REMOVING CONC (RIPRAP)
|
SY
|
773.000
|
$20.000
|
$25.000
|
$18.000
|
$16.000
|
$7.000
|
$22.000
|
|
|
REMOVING CONC (APPR SLAB)
|
SY
|
115.000
|
$40.000
|
$55.000
|
$30.000
|
$47.000
|
$150.000
|
$60.000
|
|
|
REMOVING STAB BASE & ASPH PAV (7"-12")
|
SY
|
2,298.000
|
$5.000
|
$15.000
|
$10.000
|
$6.250
|
$15.000
|
$9.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,721.000
|
$12.000
|
$10.000
|
$14.000
|
$10.250
|
$10.000
|
$18.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
4,422.000
|
$25.000
|
$15.000
|
$18.000
|
$11.000
|
$15.000
|
$18.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
16,352.000
|
$2.000
|
$3.000
|
$2.000
|
$3.500
|
$2.000
|
$3.750
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
16,352.000
|
$0.750
|
$1.250
|
$0.650
|
$0.650
|
$0.700
|
$0.700
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
8,176.000
|
$0.750
|
$1.120
|
$0.660
|
$0.650
|
$0.250
|
$0.700
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
8,176.000
|
$0.750
|
$0.120
|
$0.630
|
$0.630
|
$0.250
|
$0.700
|
|
|
VEGETATIVE WATERING
|
MG
|
524.000
|
$10.000
|
$50.000
|
$5.000
|
$12.500
|
$1.000
|
$10.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
1,074.000
|
$1.750
|
$1.250
|
$1.800
|
$1.800
|
$2.000
|
$2.000
|
|
|
FL BS(CMP IN PLC)(TY D GR 5)(FNAL POS)
|
CY
|
1,219.000
|
$50.000
|
$45.000
|
$115.000
|
$120.000
|
$60.000
|
$140.000
|
|
|
CEMENT
|
TON
|
60.000
|
$175.000
|
$180.000
|
$225.000
|
$250.000
|
$200.000
|
$300.000
|
|
|
CEMENT TREAT (NEW BASE)(10")(DC)
|
SY
|
3,510.000
|
$5.000
|
$5.000
|
$4.000
|
$3.500
|
$6.000
|
$10.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,097.000
|
$6.000
|
$5.500
|
$5.000
|
$6.500
|
$8.000
|
$10.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
6,159.000
|
$6.000
|
$7.000
|
$5.000
|
$5.350
|
$8.000
|
$12.000
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
155.000
|
$110.000
|
$350.000
|
$175.000
|
$220.000
|
$400.000
|
$325.000
|
|
|
CEM STABIL BKFL
|
CY
|
178.000
|
$180.000
|
$250.000
|
$250.000
|
$220.000
|
$190.000
|
$310.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,388.000
|
$50.000
|
$55.000
|
$60.000
|
$45.000
|
$60.000
|
$75.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
500.000
|
$275.000
|
$211.000
|
$265.000
|
$300.000
|
$240.000
|
$315.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
1,680.000
|
$425.000
|
$255.000
|
$700.000
|
$750.000
|
$795.000
|
$780.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
54.600
|
$1,110.000
|
$1,200.000
|
$1,200.000
|
$1,050.000
|
$1,500.000
|
$1,300.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
124.800
|
$1,200.000
|
$1,700.000
|
$1,250.000
|
$1,100.000
|
$1,500.000
|
$1,600.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
35.400
|
$1,200.000
|
$1,500.000
|
$1,200.000
|
$1,300.000
|
$1,500.000
|
$2,375.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
19,320.000
|
$25.000
|
$26.000
|
$23.000
|
$22.500
|
$26.000
|
$27.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
105.200
|
$590.000
|
$550.000
|
$650.000
|
$850.000
|
$800.000
|
$800.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
2,499.000
|
$185.000
|
$216.000
|
$215.000
|
$200.000
|
$205.000
|
$210.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
6.000
|
$550.000
|
$1,000.000
|
$650.000
|
$650.000
|
$600.000
|
$865.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
2,221.000
|
$145.000
|
$150.000
|
$165.000
|
$210.000
|
$125.000
|
$190.000
|
|
|
BEDDING MATERIAL (6 IN)
|
CY
|
430.000
|
$100.000
|
$180.000
|
$170.000
|
$160.000
|
$120.000
|
$190.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
41.000
|
$450.000
|
$550.000
|
$600.000
|
$535.000
|
$550.000
|
$635.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
888.000
|
$85.000
|
$120.000
|
$100.000
|
$75.000
|
$140.000
|
$130.000
|
|
|
ARMOR JOINT
|
LF
|
88.000
|
$80.000
|
$180.000
|
$115.000
|
$130.000
|
$125.000
|
$100.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
138.000
|
$125.000
|
$65.000
|
$200.000
|
$210.000
|
$180.000
|
$205.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$60,000.000
|
$170,000.000
|
$130,000.000
|
$115,000.000
|
$150,000.000
|
$165,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$385,000.000
|
$400,000.000
|
$480,000.000
|
$450,000.000
|
$470,000.000
|
$325,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$4,600.000
|
$2,000.000
|
$2,500.000
|
$3,000.000
|
$2,000.000
|
$3,200.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
270.000
|
$30.000
|
$28.000
|
$34.000
|
$34.000
|
$1.000
|
$33.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
225.000
|
$55.000
|
$60.000
|
$50.000
|
$49.500
|
$1.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
495.000
|
$10.000
|
$10.000
|
$9.000
|
$9.000
|
$1.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
320.000
|
$25.000
|
$27.000
|
$29.000
|
$29.000
|
$1.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
320.000
|
$10.000
|
$10.000
|
$9.000
|
$9.000
|
$1.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,257.000
|
$2.850
|
$3.000
|
$3.250
|
$3.500
|
$1.000
|
$3.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,257.000
|
$1.150
|
$1.000
|
$0.750
|
$0.800
|
$1.000
|
$0.750
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
570.000
|
$6.000
|
$5.000
|
$7.000
|
$6.600
|
$8.000
|
$6.600
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
570.000
|
$1.500
|
$1.000
|
$1.100
|
$1.100
|
$1.000
|
$1.100
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
18.000
|
$4,500.000
|
$7,500.000
|
$3,000.000
|
$6,000.000
|
$2,000.000
|
$6,000.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
2,640.000
|
$35.000
|
$83.000
|
$100.000
|
$70.000
|
$80.000
|
$100.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
2,640.000
|
$10.000
|
$25.000
|
$13.000
|
$17.000
|
$25.000
|
$16.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
148.000
|
$45.000
|
$75.000
|
$60.000
|
$70.000
|
$20.000
|
$80.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
500.000
|
$25.000
|
$35.000
|
$29.000
|
$29.000
|
$28.000
|
$28.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,850.000
|
$3,100.000
|
$2,000.000
|
$1,950.000
|
$2,000.000
|
$2,200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
550.000
|
$2.000
|
$5.000
|
$2.200
|
$3.000
|
$2.000
|
$3.300
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
4.000
|
$175.000
|
$2,750.000
|
$110.000
|
$110.000
|
$200.000
|
$275.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,500.000
|
$2,800.000
|
$3,400.000
|
$3,380.000
|
$3,200.000
|
$3,300.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$270.000
|
$250.000
|
$220.000
|
$220.000
|
$500.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$900.000
|
$2,000.000
|
$880.000
|
$880.000
|
$800.000
|
$265.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$12,000.000
|
$9,500.000
|
$9,600.000
|
$9,500.000
|
$9,000.000
|
$9,500.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
2.000
|
$400.000
|
$900.000
|
$1,200.000
|
$750.000
|
$850.000
|
$1,250.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$90.000
|
$100.000
|
$100.000
|
$300.000
|
$200.000
|
$125.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
8.000
|
$25.000
|
$35.000
|
$30.000
|
$22.000
|
$30.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
16.000
|
$30.000
|
$35.000
|
$30.000
|
$22.000
|
$30.000
|
$22.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
6,065.000
|
$0.400
|
$1.000
|
$0.550
|
$0.550
|
$0.500
|
$0.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
24.000
|
$5.000
|
$10.000
|
$8.800
|
$8.800
|
$10.000
|
$10.000
|
|
|
WK ZN PV MK NON-REM (Y)(4")SLD W/MRKR
|
LF
|
8,960.000
|
$2.000
|
$1.000
|
$1.100
|
$1.100
|
$1.000
|
$1.200
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,920.000
|
$0.500
|
$1.000
|
$0.550
|
$0.550
|
$0.500
|
$0.650
|
|
PREFAB PAV MRK TY B (W)(4")(SLD)
|
LF
|
960.000
|
$5.000
|
$7.000
|
$8.000
|
$8.250
|
$8.000
|
$8.500
|
|
PREFAB PAV MRK TY B (Y)(4")(SLD)
|
LF
|
960.000
|
$5.000
|
$7.000
|
$8.000
|
$8.250
|
$8.000
|
$8.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
230.000
|
$3.500
|
$10.000
|
$4.500
|
$4.400
|
$5.000
|
$5.250
|
|
TRAFFIC BUTTON TY II-A-A
|
EA
|
34.000
|
$5.000
|
$15.000
|
$4.500
|
$4.400
|
$5.000
|
$5.250
|
|
TRAFFIC BUTTON TY Y
|
EA
|
102.000
|
$4.000
|
$8.000
|
$4.500
|
$4.400
|
$5.000
|
$4.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
16,037.000
|
$0.600
|
$1.000
|
$0.550
|
$0.550
|
$0.600
|
$0.550
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
24.000
|
$5.000
|
$10.000
|
$3.300
|
$3.300
|
$5.000
|
$3.500
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,920.000
|
$0.500
|
$1.000
|
$0.280
|
$0.280
|
$0.300
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
22.000
|
$0.500
|
$5.000
|
$1.100
|
$1.100
|
$1.000
|
$1.200
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
786.000
|
$120.000
|
$180.000
|
$170.000
|
$165.000
|
$150.000
|
$250.000
|
|
|
TACK COAT
|
GAL
|
583.000
|
$6.000
|
$3.000
|
$4.500
|
$6.000
|
$8.000
|
$8.000
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
4.000
|
$6,000.000
|
$500.000
|
$8,500.000
|
$4,500.000
|
$7,500.000
|
$7,500.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$350.000
|
$300.000
|
$500.000
|
$375.000
|
$500.000
|
$2,500.000
|
|
|
INSTALL FTB
|
LF
|
225.000
|
$40.000
|
$55.000
|
$50.000
|
$30.000
|
$25.000
|
$55.000
|
|
|
REMOVE FTB
|
LF
|
225.000
|
$10.000
|
$55.000
|
$15.000
|
$8.000
|
$5.000
|
$12.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$15,000.000
|
$16,000.000
|
$19,000.000
|
$20,000.000
|
$18,000.000
|
|
|
REFL PAV MRK AWT (W) 4" (SLD) (100MIL)
|
LF
|
12,560.000
|
$0.500
|
$1.200
|
$0.700
|
$0.720
|
$0.750
|
$0.800
|
|
|
REFL PAV MRK AWT (Y) 4" (SLD) (100MIL)
|
LF
|
7,070.000
|
$0.500
|
$1.200
|
$0.550
|
$0.550
|
$0.500
|
$0.550
|
|
|
REFL PAV MRK AWT (Y) 4" (BRK) (100MIL)
|
LF
|
780.000
|
$0.500
|
$2.000
|
$0.550
|
$0.550
|
$0.500
|
$0.550
|
|
|
TMA (STATIONARY)
|
DAY
|
15.000
|
$160.000
|
$1,000.000
|
$300.000
|
$250.000
|
$200.000
|
$150.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
60.000
|
$60.000
|
$50.000
|
$30.000
|
$55.000
|
$30.000
|
$75.000
|
|
Totals: |
$4,206,746.700
|
$4,618,853.240
|
$5,247,412.340
|
$5,275,492.180
|
$5,283,975.100
|
$5,910,170.050
|