PREPARING ROW
|
STA
|
168.000
|
$1,500.000
|
$1,000.000
|
$1,150.000
|
$600.000
|
$2,500.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
60.000
|
$12.000
|
$20.000
|
$55.000
|
$41.000
|
$70.000
|
|
|
REMOVE STAB BASE AND ASPH PAV (1"-3")
|
SY
|
36,668.000
|
$5.000
|
$2.300
|
$2.500
|
$3.000
|
$1.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
6,225.000
|
$7.500
|
$4.000
|
$16.000
|
$7.000
|
$10.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
3,757.000
|
$8.000
|
$8.000
|
$16.000
|
$3.000
|
$3.000
|
|
|
BACKFILL (TY A)
|
STA
|
168.000
|
$200.000
|
$150.000
|
$225.000
|
$113.000
|
$330.000
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
50.000
|
$30.000
|
$35.000
|
$50.000
|
$48.000
|
$50.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
49,355.000
|
$0.400
|
$0.430
|
$0.420
|
$0.500
|
$0.590
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
49,355.000
|
$0.400
|
$0.330
|
$0.320
|
$0.250
|
$0.490
|
|
|
VEGETATIVE WATERING
|
MG
|
857.000
|
$30.000
|
$20.000
|
$52.000
|
$18.000
|
$25.000
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
672.000
|
$3.000
|
$1.000
|
$1.000
|
$31.000
|
$1.000
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
|
CY
|
12,293.000
|
$30.000
|
$30.000
|
$28.000
|
$38.000
|
$57.000
|
|
|
RWRK BS MTL(TY B)(4")(DEN CNT)(ORG POS)
|
CY
|
4,446.000
|
$6.000
|
$8.000
|
$11.000
|
$3.000
|
$20.000
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
65,791.000
|
$2.000
|
$2.900
|
$3.300
|
$1.000
|
$2.150
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
980.000
|
$160.000
|
$225.000
|
$177.000
|
$208.000
|
$200.000
|
|
|
CEMENT
|
TON
|
567.000
|
$180.000
|
$195.000
|
$190.000
|
$246.000
|
$225.000
|
|
|
CEM TRT (MX EXT MTL/NW BASE)(DC)(10")
|
SY
|
62,416.000
|
$2.000
|
$2.400
|
$2.000
|
$1.000
|
$2.500
|
|
|
PRIME COAT (MC-30)
|
GAL
|
12,483.000
|
$5.000
|
$5.000
|
$5.000
|
$6.000
|
$6.000
|
|
|
ASPH (TIER II)
|
GAL
|
17,713.000
|
$5.000
|
$5.500
|
$6.500
|
$5.000
|
$6.000
|
|
|
AGGR (TY-B GR-4P SAC-B)
|
CY
|
494.000
|
$90.000
|
$90.000
|
$70.000
|
$123.000
|
$200.000
|
|
|
PLANE CONC PAV(0" TO 1-1/2")
|
SY
|
572.000
|
$13.500
|
$15.000
|
$18.000
|
$26.000
|
$10.000
|
|
|
STRUCT EXCAV
|
CY
|
78.000
|
$12.000
|
$20.000
|
$16.000
|
$81.000
|
$175.000
|
|
|
CEM STABIL BKFL
|
CY
|
70.000
|
$70.000
|
$65.000
|
$76.000
|
$66.000
|
$150.000
|
|
|
STRUCT EXCAV (SPECIAL)
|
CY
|
40.000
|
$40.000
|
$60.000
|
$45.000
|
$79.000
|
$175.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
265.000
|
$3.000
|
$1.500
|
$5.000
|
$8.000
|
$1.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
3.000
|
$425.000
|
$750.000
|
$1,250.000
|
$963.000
|
$1,500.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
648.000
|
$75.000
|
$60.000
|
$55.000
|
$54.000
|
$175.000
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
196.000
|
$80.000
|
$65.000
|
$60.000
|
$64.000
|
$200.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
10.000
|
$1,500.000
|
$1,200.000
|
$1,200.000
|
$1,600.000
|
$1,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
34.000
|
$1,200.000
|
$1,000.000
|
$1,400.000
|
$1,700.000
|
$1,000.000
|
|
|
REMOV STR (SET)
|
EA
|
6.000
|
$500.000
|
$200.000
|
$400.000
|
$371.000
|
$450.000
|
|
|
REMOV STR (PIPE)
|
LF
|
657.000
|
$15.000
|
$6.000
|
$7.000
|
$8.000
|
$15.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$360,000.000
|
$330,000.000
|
$300,000.000
|
$255,000.000
|
$500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$5,000.000
|
$4,000.000
|
$5,500.000
|
$7,500.000
|
$2,200.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
50.000
|
$40.000
|
$30.000
|
$105.000
|
$105.000
|
$90.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
50.000
|
$20.000
|
$15.000
|
$75.000
|
$75.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
390.000
|
$25.000
|
$18.000
|
$42.000
|
$25.000
|
$14.880
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
390.000
|
$8.000
|
$5.000
|
$24.000
|
$12.000
|
$5.380
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,480.000
|
$3.000
|
$4.000
|
$3.500
|
$3.000
|
$4.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,480.000
|
$1.000
|
$1.500
|
$1.500
|
$2.000
|
$1.350
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,380.000
|
$5.000
|
$5.500
|
$6.000
|
$6.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,380.000
|
$1.000
|
$1.500
|
$1.500
|
$1.000
|
$1.350
|
|
|
CONSTRUCTING DETOURS
|
SY
|
82.000
|
$55.000
|
$190.000
|
$275.000
|
$150.000
|
$170.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
58.000
|
$80.000
|
$70.000
|
$150.000
|
$130.000
|
$400.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
540.000
|
$40.000
|
$45.000
|
$65.000
|
$42.000
|
$105.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
400.000
|
$26.000
|
$29.000
|
$32.000
|
$25.000
|
$39.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,000.000
|
$3,300.000
|
$3,500.000
|
$3,200.000
|
$3,650.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
3.000
|
$250.000
|
$220.000
|
$350.000
|
$400.000
|
$325.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
20.000
|
$25.000
|
$40.000
|
$30.000
|
$26.000
|
$26.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
9.000
|
$700.000
|
$750.000
|
$750.000
|
$990.000
|
$825.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
14.000
|
$900.000
|
$780.000
|
$1,100.000
|
$1,300.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
6.000
|
$1,100.000
|
$1,050.000
|
$1,100.000
|
$1,310.000
|
$1,200.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
29.000
|
$90.000
|
$70.000
|
$190.000
|
$72.000
|
$80.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
24.000
|
$50.000
|
$40.000
|
$115.000
|
$40.000
|
$25.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
24.000
|
$150.000
|
$70.000
|
$60.000
|
$118.000
|
$90.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
681.000
|
$0.600
|
$0.660
|
$0.650
|
$0.750
|
$0.650
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
16.000
|
$8.000
|
$7.100
|
$7.000
|
$7.000
|
$7.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
6,174.000
|
$0.900
|
$0.660
|
$1.000
|
$0.750
|
$0.650
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
27,358.000
|
$0.600
|
$0.610
|
$0.650
|
$0.500
|
$0.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,560.000
|
$1.000
|
$1.250
|
$1.200
|
$5.000
|
$4.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
36.000
|
$6.500
|
$9.100
|
$9.000
|
$9.000
|
$9.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
32,843.000
|
$0.120
|
$0.310
|
$0.300
|
$0.250
|
$0.300
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
36.000
|
$3.000
|
$2.100
|
$2.000
|
$2.000
|
$2.000
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
3,860.000
|
$0.120
|
$0.320
|
$0.320
|
$0.250
|
$0.310
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
7,175.000
|
$0.120
|
$0.330
|
$0.320
|
$0.250
|
$0.320
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
3,860.000
|
$0.300
|
$0.430
|
$0.450
|
$0.500
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
7,983.000
|
$0.300
|
$0.430
|
$0.450
|
$0.500
|
$0.420
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
32,843.000
|
$0.500
|
$0.760
|
$0.800
|
$0.750
|
$0.750
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
296.000
|
$3.250
|
$4.300
|
$4.200
|
$4.000
|
$4.200
|
|
TRAFFIC BUTTON TY Y
|
EA
|
1,328.000
|
$4.500
|
$1.860
|
$1.900
|
$2.000
|
$1.850
|
|
TRAFFIC BUTTON TY B
|
EA
|
5,084.000
|
$2.000
|
$1.860
|
$1.900
|
$2.000
|
$1.850
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
12,781.000
|
$0.350
|
$0.360
|
$1.200
|
$0.250
|
$0.350
|
|
|
D-GR HMA TY-D SAC-A PG76-22
|
TON
|
10,233.000
|
$127.000
|
$125.000
|
$117.000
|
$154.000
|
$165.000
|
|
|
BONDING COURSE
|
GAL
|
4,242.000
|
$5.000
|
$4.000
|
$4.500
|
$7.000
|
$6.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$8,000.000
|
$5,000.000
|
$6,000.000
|
$7,000.000
|
$200.000
|
|
|
TMA (STATIONARY)
|
DAY
|
360.000
|
$200.000
|
$1.000
|
$30.000
|
$10.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$200.000
|
$1.000
|
$1.000
|
$20.000
|
$400.000
|
|
Totals: |
$3,910,866.610
|
$3,701,235.710
|
$3,839,510.900
|
$3,918,802.000
|
$5,233,484.560
|