REMOVING CONC (RIPRAP)
|
SY
|
82.000
|
$10.000
|
$25.000
|
$24.000
|
$50.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
4,251.000
|
$18.000
|
$20.000
|
$24.000
|
$20.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
773.000
|
$7.000
|
$5.000
|
$15.000
|
$20.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
139.000
|
$18.000
|
$25.000
|
$25.000
|
$20.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
188.000
|
$40.000
|
$25.000
|
$25.000
|
$20.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,154.000
|
$6.250
|
$10.000
|
$25.000
|
$30.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
149.000
|
$6.000
|
$10.000
|
$37.000
|
$20.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
230.000
|
$20.000
|
$50.000
|
$35.000
|
$50.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
570.000
|
$19.000
|
$30.000
|
$52.000
|
$50.000
|
|
|
BLOCK SODDING
|
SY
|
5,740.000
|
$4.000
|
$1.000
|
$6.000
|
$10.000
|
|
|
VEGETATIVE WATERING
|
MG
|
89.500
|
$10.000
|
$10.000
|
$100.000
|
$65.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
147.000
|
$7.000
|
$25.000
|
$10.000
|
$10.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
125.000
|
$200.000
|
$100.000
|
$225.000
|
$120.000
|
|
|
CL A CONC (FLUME)
|
CY
|
4.000
|
$750.000
|
$1,000.000
|
$800.000
|
$2,000.000
|
|
|
BRIDGE SIDEWALK
|
SF
|
1,221.000
|
$20.000
|
$20.000
|
$95.000
|
$100.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
7.000
|
$700.000
|
$600.000
|
$1,200.000
|
$7,500.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
22.000
|
$110.000
|
$250.000
|
$350.000
|
$185.000
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
1,867.000
|
$120.000
|
$170.000
|
$155.000
|
$185.000
|
|
|
RETROFIT RAIL (TY C221)
|
LF
|
212.000
|
$170.000
|
$200.000
|
$99.000
|
$185.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
6.000
|
$400.000
|
$1,000.000
|
$1,800.000
|
$1,000.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
2.000
|
$32,000.000
|
$10,000.000
|
$12,000.000
|
$20,000.000
|
|
|
GRATE & FRAME
|
EA
|
47.000
|
$2,050.000
|
$3,000.000
|
$1,200.000
|
$3,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$50,000.000
|
$200,000.000
|
$200,000.000
|
$250,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$5,000.000
|
$1,000.000
|
$6,000.000
|
$8,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,980.000
|
$3.000
|
$1.000
|
$5.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,980.000
|
$1.000
|
$1.000
|
$1.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
200.000
|
$7.000
|
$1.000
|
$15.000
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
200.000
|
$1.500
|
$1.000
|
$3.000
|
$9.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
380.000
|
$15.000
|
$75.000
|
$20.000
|
$40.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$20.000
|
$75.000
|
$20.000
|
$40.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
380.000
|
$7.000
|
$20.000
|
$20.000
|
$20.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$10.000
|
$20.000
|
$20.000
|
$20.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
380.000
|
$12.600
|
$20.000
|
$20.000
|
$40.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$14.500
|
$20.000
|
$20.000
|
$40.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
2,716.000
|
$30.000
|
$30.000
|
$25.000
|
$55.000
|
|
|
CONC CURB (TY F)
|
LF
|
1,830.000
|
$105.000
|
$161.000
|
$25.000
|
$55.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
4,813.000
|
$115.000
|
$93.000
|
$125.000
|
$125.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
4,965.000
|
$65.000
|
$71.000
|
$65.000
|
$65.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
1.000
|
$2,300.000
|
$1,800.000
|
$1,800.000
|
$3,000.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
3.000
|
$2,700.000
|
$2,000.000
|
$1,800.000
|
$3,000.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
10.000
|
$1,940.000
|
$1,500.000
|
$1,500.000
|
$3,000.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE A)
|
SY
|
39.000
|
$140.000
|
$200.000
|
$300.000
|
$75.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
950.000
|
$2.500
|
$3.000
|
$2.000
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$250.000
|
$300.000
|
$2,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
7.000
|
$625.000
|
$1,000.000
|
$700.000
|
$1,500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY TWT
|
EA
|
3.000
|
$510.000
|
$300.000
|
$300.000
|
$850.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
7.000
|
$135.000
|
$100.000
|
$50.000
|
$20.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
92.000
|
$0.900
|
$1.000
|
$2.000
|
$6.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,567.000
|
$7.000
|
$6.000
|
$7.000
|
$20.000
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
60.000
|
$0.150
|
$1.000
|
$8.000
|
$2.000
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
92.000
|
$0.250
|
$1.000
|
$8.000
|
$6.000
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
1,567.000
|
$4.000
|
$2.000
|
$3.000
|
$20.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
60.000
|
$0.350
|
$2.000
|
$3.000
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
60.000
|
$1.000
|
$2.000
|
$3.000
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
92.000
|
$0.300
|
$2.000
|
$3.000
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
957.000
|
$5.000
|
$3.000
|
$4.000
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
60.000
|
$1.000
|
$1.000
|
$2.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
92.000
|
$1.000
|
$2.000
|
$3.000
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,567.000
|
$1.000
|
$1.500
|
$3.000
|
$20.000
|
|
|
D-GR HMA TY-D SAC-A PG64-22(EXEMPT)
|
TON
|
55.000
|
$150.000
|
$250.000
|
$250.000
|
$500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
41.000
|
$65.000
|
$100.000
|
$75.000
|
$150.000
|
|
|
TMA (STATIONARY)
|
DAY
|
117.000
|
$150.000
|
$100.000
|
$600.000
|
$250.000
|
|
Totals: |
$2,036,273.900
|
$2,266,623.500
|
$2,349,154.000
|
$2,938,285.500
|