|
|
PREPARING ROW
|
STA
|
53.100
|
$3,500.000
|
$4,350.000
|
$3,600.000
|
$6,180.000
|
$1,500.000
|
$550.000
|
$12,106.130
|
$11,000.000
|
|
|
RMV (0"-4") TRT/UNTRT BASE & ASPH PAV
|
SY
|
846.000
|
$10.000
|
$5.700
|
$5.250
|
$7.000
|
$21.000
|
$12.500
|
$5.800
|
$12.000
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
846.000
|
$35.000
|
$7.500
|
$8.500
|
$7.000
|
$21.000
|
$14.500
|
$10.720
|
$12.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
12,593.000
|
$29.000
|
$8.200
|
$27.000
|
$28.000
|
$13.000
|
$18.400
|
$16.460
|
$35.000
|
|
|
EMBANK (FNL)(OC)(TY B)
|
CY
|
9,872.000
|
$23.000
|
$41.100
|
$16.150
|
$28.000
|
$15.000
|
$24.200
|
$48.000
|
$30.000
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
31,784.000
|
$4.000
|
$3.200
|
$3.750
|
$2.070
|
$2.700
|
$6.500
|
$5.150
|
$3.250
|
|
|
BROADCAST SEED (PERM_RURAL_CLAY)
|
SY
|
31,784.000
|
$1.250
|
$0.300
|
$0.240
|
$0.290
|
$0.400
|
$0.280
|
$0.270
|
$0.230
|
|
|
BROADCAST SEED (TEMP_WARM_COOL)
|
SY
|
31,784.000
|
$0.300
|
$0.300
|
$0.200
|
$0.190
|
$0.250
|
$0.280
|
$0.270
|
$0.230
|
|
|
VEGETATIVE WATERING
|
TGL
|
1,271.000
|
$35.000
|
$39.100
|
$20.000
|
$24.500
|
$35.000
|
$66.000
|
$1.190
|
$18.500
|
|
|
SOIL RET BLKT(SL_MOD_CLAY_SHORT)
|
SY
|
31,784.000
|
$3.000
|
$2.500
|
$1.500
|
$2.250
|
$2.800
|
$1.380
|
$1.370
|
$1.150
|
|
|
WILDFLOWER SEEDING
|
AC
|
6.570
|
$2,000.000
|
$3,581.200
|
$2,500.000
|
$3,369.000
|
$4,200.000
|
$2,820.000
|
$2,805.190
|
$2,360.000
|
|
|
RDSIDE AMNITY(CATTLE GRD)
|
EA
|
1.000
|
$2,000.000
|
$9,232.600
|
$10,000.000
|
$5,000.000
|
$30,000.000
|
$32,000.000
|
$62.510
|
$40,000.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
4,845.000
|
$85.000
|
$83.100
|
$74.900
|
$62.160
|
$95.000
|
$90.000
|
$19.210
|
$115.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
3,489.000
|
$6.000
|
$4.500
|
$4.900
|
$4.880
|
$5.000
|
$4.000
|
$5.360
|
$4.000
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
3,738.000
|
$110.000
|
$78.000
|
$100.000
|
$121.700
|
$133.000
|
$115.000
|
$121.450
|
$115.000
|
|
|
D-GR HMA TY-D PG76-22 (LEVEL-UP)
|
TON
|
1,000.000
|
$113.000
|
$88.000
|
$153.000
|
$131.600
|
$170.000
|
$148.000
|
$166.690
|
$145.000
|
|
|
D-GR HMA TY-D PG 76-22 (EXEMPT)
|
TON
|
1,472.000
|
$126.000
|
$111.000
|
$135.000
|
$131.600
|
$163.000
|
$142.000
|
$166.690
|
$135.000
|
|
|
PFC-C PG76-22 SAC-A
|
TON
|
1,917.000
|
$220.000
|
$129.500
|
$215.000
|
$186.600
|
$220.000
|
$225.000
|
$267.900
|
$215.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
3,022.000
|
$57.000
|
$38.600
|
$54.000
|
$65.520
|
$67.000
|
$58.000
|
$75.090
|
$55.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
101.000
|
$10.000
|
$10.700
|
$35.000
|
$88.000
|
$95.000
|
$82.000
|
$4.460
|
$100.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
55.000
|
$150.000
|
$389.500
|
$235.000
|
$66.950
|
$840.000
|
$161.000
|
$151.810
|
$800.000
|
|
|
CEM STABIL BKFL
|
CY
|
6.000
|
$197.000
|
$260.200
|
$329.000
|
$373.320
|
$810.000
|
$616.000
|
$200.920
|
$400.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
22.000
|
$400.000
|
$169.000
|
$399.000
|
$452.750
|
$520.000
|
$180.000
|
$294.690
|
$500.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
205.000
|
$20.000
|
$46.700
|
$37.000
|
$41.950
|
$49.000
|
$20.000
|
$4.760
|
$4.500
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,296.000
|
$40.000
|
$32.200
|
$34.000
|
$38.520
|
$19.000
|
$150.000
|
$54.920
|
$60.000
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
1,600.000
|
$45.000
|
$37.400
|
$71.000
|
$23.000
|
$63.000
|
$140.000
|
$25.900
|
$80.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
488.000
|
$700.000
|
$608.000
|
$600.000
|
$680.830
|
$865.000
|
$730.000
|
$304.250
|
$675.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
61.000
|
$730.000
|
$861.100
|
$625.000
|
$737.560
|
$1,176.000
|
$695.000
|
$1,029.920
|
$900.000
|
|
|
RIRRAP (STONE COMMON)(DRY)(15 IN)
|
CY
|
100.000
|
$315.000
|
$161.800
|
$185.000
|
$195.250
|
$220.000
|
$230.000
|
$226.230
|
$250.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
136.000
|
$906.000
|
$1,400.300
|
$1,836.000
|
$2,082.540
|
$1,400.000
|
$1,760.000
|
$1,561.340
|
$1,650.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
166.000
|
$157.000
|
$110.600
|
$220.000
|
$249.640
|
$208.000
|
$229.000
|
$90.540
|
$150.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
354.000
|
$159.000
|
$128.400
|
$366.000
|
$415.300
|
$215.000
|
$272.000
|
$118.260
|
$225.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
1.000
|
$10,279.000
|
$7,481.400
|
$25,000.000
|
$28,367.820
|
$19,000.000
|
$8,900.000
|
$5,405.110
|
$15,000.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$10,167.000
|
$14,441.800
|
$7,990.000
|
$9,066.360
|
$10,300.000
|
$7,800.000
|
$8,840.640
|
$15,000.000
|
|
|
WINGWALL (FW - S) (HW=6 FT)
|
EA
|
1.000
|
$17,000.000
|
$33,710.700
|
$15,400.000
|
$17,474.580
|
$24,000.000
|
$36,920.000
|
$20,538.860
|
$25,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$31,000.000
|
$42,947.800
|
$30,900.000
|
$35,062.630
|
$53,000.000
|
$45,400.000
|
$27,054.140
|
$40,000.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
1.000
|
$30,948.000
|
$60,310.600
|
$58,860.000
|
$66,789.190
|
$89,000.000
|
$71,820.000
|
$38,893.450
|
$55,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 6 FT)(3:1)(C)
|
EA
|
1.000
|
$46,345.000
|
$22,365.900
|
$24,900.000
|
$28,254.350
|
$28,000.000
|
$35,840.000
|
$18,306.370
|
$30,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,710.000
|
$1,896.700
|
$2,100.000
|
$2,381.760
|
$2,400.000
|
$7,800.000
|
$1,109.870
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$2,145.000
|
$2,086.000
|
$3,250.000
|
$3,687.820
|
$3,500.000
|
$8,400.000
|
$1,494.870
|
$2,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$4,600.000
|
$3,461.600
|
$4,250.000
|
$4,822.530
|
$5,500.000
|
$9,000.000
|
$3,187.450
|
$4,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$555,054.790
|
$450,000.000
|
$539,000.000
|
$519,290.920
|
$400,000.000
|
$137,700.000
|
$642,835.550
|
$725,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$6,907.000
|
$5,047.200
|
$6,000.000
|
$11,013.870
|
$1,800.000
|
$1,900.000
|
$22,324.840
|
$35,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
50.000
|
$250.000
|
$911.000
|
$250.000
|
$129.410
|
$70.000
|
$275.000
|
$103.590
|
$200.000
|
|
|
TMA (STATIONARY)
|
DAY
|
495.000
|
$200.000
|
$34.700
|
$25.000
|
$67.300
|
$250.000
|
$450.000
|
$297.660
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
130.000
|
$373.000
|
$153.600
|
$25.000
|
$108.710
|
$680.000
|
$900.000
|
$178.600
|
$5.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
362.000
|
$50.000
|
$41.100
|
$39.000
|
$38.650
|
$48.000
|
$66.000
|
$65.300
|
$55.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
362.000
|
$19.000
|
$8.700
|
$8.250
|
$8.250
|
$10.000
|
$39.000
|
$17.860
|
$33.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
586.000
|
$40.000
|
$19.800
|
$18.750
|
$18.750
|
$23.000
|
$40.000
|
$39.490
|
$33.250
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
586.000
|
$5.500
|
$7.200
|
$6.820
|
$6.820
|
$9.000
|
$36.000
|
$9.380
|
$30.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
11,654.000
|
$5.000
|
$3.700
|
$3.500
|
$3.500
|
$4.000
|
$5.300
|
$4.020
|
$3.550
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
11,654.000
|
$1.000
|
$0.300
|
$0.250
|
$0.250
|
$0.300
|
$0.600
|
$1.030
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
100.000
|
$20.000
|
$7.000
|
$6.500
|
$6.500
|
$8.000
|
$11.700
|
$5.580
|
$9.750
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
100.000
|
$5.000
|
$1.200
|
$1.000
|
$1.000
|
$1.300
|
$0.900
|
$1.590
|
$0.750
|
|
|
CONSTRUCTING DETOURS (TY1)
|
SY
|
2,156.000
|
$115.000
|
$82.100
|
$83.000
|
$101.200
|
$88.000
|
$85.000
|
$76.210
|
$100.000
|
|
|
PTB (FUR&INST)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
1,680.000
|
$102.000
|
$13.700
|
$37.000
|
$75.000
|
$23.000
|
$40.000
|
$67.260
|
$40.000
|
|
|
PTB (MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
870.000
|
$10.000
|
$4.000
|
$13.000
|
$24.000
|
$15.000
|
$15.000
|
$53.580
|
$10.000
|
|
|
PTB (REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
1,680.000
|
$26.000
|
$13.200
|
$23.000
|
$21.000
|
$22.000
|
$20.000
|
$17.860
|
$15.000
|
|
|
PORT CTB (FURN & INST)(TL-3 LPCB)
|
LF
|
240.000
|
$200.000
|
$13.700
|
$200.000
|
$180.000
|
$240.000
|
$40.000
|
$202.410
|
$200.000
|
|
|
PORT CTB (REMOVE) (TL-3 LPCB)
|
LF
|
240.000
|
$50.000
|
$10.900
|
$23.000
|
$22.000
|
$35.000
|
$20.000
|
$24.560
|
$15.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,217.000
|
$75.000
|
$72.500
|
$88.000
|
$50.600
|
$117.000
|
$100.000
|
$104.020
|
$100.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
825.000
|
$30.000
|
$26.700
|
$25.250
|
$26.860
|
$39.000
|
$34.000
|
$29.770
|
$35.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
50.000
|
$36.000
|
$92.300
|
$87.000
|
$92.380
|
$53.000
|
$46.600
|
$102.400
|
$45.000
|
|
|
MTL BEAM GD FEN TRANS (T101)
|
EA
|
1.000
|
$1,070.000
|
$1,722.100
|
$1,620.000
|
$1,723.170
|
$442.000
|
$390.000
|
$387.320
|
$350.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$1,733.000
|
$1,339.500
|
$1,260.000
|
$1,340.250
|
$1,900.000
|
$1,700.000
|
$1,359.730
|
$1,800.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,636.000
|
$6.000
|
$2.200
|
$2.000
|
$2.130
|
$3.000
|
$3.000
|
$3.130
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
12.000
|
$470.000
|
$212.700
|
$200.000
|
$212.740
|
$170.000
|
$150.000
|
$208.960
|
$150.000
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
1.000
|
$250.000
|
$249.600
|
$235.000
|
$249.970
|
$225.000
|
$198.000
|
$227.110
|
$165.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
7.000
|
$3,622.000
|
$3,040.200
|
$2,860.000
|
$3,042.150
|
$4,800.000
|
$4,200.000
|
$2,948.670
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$1,407.000
|
$1,016.900
|
$1,000.000
|
$1,473.210
|
$2,100.000
|
$1,800.000
|
$1,513.620
|
$750.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
14.000
|
$810.000
|
$567.700
|
$505.000
|
$781.810
|
$815.000
|
$720.000
|
$892.990
|
$750.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
14.000
|
$10,500.000
|
$7,398.800
|
$9,280.000
|
$8,137.210
|
$11,700.000
|
$10,300.000
|
$8,114.100
|
$10,000.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
30.000
|
$41.000
|
$55.200
|
$53.000
|
$55.310
|
$62.000
|
$100.000
|
$20.540
|
$55.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
1.000
|
$450.000
|
$313.600
|
$295.000
|
$315.300
|
$610.000
|
$540.000
|
$293.970
|
$500.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
32.000
|
$50.000
|
$58.600
|
$28.000
|
$29.930
|
$47.000
|
$41.000
|
$31.250
|
$55.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
13.000
|
$823.000
|
$664.400
|
$625.000
|
$668.010
|
$1,100.000
|
$950.000
|
$677.200
|
$900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T-2EXT)
|
EA
|
2.000
|
$580.000
|
$898.400
|
$845.000
|
$903.150
|
$1,400.000
|
$1,340.000
|
$848.340
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
1.000
|
$700.000
|
$1,084.500
|
$1,020.000
|
$1,090.190
|
$1,700.000
|
$1,530.000
|
$964.430
|
$1,400.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
15.000
|
$501.000
|
$106.400
|
$100.000
|
$106.880
|
$100.000
|
$87.000
|
$109.840
|
$75.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
27,622.000
|
$0.440
|
$1.000
|
$0.250
|
$0.260
|
$0.300
|
$0.900
|
$0.890
|
$0.750
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
27,622.000
|
$0.410
|
$1.000
|
$0.250
|
$0.260
|
$0.300
|
$0.900
|
$0.890
|
$0.750
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,381.000
|
$6.000
|
$5.500
|
$4.300
|
$4.420
|
$5.300
|
$6.100
|
$6.070
|
$5.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
2,348.000
|
$2.500
|
$3.200
|
$0.770
|
$0.790
|
$1.000
|
$3.600
|
$3.570
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
39.000
|
$11.000
|
$26.500
|
$10.600
|
$10.900
|
$13.000
|
$30.000
|
$29.770
|
$25.000
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
8.000
|
$160.000
|
$334.700
|
$160.000
|
$164.470
|
$200.000
|
$378.000
|
$375.060
|
$315.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
8.000
|
$173.000
|
$425.200
|
$176.000
|
$180.920
|
$218.000
|
$480.000
|
$476.260
|
$400.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
|
LF
|
140.000
|
$10.000
|
$11.700
|
$4.300
|
$4.420
|
$5.300
|
$13.000
|
$13.100
|
$11.000
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(090MIL)
|
EA
|
2.000
|
$360.000
|
$558.000
|
$340.000
|
$349.500
|
$420.000
|
$630.000
|
$625.100
|
$525.000
|
|
RE PM TY II (W) 6" (SLD)
|
LF
|
9,918.000
|
$0.500
|
$0.500
|
$0.250
|
$0.260
|
$0.300
|
$0.500
|
$0.480
|
$0.400
|
|
RE PM TY II (W) 8" (SLD)
|
LF
|
2,625.000
|
$1.000
|
$1.200
|
$0.250
|
$0.260
|
$0.300
|
$1.200
|
$1.190
|
$1.000
|
|
RE PM TY II (W) 24" (SLD)
|
LF
|
39.000
|
$5.000
|
$26.500
|
$3.400
|
$3.490
|
$4.250
|
$30.000
|
$29.770
|
$25.000
|
|
RE PM TY II (W) (ARROW)
|
EA
|
8.000
|
$85.000
|
$334.700
|
$52.000
|
$53.450
|
$65.000
|
$378.000
|
$375.060
|
$315.000
|
|
RE PM TY II (Y) 6" (SLD)
|
LF
|
14,944.000
|
$2.000
|
$0.500
|
$0.250
|
$0.260
|
$0.300
|
$0.500
|
$0.480
|
$0.400
|
|
RE PROFILE PM TY I(W)6"(SLD)(090MIL)
|
LF
|
9,918.000
|
$2.000
|
$3.500
|
$1.330
|
$1.370
|
$1.650
|
$3.700
|
$3.690
|
$3.100
|
|
PRFB RUMBLE STRIP (BLK)(1')(CENTERLINE)
|
LF
|
17,390.000
|
$8.500
|
$4.200
|
$7.770
|
$7.990
|
$10.000
|
$4.800
|
$4.760
|
$4.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
133.000
|
$1.250
|
$9.700
|
$5.200
|
$5.350
|
$6.500
|
$10.800
|
$10.720
|
$9.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
487.000
|
$6.500
|
$8.400
|
$5.200
|
$5.350
|
$6.500
|
$9.600
|
$9.530
|
$8.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
55,244.000
|
$0.800
|
$0.700
|
$0.250
|
$0.260
|
$0.300
|
$0.700
|
$0.650
|
$0.550
|
|
|
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
5.000
|
$4,773.000
|
$8,503.900
|
$7,500.000
|
$8,411.880
|
$8,400.000
|
$4,800.000
|
$3,482.680
|
$8,000.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
5,681.000
|
$4.000
|
$5.000
|
$3.750
|
$4.330
|
$5.000
|
$4.500
|
$4.760
|
$4.500
|
|
|
BONDING COURSE
|
GAL
|
3,544.000
|
$4.000
|
$5.700
|
$3.750
|
$3.540
|
$4.500
|
$4.000
|
$4.760
|
$4.000
|
|
Totals: |
$6,105,602.640
|
$4,963,084.384
|
$5,542,963.130
|
$5,922,809.610
|
$6,019,461.050
|
$6,137,126.560
|
$6,492,643.211
|
$7,348,922.040
|