.050
|
$1.100
|
$1.250
|
$1.000
|
$1.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
8,829.000
|
$0.100
|
$0.110
|
$0.110
|
$0.110
|
$0.150
|
$0.100
|
$0.150
|
$0.200
|
|
|
REFL PAV MRK AWT (W) 4" (SLD) (100MIL)
|
LF
|
4,251.000
|
$0.650
|
$0.770
|
$0.750
|
$0.800
|
$0.800
|
$0.700
|
$0.750
|
$0.800
|
|
|
REFL PAV MRK AWT (Y) 4" (SLD) (100MIL)
|
LF
|
4,578.000
|
$0.650
|
$0.770
|
$0.750
|
$0.800
|
$0.800
|
$0.700
|
$0.750
|
$0.800
|
|
Totals: |
$2,544,726.150
|
$2,284,633.310
|
$2,449,449.990
|
$2,532,275.730
|
$2,565,815.850
|
$2,697,670.800
|
$3,204,450.150
|
$3,303,028.200
|