PREPARING ROW
|
AC
|
0.420
|
$25,000.000
|
$34,000.000
|
$200,000.000
|
$14,000.000
|
$95,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
396.000
|
$40.000
|
$6.300
|
$20.000
|
$21.000
|
$25.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
602.000
|
$15.000
|
$5.000
|
$10.000
|
$14.000
|
$15.000
|
|
|
REMOVING STAB BASE & ASPH PAV (4"-12")
|
SY
|
2,262.000
|
$15.000
|
$12.280
|
$11.000
|
$8.000
|
$25.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,251.000
|
$25.000
|
$12.000
|
$20.000
|
$14.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
799.000
|
$30.000
|
$12.000
|
$35.000
|
$20.000
|
$25.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
7,295.000
|
$4.500
|
$4.400
|
$3.500
|
$5.000
|
$3.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
7,295.000
|
$1.000
|
$1.790
|
$0.650
|
$0.660
|
$1.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
3,648.000
|
$1.000
|
$0.010
|
$0.630
|
$0.660
|
$1.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
3,648.000
|
$1.000
|
$0.010
|
$0.610
|
$0.660
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
233.000
|
$130.000
|
$20.000
|
$7.000
|
$40.000
|
$1.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
4,736.000
|
$2.500
|
$0.840
|
$1.000
|
$1.100
|
$1.000
|
|
|
FL BS (RDWY DEL)(TY D GR 5)(FNAL POS)
|
CY
|
707.000
|
$75.000
|
$213.500
|
$135.000
|
$158.000
|
$120.000
|
|
|
CEMENT
|
TON
|
55.000
|
$260.000
|
$250.000
|
$300.000
|
$288.000
|
$300.000
|
|
|
CEMENT TREAT (NEW BASE)(DC)(8")
|
SY
|
3,183.000
|
$4.000
|
$5.250
|
$7.000
|
$8.850
|
$12.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
796.000
|
$10.000
|
$13.650
|
$7.000
|
$6.900
|
$8.000
|
|
|
CEM STABIL BKFL
|
CY
|
219.000
|
$250.000
|
$261.000
|
$325.000
|
$330.000
|
$275.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
610.000
|
$325.000
|
$199.100
|
$235.000
|
$350.000
|
$210.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
53.000
|
$1,700.000
|
$1,100.000
|
$1,150.000
|
$1,400.000
|
$1,400.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
20.500
|
$1,700.000
|
$1,100.000
|
$1,250.000
|
$2,100.000
|
$1,600.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
6.300
|
$1,700.000
|
$2,500.000
|
$1,250.000
|
$2,500.000
|
$1,900.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
5,520.000
|
$28.000
|
$24.000
|
$34.000
|
$31.000
|
$35.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
105.000
|
$890.000
|
$610.000
|
$755.000
|
$680.000
|
$1,000.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
714.000
|
$240.000
|
$226.400
|
$225.000
|
$232.000
|
$290.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
42.000
|
$900.000
|
$550.000
|
$800.000
|
$655.000
|
$700.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
5.200
|
$740.000
|
$865.000
|
$1,000.000
|
$980.000
|
$900.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
975.000
|
$210.000
|
$148.500
|
$200.000
|
$198.000
|
$200.000
|
|
|
BEDDING MATERIAL (6 IN)
|
CY
|
157.000
|
$175.000
|
$148.000
|
$185.000
|
$215.000
|
$200.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
43.000
|
$630.000
|
$768.000
|
$675.000
|
$700.000
|
$650.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOT) (HPC)
|
LF
|
288.000
|
$150.000
|
$165.000
|
$110.000
|
$142.000
|
$160.000
|
|
|
ARMOR JOINT
|
LF
|
88.000
|
$170.000
|
$200.000
|
$100.000
|
$110.000
|
$200.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
90.000
|
$240.000
|
$200.000
|
$240.000
|
$260.000
|
$200.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$70,000.000
|
$20,000.000
|
$50,000.000
|
$52,000.000
|
$175,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$190,000.000
|
$160,000.000
|
$300,000.000
|
$195,000.000
|
$190,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$8,500.000
|
$1,642.000
|
$22,000.000
|
$1,800.000
|
$16,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
350.000
|
$40.000
|
$35.000
|
$38.000
|
$40.000
|
$1.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
20.000
|
$75.000
|
$50.000
|
$55.000
|
$71.500
|
$1.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
370.000
|
$20.000
|
$3.000
|
$14.000
|
$13.200
|
$1.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
160.000
|
$35.000
|
$15.000
|
$32.000
|
$38.500
|
$1.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
160.000
|
$12.000
|
$10.000
|
$14.000
|
$11.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,701.000
|
$4.500
|
$3.500
|
$3.350
|
$3.600
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,701.000
|
$1.500
|
$1.000
|
$0.900
|
$0.300
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
290.000
|
$12.000
|
$10.000
|
$9.000
|
$8.800
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
290.000
|
$3.000
|
$1.000
|
$4.250
|
$3.300
|
$1.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
227.000
|
$100.000
|
$132.200
|
$90.000
|
$120.000
|
$100.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
537.500
|
$35.000
|
$24.940
|
$26.000
|
$28.000
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,500.000
|
$1,653.750
|
$1,735.000
|
$2,200.000
|
$1,600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
425.000
|
$4.500
|
$10.000
|
$2.200
|
$3.300
|
$2.000
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
4.000
|
$1,000.000
|
$157.500
|
$165.000
|
$275.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,350.000
|
$2,913.750
|
$3,100.000
|
$3,520.000
|
$2,800.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$325.000
|
$210.000
|
$220.000
|
$291.500
|
$500.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
1.000
|
$700.000
|
$1,500.000
|
$800.000
|
$790.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
3.000
|
$600.000
|
$1,500.000
|
$860.000
|
$855.000
|
$1,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
3.000
|
$160.000
|
$250.000
|
$115.000
|
$112.000
|
$150.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$30.000
|
$42.000
|
$50.000
|
$26.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
19.000
|
$35.000
|
$21.000
|
$30.000
|
$37.000
|
$20.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
80.000
|
$1.000
|
$5.000
|
$4.000
|
$4.400
|
$5.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
55.000
|
$1.000
|
$5.000
|
$4.000
|
$4.400
|
$5.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
587.000
|
$1.000
|
$2.100
|
$2.200
|
$2.200
|
$2.500
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
22.000
|
$10.000
|
$26.250
|
$27.500
|
$27.500
|
$30.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
21.000
|
$8.000
|
$15.750
|
$16.500
|
$16.500
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
587.000
|
$0.250
|
$2.100
|
$2.200
|
$2.200
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
4.000
|
$1.500
|
$10.500
|
$11.000
|
$11.000
|
$5.000
|
|
|
NO. OF WORKING DAYS
|
$/D
|
13,321.000
|
$25.000
|
$135.000
|
$135.000
|
$160.000
|
$160.000
|
|
|
SP MIXES SP-C PG76-22
|
TON
|
688.000
|
$160.000
|
$132.200
|
$200.000
|
$255.000
|
$250.000
|
|
|
TACK COAT
|
GAL
|
469.000
|
$6.000
|
$5.000
|
$5.000
|
$4.400
|
$10.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$10,000.000
|
$15,000.000
|
$19,000.000
|
$10,000.000
|
|
|
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
|
LF
|
1,594.000
|
$1.100
|
$4.890
|
$4.400
|
$4.400
|
$5.000
|
|
|
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
|
LF
|
850.000
|
$1.100
|
$4.890
|
$4.400
|
$4.400
|
$5.000
|
|
|
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
|
LF
|
220.000
|
$1.800
|
$4.890
|
$4.400
|
$4.400
|
$5.000
|
|
|
TMA (STATIONARY)
|
DAY
|
5.000
|
$260.000
|
$500.000
|
$400.000
|
$350.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
60.000
|
$90.000
|
$30.000
|
$25.000
|
$32.000
|
$150.000
|
|
Totals: |
$2,423,930.650
|
$3,496,300.520
|
$4,041,776.420
|
$4,227,883.010
|
$4,434,595.000
|