PREPARING ROW
|
STA
|
160.000
|
$1,500.000
|
$2,000.000
|
$4,000.000
|
$2,000.000
|
$3,250.000
|
$300.000
|
$425.000
|
$1,766.607
|
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
38.000
|
$13.140
|
$23.470
|
$55.000
|
$30.000
|
$23.150
|
$100.000
|
$13.500
|
$23.159
|
|
|
|
RMV (4") TRT/UNTRT BASE & ASPH PAV
|
SY
|
37,354.000
|
$12.000
|
$0.320
|
$3.000
|
$4.000
|
$3.100
|
$2.250
|
$3.750
|
$1.071
|
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
5,167.000
|
$4.000
|
$2.150
|
$5.000
|
$2.000
|
$4.300
|
$2.250
|
$5.500
|
$4.676
|
|
|
|
EXCAV (ROADWAY)
|
CY
|
5,257.000
|
$7.000
|
$18.720
|
$45.000
|
$2.000
|
$8.650
|
$12.000
|
$14.000
|
$11.996
|
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
30,703.000
|
$5.920
|
$18.200
|
$1.000
|
$12.000
|
$15.500
|
$22.000
|
$18.000
|
$26.826
|
|
|
|
BACKFILL (TY A)
|
STA
|
160.000
|
$328.160
|
$152.560
|
$175.000
|
$180.000
|
$262.000
|
$125.000
|
$156.000
|
$61.034
|
|
|
|
FURN & PLACE TOPSOIL (VEH)
|
CY
|
50.000
|
$32.500
|
$28.290
|
$15.000
|
$50.000
|
$43.250
|
$55.000
|
$35.000
|
$110.427
|
|
|
|
HYDRO MULCH SEED (PERM_RURAL_CLAY)
|
SY
|
69,321.000
|
$0.450
|
$0.450
|
$0.440
|
$0.500
|
$0.500
|
$0.550
|
$0.750
|
$0.666
|
|
|
|
HYDRO MULCH SEED (TEMP_WARM)
|
SY
|
69,321.000
|
$0.400
|
$0.280
|
$0.270
|
$0.500
|
$0.310
|
$0.500
|
$0.750
|
$0.654
|
|
|
|
VEGETATIVE WATERING
|
TGL
|
1,509.000
|
$30.310
|
$59.590
|
$35.000
|
$25.000
|
$31.600
|
$25.000
|
$9.000
|
$83.300
|
|
|
|
SPRINKLING (DUST CONTROL)
|
TGL
|
637.000
|
$10.190
|
$1.000
|
$1.000
|
$30.000
|
$31.600
|
$30.000
|
$9.000
|
$51.370
|
|
|
|
PROOF ROLLING
|
HR
|
12.810
|
$40.250
|
$89.220
|
$10.000
|
$50.000
|
$59.700
|
$80.000
|
$93.000
|
$49.220
|
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNL POS)
|
CY
|
17,182.000
|
$55.000
|
$31.480
|
$38.000
|
$55.000
|
$38.650
|
$42.000
|
$53.000
|
$53.693
|
|
|
|
LIME (COM OR QK)(SLURRY)
|
TON
|
1,288.000
|
$215.500
|
$250.710
|
$210.000
|
$300.000
|
$337.000
|
$350.000
|
$386.000
|
$341.016
|
|
|
|
LIME TRT (EXIST MATL)(12")
|
SY
|
65,053.000
|
$3.250
|
$3.260
|
$2.500
|
$3.000
|
$2.000
|
$3.500
|
$4.250
|
$3.524
|
|
|
|
CEMENT
|
TON
|
578.000
|
$190.000
|
$177.210
|
$200.000
|
$200.000
|
$206.000
|
$200.000
|
$213.000
|
$231.466
|
|
|
|
CEMENT TRT (NEW BASE)(10")
|
SY
|
61,851.000
|
$2.500
|
$3.790
|
$2.500
|
$3.000
|
$1.900
|
$2.000
|
$3.000
|
$3.177
|
|
|
|
SALV,HAUL & STKPL RCL ASPH PV (1 TO 3")
|
SY
|
34,905.000
|
$3.500
|
$1.340
|
$1.000
|
$5.000
|
$3.350
|
$1.500
|
$2.750
|
$5.664
|
|
|
|
PRIME COAT (MC-30)
|
GAL
|
12,081.000
|
$6.260
|
$6.380
|
$5.000
|
$8.000
|
$7.000
|
$6.500
|
$7.150
|
$9.520
|
|
|
|
ASPH (TIER II)
|
GAL
|
17,595.000
|
$5.290
|
$6.820
|
$5.000
|
$7.000
|
$4.300
|
$4.750
|
$6.000
|
$9.694
|
|
|
|
AGGR (TY-D GR-4P) (SAC B)
|
CY
|
467.000
|
$186.100
|
$74.990
|
$75.000
|
$170.000
|
$87.750
|
$175.000
|
$159.250
|
$211.738
|
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
10,310.000
|
$124.100
|
$113.860
|
$150.000
|
$130.000
|
$140.000
|
$145.000
|
$152.250
|
$140.841
|
|
|
|
PLANE & TEXT ASPH CONC PAV(1.5")
|
SY
|
2,909.000
|
$4.310
|
$4.110
|
$5.000
|
$5.000
|
$2.250
|
$5.000
|
$1.750
|
$2.760
|
|
|
|
STRUCT EXCAV (SPECIAL)
|
CY
|
152.000
|
$86.250
|
$95.950
|
$100.000
|
$90.000
|
$84.300
|
$150.000
|
$106.750
|
$103.411
|
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
152.000
|
$70.420
|
$101.000
|
$100.000
|
$120.000
|
$70.000
|
$55.000
|
$38.000
|
$122.036
|
|
|
|
CEM STABIL BKFL
|
CY
|
309.000
|
$68.910
|
$80.800
|
$100.000
|
$300.000
|
$76.450
|
$200.000
|
$81.250
|
$191.352
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
409.000
|
$4.250
|
$1.010
|
$5.000
|
$20.000
|
$3.750
|
$15.000
|
$2.500
|
$5.950
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,750.000
|
$10.000
|
$0.010
|
$3.000
|
$30.000
|
$68.300
|
$30.000
|
$98.000
|
$7.514
|
|
|
|
SHEET PILING (PZ - 27)
|
SF
|
6,556.000
|
$71.950
|
$52.000
|
$58.000
|
$70.000
|
$83.000
|
$85.000
|
$111.250
|
$81.434
|
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
1,360.000
|
$259.650
|
$404.000
|
$360.000
|
$330.000
|
$493.000
|
$375.000
|
$408.250
|
$462.373
|
|
|
|
CL C CONC (ABUT)
|
CY
|
22.600
|
$1,743.600
|
$2,828.000
|
$2,025.000
|
$1,190.000
|
$1,300.000
|
$1,500.000
|
$2,136.000
|
$1,409.458
|
|
|
|
CL C CONC (CAP)
|
CY
|
34.400
|
$2,139.500
|
$4,646.000
|
$4,200.000
|
$2,300.000
|
$1,860.000
|
$3,000.000
|
$4,786.000
|
$1,425.909
|
|
|
|
CL C CONC (COLUMN)
|
CY
|
13.900
|
$1,459.450
|
$5,050.000
|
$1,200.000
|
$2,010.000
|
$3,260.000
|
$5,000.000
|
$2,121.000
|
$1,320.722
|
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
5,851.000
|
$56.000
|
$23.230
|
$25.000
|
$50.000
|
$27.100
|
$25.000
|
$32.750
|
$21.543
|
|
|
|
PRESTR CONC SLAB BEAM (4SB12)
|
LF
|
1,005.000
|
$350.000
|
$272.700
|
$225.000
|
$330.000
|
$236.000
|
$275.000
|
$280.250
|
$199.598
|
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
335.000
|
$245.760
|
$272.700
|
$275.000
|
$340.000
|
$236.000
|
$300.000
|
$284.750
|
$230.777
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
164.000
|
$550.000
|
$409.050
|
$750.000
|
$650.000
|
$462.000
|
$675.000
|
$391.000
|
$566.545
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
69.000
|
$735.030
|
$419.150
|
$750.000
|
$760.000
|
$671.000
|
$650.000
|
$391.000
|
$654.009
|
|
|
|
RIPRAP (STONE PROTECTION)(15 IN)
|
CY
|
32.000
|
$190.920
|
$328.250
|
$350.000
|
$280.000
|
$303.000
|
$450.000
|
$194.500
|
$328.926
|
|
|
|
ELASTOMERIC BEARING (PLAIN)
|
EA
|
120.000
|
$1,400.000
|
$1.010
|
$200.000
|
$470.000
|
$276.000
|
$35.000
|
$100.000
|
$0.011
|
|
|
|
RAIL (TY T223)
|
LF
|
364.000
|
$146.150
|
$191.900
|
$200.000
|
$500.000
|
$176.000
|
$200.000
|
$202.000
|
$142.908
|
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
67.000
|
$154.320
|
$303.000
|
$175.000
|
$140.000
|
$173.000
|
$175.000
|
$195.000
|
$198.124
|
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
36.000
|
$212.450
|
$363.600
|
$375.000
|
$220.000
|
$199.000
|
$220.000
|
$211.000
|
$294.729
|
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
342.000
|
$150.000
|
$212.100
|
$145.000
|
$90.000
|
$83.100
|
$105.000
|
$85.500
|
$164.346
|
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
208.000
|
$170.000
|
$242.400
|
$225.000
|
$130.000
|
$119.000
|
$150.000
|
$119.750
|
$163.077
|
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
18.000
|
$1,500.000
|
$909.000
|
$1,250.000
|
$1,230.000
|
$934.000
|
$2,200.000
|
$1,008.000
|
$1,005.229
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
31.000
|
$1,000.000
|
$1,111.000
|
$1,300.000
|
$1,360.000
|
$1,200.000
|
$2,200.000
|
$1,123.000
|
$1,148.894
|
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
5.000
|
$1,500.000
|
$1,161.500
|
$1,500.000
|
$1,560.000
|
$1,220.000
|
$2,500.000
|
$1,295.000
|
$1,222.169
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
5.000
|
$2,000.000
|
$1,191.800
|
$1,750.000
|
$1,560.000
|
$1,220.000
|
$2,500.000
|
$1,295.000
|
$1,275.302
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$1,849.240
|
$1,616.000
|
$1,900.000
|
$1,760.000
|
$1,390.000
|
$2,800.000
|
$1,467.000
|
$1,624.690
|
|
|
|
SET (TY II) (18") (RCP) (4:1) (P)
|
EA
|
1.000
|
$1,350.000
|
$1,010.000
|
$2,900.000
|
$1,230.000
|
$867.000
|
$3,400.000
|
$1,008.000
|
$2,582.993
|
|
|
|
REMOV STR (SET)
|
EA
|
40.000
|
$437.540
|
$404.000
|
$400.000
|
$360.000
|
$246.000
|
$500.000
|
$167.750
|
$290.423
|
|
|
|
REMOV STR (PIPE)
|
LF
|
960.000
|
$13.800
|
$30.300
|
$20.000
|
$10.000
|
$11.850
|
$15.000
|
$12.250
|
$19.323
|
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$90,000.000
|
$118,170.000
|
$10,000.000
|
$99,460.000
|
$125,000.000
|
$325,000.000
|
$123,000.000
|
$227,237.235
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$778,644.920
|
$500,000.000
|
$800,000.000
|
$361,500.000
|
$750,000.000
|
$925,000.000
|
$450,000.000
|
$883,529.970
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$2,350.000
|
$7,300.000
|
$2,500.000
|
$500.000
|
$2,940.000
|
$12,000.000
|
$3,255.000
|
$2,833.985
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$8,145.870
|
$20,000.000
|
$70.000
|
$5,750.000
|
$15,000.000
|
$31,206.000
|
$4,760.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
253.000
|
$109.830
|
$35.890
|
$1.000
|
$70.000
|
$28.700
|
$250.000
|
$207.000
|
$260.474
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
253.000
|
$196.640
|
$0.010
|
$1.000
|
$70.000
|
$115.000
|
$25.000
|
$303.000
|
$416.665
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
56.000
|
$52.020
|
$90.900
|
$90.000
|
$120.000
|
$65.100
|
$100.000
|
$97.500
|
$119.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
56.000
|
$20.290
|
$48.230
|
$47.750
|
$90.000
|
$22.250
|
$50.000
|
$46.000
|
$53.550
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
468.000
|
$27.440
|
$22.180
|
$50.000
|
$20.000
|
$15.000
|
$25.000
|
$7.750
|
$65.450
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
468.000
|
$2.850
|
$13.760
|
$10.000
|
$9.000
|
$7.750
|
$10.000
|
$2.250
|
$23.800
|
|
|
|
FRNT END LOADER WORK (ERSN & SEDM CONT)
|
HR
|
24.000
|
$150.000
|
$95.860
|
$100.000
|
$200.000
|
$63.000
|
$125.000
|
$91.500
|
$79.730
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
678.000
|
$6.280
|
$3.290
|
$6.000
|
$4.000
|
$3.850
|
$5.000
|
$5.000
|
$7.140
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
678.000
|
$2.590
|
$2.380
|
$4.000
|
$1.000
|
$1.000
|
$2.000
|
$1.500
|
$3.570
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,181.000
|
$5.500
|
$5.610
|
$3.790
|
$6.000
|
$3.200
|
$8.000
|
$7.250
|
$9.520
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,181.000
|
$1.290
|
$1.170
|
$1.000
|
$1.000
|
$1.000
|
$2.000
|
$1.500
|
$2.380
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
249.000
|
$110.000
|
$94.860
|
$150.000
|
$110.000
|
$69.800
|
$150.000
|
$69.000
|
$81.491
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,232.000
|
$63.960
|
$51.100
|
$70.000
|
$40.000
|
$46.900
|
$60.000
|
$27.500
|
$74.059
|
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
31,738.000
|
$0.190
|
$0.140
|
$0.180
|
$0.250
|
$0.180
|
$0.150
|
$0.250
|
$0.178
|
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
15,319.000
|
$0.230
|
$0.200
|
$0.250
|
$0.250
|
$0.240
|
$0.250
|
$0.250
|
$0.249
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
576.000
|
$32.170
|
$29.400
|
$29.950
|
$30.000
|
$34.000
|
$33.000
|
$34.500
|
$31.921
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
633.000
|
$6.790
|
$3.030
|
$3.000
|
$4.000
|
$3.000
|
$3.000
|
$3.500
|
$4.777
|
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
4.000
|
$206.050
|
$4.040
|
$600.000
|
$920.000
|
$210.000
|
$625.000
|
$688.500
|
$366.693
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$4,590.910
|
$3,509.750
|
$3,878.000
|
$3,880.000
|
$3,920.000
|
$4,000.000
|
$4,449.750
|
$3,132.773
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$1,475.000
|
$333.300
|
$300.000
|
$580.000
|
$265.000
|
$325.000
|
$344.250
|
$733.386
|
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
4.000
|
$34,250.000
|
$30,441.400
|
$29,000.000
|
$25,630.000
|
$25,500.000
|
$25,000.000
|
$33,274.750
|
$25,377.790
|
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
5.000
|
$210.000
|
$237.350
|
$275.000
|
$910.000
|
$307.000
|
$275.000
|
$401.750
|
$327.250
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
19.000
|
$796.930
|
$813.050
|
$725.000
|
$870.000
|
$801.000
|
$725.000
|
$975.500
|
$862.750
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
9.000
|
$847.730
|
$883.750
|
$975.000
|
$1,020.000
|
$1,080.000
|
$975.000
|
$1,091.000
|
$1,160.250
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
8.000
|
$962.580
|
$979.700
|
$1,050.000
|
$1,090.000
|
$1,160.000
|
$1,050.000
|
$1,205.000
|
$1,249.500
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$1,162.500
|
$1,222.100
|
$1,350.000
|
$1,310.000
|
$1,490.000
|
$1,350.000
|
$1,435.000
|
$1,606.500
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
1.000
|
$1,275.000
|
$1,555.400
|
$1,600.000
|
$1,770.000
|
$1,840.000
|
$1,600.000
|
$1,547.450
|
$1,904.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
26.000
|
$75.000
|
$132.120
|
$65.000
|
$280.000
|
$71.750
|
$100.000
|
$229.500
|
$77.350
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
27.000
|
$32.500
|
$30.300
|
$65.000
|
$220.000
|
$71.750
|
$75.000
|
$28.750
|
$77.350
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
|
EA
|
12.000
|
$20.000
|
$24.240
|
$45.000
|
$210.000
|
$49.700
|
$50.000
|
$17.250
|
$53.550
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
14.000
|
$85.000
|
$64.640
|
$95.000
|
$240.000
|
$105.000
|
$100.000
|
$86.250
|
$113.050
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
30.000
|
$20.000
|
$18.690
|
$10.000
|
$100.000
|
$11.050
|
$10.000
|
$11.500
|
$11.900
|
|
|
|
INSTL OM SM RD SIGN (1-OM-PW)R
|
EA
|
9.000
|
$28.640
|
$35.350
|
$35.000
|
$640.000
|
$39.000
|
$35.000
|
$17.250
|
$41.650
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
22,019.000
|
$0.540
|
$0.490
|
$0.480
|
$0.500
|
$0.520
|
$0.500
|
$0.750
|
$0.856
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
400.000
|
$2.000
|
$1.520
|
$1.500
|
$2.000
|
$1.650
|
$1.500
|
$1.750
|
$1.428
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
45.000
|
$10.200
|
$16.160
|
$16.000
|
$20.000
|
$17.650
|
$17.000
|
$12.750
|
$9.520
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
1,128.000
|
$0.320
|
$0.790
|
$0.780
|
$1.000
|
$0.870
|
$1.000
|
$1.000
|
$0.856
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
16,892.000
|
$0.540
|
$0.490
|
$0.480
|
$0.500
|
$0.540
|
$0.500
|
$0.750
|
$0.856
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)12"(SLD)
|
LF
|
260.000
|
$1.780
|
$2.020
|
$2.000
|
$2.000
|
$2.200
|
$2.000
|
$3.500
|
$4.760
|
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
20.000
|
$4.150
|
$3.540
|
$3.500
|
$4.000
|
$3.850
|
$5.000
|
$5.500
|
$6.545
|
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
244.000
|
$4.200
|
$3.540
|
$3.500
|
$4.000
|
$3.850
|
$5.000
|
$5.500
|
$6.545
|
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
11,370.000
|
$0.730
|
$0.390
|
$0.380
|
$0.400
|
$0.430
|
$0.400
|
$0.750
|
$1.190
|
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
11,370.000
|
$0.720
|
$0.390
|
$0.380
|
$0.400
|
$0.430
|
$0.400
|
$0.750
|
$1.190
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
30.000
|
$1.000
|
$1.250
|
$9.170
|
$5.000
|
$1.400
|
$2.000
|
$0.750
|
$29.750
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
1,220.000
|
$1.900
|
$1.250
|
$1.880
|
$5.000
|
$2.200
|
$2.000
|
$0.750
|
$4.165
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
400.000
|
$1.060
|
$2.020
|
$2.000
|
$2.000
|
$2.200
|
$2.000
|
$3.000
|
$1.487
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
100.000
|
$7.620
|
$16.160
|
$16.000
|
$20.000
|
$17.650
|
$16.000
|
$11.250
|
$16.660
|
|
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
335.000
|
$3.510
|
$3.540
|
$3.500
|
$4.000
|
$3.850
|
$3.500
|
$4.750
|
$8.330
|
|
|
|
RE PM TY III (W)(6")(SLD)
|
LF
|
340.000
|
$1.030
|
$15.150
|
$15.000
|
$20.000
|
$16.550
|
$15.000
|
$4.500
|
$11.900
|
|
|
|
RE PM TY III (Y)(6")(SLD)
|
LF
|
170.000
|
$1.100
|
$20.200
|
$20.000
|
$20.000
|
$22.100
|
$20.000
|
$4.500
|
$11.900
|
|
|
|
RE PM TY III (Y)(6")(BRK)
|
LF
|
40.000
|
$1.820
|
$25.250
|
$25.000
|
$30.000
|
$27.600
|
$25.000
|
$4.500
|
$11.900
|
|
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
33,146.000
|
$0.600
|
$0.670
|
$0.660
|
$1.000
|
$0.750
|
$0.750
|
$0.750
|
$0.856
|
|
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
3,410.000
|
$0.690
|
$1.120
|
$1.100
|
$1.000
|
$1.200
|
$1.200
|
$1.000
|
$0.856
|
|
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
12,954.000
|
$0.650
|
$0.850
|
$0.840
|
$1.000
|
$0.950
|
$1.000
|
$1.000
|
$0.856
|
|
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
2.000
|
$283.530
|
$151.500
|
$150.000
|
$150.000
|
$166.000
|
$150.000
|
$276.000
|
$416.500
|
|
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
2.000
|
$309.800
|
$277.750
|
$275.000
|
$280.000
|
$304.000
|
$275.000
|
$276.000
|
$476.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
20.000
|
$3.910
|
$35.350
|
$35.000
|
$40.000
|
$39.000
|
$35.000
|
$8.250
|
$6.545
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
463.000
|
$3.570
|
$7.580
|
$7.500
|
$8.000
|
$8.300
|
$8.000
|
$5.000
|
$6.545
|
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
14,080.000
|
$0.500
|
$0.360
|
$0.350
|
$0.350
|
$0.410
|
$0.350
|
$0.750
|
$0.654
|
|
|
|
PRSSR IRRIG PVC PIPE (18")
|
LF
|
60.000
|
$128.970
|
$454.500
|
$400.000
|
$210.000
|
$111.000
|
$225.000
|
$132.000
|
$142.868
|
|
|
|
PRSSR IRRIG PVC PIPE (30")
|
LF
|
60.000
|
$235.000
|
$909.000
|
$1,100.000
|
$850.000
|
$448.000
|
$260.000
|
$264.000
|
$224.145
|
|
|
|
BONDING COURSE
|
GAL
|
4,335.000
|
$6.720
|
$2.570
|
$4.000
|
$7.000
|
$2.800
|
$4.500
|
$5.000
|
$10.710
|
|
|
|
BIRD EXCLUSION METHOD
|
SF
|
5,858.000
|
$8.430
|
$10.100
|
$2.110
|
$4.000
|
$1.050
|
$7.000
|
$4.250
|
$3.251
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
620.000
|
$100.000
|
$0.000
|
$145.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
1A
|
|
THERMOPLASTIC PIPE (PP) (18")
|
LF
|
620.000
|
$100.000
|
$33.330
|
$0.000
|
$40.000
|
$49.150
|
$65.000
|
$49.000
|
$77.350
|
|
2
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
332.000
|
$160.000
|
$0.000
|
$150.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
2A
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
36.000
|
$160.000
|
$212.100
|
$0.000
|
$100.000
|
$95.350
|
$125.000
|
$92.500
|
$160.295
|
|
2A
|
|
THERMOPLASTIC PIPE (PP) (24")
|
LF
|
296.000
|
$160.000
|
$58.580
|
$0.000
|
$60.000
|
$64.650
|
$85.000
|
$72.000
|
$74.970
|
|
Totals: |
$8,715,146.708
|
$7,675,891.428
|
$8,162,839.910
|
$8,458,004.250
|
$8,635,762.437
|
$9,244,602.300
|
$9,286,973.830
|
$9,743,825.631
|