|
|
PREPARING ROW
|
STA
|
17.700
|
$3,000.000
|
$300.000
|
$3,000.000
|
$2,277.680
|
$1,000.000
|
$6,000.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (21")
|
SY
|
559.000
|
$14.000
|
$27.000
|
$15.000
|
$27.900
|
$32.000
|
$27.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,105.000
|
$12.000
|
$19.000
|
$17.000
|
$31.140
|
$28.000
|
$43.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
1,830.000
|
$15.000
|
$17.500
|
$19.000
|
$31.140
|
$12.000
|
$25.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
11,401.000
|
$2.000
|
$5.300
|
$1.250
|
$2.250
|
$3.000
|
$6.900
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
11,401.000
|
$0.250
|
$0.330
|
$0.270
|
$0.290
|
$0.300
|
$0.290
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
11,401.000
|
$0.250
|
$0.330
|
$0.270
|
$0.230
|
$0.300
|
$0.290
|
|
|
VEGETATIVE WATERING
|
MG
|
15.000
|
$20.000
|
$195.000
|
$1.000
|
$75.240
|
$35.000
|
$104.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
11,401.000
|
$1.300
|
$1.400
|
$1.150
|
$1.070
|
$1.300
|
$1.250
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
1,422.400
|
$65.000
|
$85.000
|
$65.000
|
$58.980
|
$92.000
|
$141.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
741.200
|
$5.000
|
$6.600
|
$3.250
|
$7.740
|
$3.700
|
$3.450
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
841.300
|
$80.000
|
$96.000
|
$72.000
|
$55.320
|
$87.000
|
$82.600
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
22.000
|
$450.000
|
$480.000
|
$500.000
|
$453.430
|
$495.000
|
$619.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
13.000
|
$550.000
|
$510.000
|
$550.000
|
$481.760
|
$526.000
|
$672.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$76,000.000
|
$56,400.000
|
$105,000.000
|
$125,339.520
|
$110,000.000
|
$150,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$2,000.000
|
$1,000.000
|
$13,000.000
|
$2,385.630
|
$1,000.000
|
$25,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
240.000
|
$35.000
|
$42.000
|
$35.000
|
$43.050
|
$40.000
|
$37.400
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
240.000
|
$15.000
|
$32.000
|
$27.000
|
$9.060
|
$30.000
|
$28.800
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
300.000
|
$3.500
|
$4.800
|
$4.000
|
$5.100
|
$4.500
|
$4.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
300.000
|
$1.000
|
$1.200
|
$1.000
|
$1.130
|
$1.100
|
$1.050
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
100.000
|
$10.000
|
$4.800
|
$4.000
|
$6.800
|
$4.500
|
$4.250
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
100.000
|
$1.000
|
$1.200
|
$1.000
|
$2.270
|
$1.100
|
$1.050
|
|
|
DRIVEWAYS (ACP)
|
SY
|
124.000
|
$80.000
|
$88.000
|
$100.000
|
$64.800
|
$125.000
|
$137.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
105.000
|
$18.000
|
$44.000
|
$37.000
|
$41.940
|
$46.000
|
$25.600
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
370.000
|
$25.000
|
$46.000
|
$38.000
|
$43.080
|
$47.000
|
$35.200
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
480.000
|
$45.000
|
$66.000
|
$55.000
|
$62.350
|
$68.000
|
$74.200
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
955.000
|
$1.500
|
$2.400
|
$2.000
|
$2.270
|
$2.500
|
$2.450
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
740.000
|
$2.000
|
$2.400
|
$2.000
|
$2.270
|
$2.500
|
$2.450
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
5.000
|
$10.000
|
$4.800
|
$4.000
|
$4.530
|
$5.000
|
$3.650
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
4.000
|
$2,490.000
|
$2,280.000
|
$2,200.000
|
$2,153.770
|
$2,350.000
|
$2,030.000
|
|
|
ELC SRV TY D 120/240 070(NS)AL(E)SP(O)
|
EA
|
1.000
|
$6,000.000
|
$6,000.000
|
$7,500.000
|
$5,667.820
|
$6,200.000
|
$9,820.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$750.000
|
$1,148.000
|
$1,000.000
|
$927.000
|
$1,100.000
|
$1,020.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$700.000
|
$840.000
|
$725.000
|
$515.000
|
$790.000
|
$747.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
620.000
|
$1.150
|
$3.300
|
$1.060
|
$2.850
|
$3.100
|
$2.950
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
30.000
|
$8.500
|
$12.000
|
$12.650
|
$10.300
|
$11.200
|
$10.700
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
2.000
|
$160.000
|
$300.000
|
$176.000
|
$257.500
|
$281.000
|
$267.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$170.000
|
$312.000
|
$250.000
|
$267.800
|
$292.000
|
$278.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
9,720.000
|
$0.250
|
$0.310
|
$0.250
|
$0.270
|
$0.300
|
$0.280
|
|
|
PAVEMENT SEALER 8"
|
LF
|
620.000
|
$0.300
|
$0.630
|
$0.430
|
$0.540
|
$0.600
|
$0.560
|
|
|
PAVEMENT SEALER 24"
|
LF
|
30.000
|
$3.750
|
$3.600
|
$4.730
|
$3.090
|
$3.400
|
$3.200
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
2.000
|
$60.000
|
$90.000
|
$52.000
|
$77.250
|
$85.000
|
$80.100
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
2.000
|
$60.000
|
$96.000
|
$77.000
|
$82.400
|
$90.000
|
$85.400
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
4,070.000
|
$0.500
|
$1.000
|
$0.610
|
$0.820
|
$0.900
|
$0.850
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
5,650.000
|
$0.500
|
$1.000
|
$0.770
|
$0.820
|
$0.900
|
$0.850
|
|
REFL PAV MRKR TY I-C
|
EA
|
32.000
|
$5.500
|
$7.200
|
$7.000
|
$6.180
|
$6.750
|
$6.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
298.000
|
$5.000
|
$6.300
|
$7.000
|
$5.410
|
$5.900
|
$5.600
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
7,060.000
|
$0.500
|
$0.700
|
$0.430
|
$0.620
|
$0.700
|
$0.640
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
30.000
|
$10.000
|
$7.200
|
$7.000
|
$6.180
|
$6.750
|
$6.400
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
800.000
|
$0.250
|
$0.120
|
$2.000
|
$0.100
|
$0.100
|
$0.110
|
|
|
INSTALL HWY TRF SIG (FLASH BEACON)
|
EA
|
1.000
|
$6,500.000
|
$2,400.000
|
$10,000.000
|
$2,267.130
|
$2,500.000
|
$4,590.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
10.000
|
$330.000
|
$360.000
|
$300.000
|
$340.070
|
$372.000
|
$416.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
4.000
|
$330.000
|
$360.000
|
$300.000
|
$340.070
|
$372.000
|
$416.000
|
|
|
BACK PLATE (12")(1 SEC)
|
EA
|
14.000
|
$75.000
|
$100.000
|
$83.000
|
$94.090
|
$103.000
|
$117.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
935.000
|
$2.500
|
$3.600
|
$3.000
|
$3.400
|
$3.700
|
$2.800
|
|
|
INS TRF SIG PL AM (S)1 ARM(24')
|
EA
|
1.000
|
$7,300.000
|
$11,400.000
|
$16,000.000
|
$10,768.850
|
$11,700.000
|
$8,170.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(28')LUM
|
EA
|
1.000
|
$11,250.000
|
$14,400.000
|
$20,000.000
|
$13,602.760
|
$14,800.000
|
$11,700.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
1.000
|
$12,500.000
|
$15,600.000
|
$23,000.000
|
$14,736.330
|
$16,100.000
|
$14,400.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$7,000.000
|
$2,000.000
|
$600.000
|
$4,120.000
|
$1,100.000
|
$1,680.000
|
|
|
LITTER REMOVAL
|
CYC
|
3.000
|
$4,000.000
|
$1,000.000
|
$300.000
|
$2,357.340
|
$2,100.000
|
$2,920.000
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
0.350
|
$1,450.000
|
$3,900.000
|
$350.000
|
$5,400.000
|
$2,000.000
|
$10,275.770
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
0.350
|
$25,000.000
|
$6,000.000
|
$80,000.000
|
$10,800.000
|
$59,000.000
|
$101,126.970
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
815.300
|
$115.000
|
$121.600
|
$112.000
|
$134.550
|
$145.000
|
$117.000
|
|
|
D-GR HMA TY-D PG76-22 (LEVEL-UP)
|
TON
|
310.000
|
$140.000
|
$179.750
|
$144.000
|
$145.350
|
$171.000
|
$152.000
|
|
|
D-GR HMA TY-D PG 76-22 (EXEMPT)
|
TON
|
407.700
|
$120.000
|
$167.000
|
$144.000
|
$145.350
|
$168.000
|
$152.000
|
|
|
TOM-C PG76-22 SAC-B
|
TON
|
462.700
|
$150.000
|
$225.000
|
$210.000
|
$177.750
|
$240.000
|
$219.000
|
|
|
BONDING COURSE
|
GAL
|
667.300
|
$5.000
|
$5.500
|
$4.250
|
$4.670
|
$4.800
|
$4.550
|
|
|
UNDERSEAL COURSE
|
GAL
|
1,682.600
|
$5.000
|
$5.500
|
$4.000
|
$7.740
|
$4.500
|
$4.250
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
180.000
|
$75.000
|
$110.000
|
$120.000
|
$119.140
|
$100.000
|
$209.000
|
|
|
TMA (STATIONARY)
|
DAY
|
90.000
|
$220.000
|
$120.000
|
$175.000
|
$222.710
|
$135.000
|
$267.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
80.000
|
$100.000
|
$220.000
|
$55.000
|
$75.350
|
$85.000
|
$645.000
|
|
|
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
|
EA
|
10.000
|
$2,250.000
|
$600.000
|
$300.000
|
$4,000.000
|
$1,300.000
|
$640.000
|
|
Totals: |
$947,263.800
|
$1,073,849.510
|
$1,094,331.965
|
$1,133,929.262
|
$1,172,299.780
|
$1,640,861.474
|