PREPARING ROW
|
STA
|
192.000
|
$1,200.000
|
$1,500.000
|
$1,875.000
|
$2,500.000
|
$704.740
|
|
|
REMOV CONC (MOWSTRIP)
|
SY
|
157.000
|
$17.500
|
$10.000
|
$15.000
|
$31.170
|
$52.900
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
65.000
|
$25.000
|
$25.000
|
$40.000
|
$36.830
|
$53.480
|
|
|
EXCAV (ROADWAY)
|
CY
|
154.000
|
$8.000
|
$18.000
|
$15.000
|
$640.210
|
$36.750
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
1,971.000
|
$8.000
|
$17.000
|
$20.000
|
$54.140
|
$25.950
|
|
|
BACKFILL (TY A)
|
STA
|
187.000
|
$275.000
|
$280.000
|
$125.000
|
$276.840
|
$510.580
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
40,224.000
|
$3.000
|
$2.000
|
$0.500
|
$3.660
|
$2.290
|
|
|
DRILL SEED (PERM_RURAL_SAND)
|
SY
|
40,224.000
|
$0.500
|
$0.500
|
$0.690
|
$0.690
|
$0.830
|
|
|
HYDRO MULCH SEED (TEMP_WARM)
|
SY
|
40,224.000
|
$0.400
|
$0.500
|
$0.380
|
$0.380
|
$0.490
|
|
|
VEGETATIVE WATERING
|
TGL
|
681.000
|
$14.000
|
$20.000
|
$35.000
|
$60.000
|
$71.700
|
|
|
SPRINKLING (DUST CONTROL)
|
TGL
|
748.000
|
$2.000
|
$18.000
|
$1.000
|
$1.000
|
$40.590
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNL POS)
|
CY
|
11,580.000
|
$50.000
|
$45.000
|
$40.000
|
$31.330
|
$47.230
|
|
|
REWORK BS MTL (TY B)(6")(DC)(ORG POS)
|
CY
|
7,912.000
|
$10.000
|
$5.000
|
$18.000
|
$7.540
|
$19.260
|
|
|
LIME (COM OR QK)(SLURRY)
|
TON
|
1,470.000
|
$220.000
|
$325.000
|
$275.000
|
$267.710
|
$349.180
|
|
|
LIME TRT (EXIST MATL)(12")
|
SY
|
74,144.000
|
$2.500
|
$2.000
|
$3.000
|
$3.120
|
$3.020
|
|
|
CEMENT
|
TON
|
662.000
|
$200.000
|
$200.000
|
$210.000
|
$192.750
|
$216.490
|
|
|
CEMENT TRT (EXIST MATL & NEW BASE)(10")
|
SY
|
70,330.000
|
$2.400
|
$2.000
|
$2.000
|
$3.540
|
$3.770
|
|
|
SALV,HAUL & STKPL RCL ASPH PV (1 TO 3")
|
SY
|
53,830.000
|
$5.000
|
$3.000
|
$1.000
|
$1.560
|
$1.870
|
|
|
PRIME COAT (MC-30)
|
GAL
|
13,720.000
|
$5.000
|
$6.000
|
$4.000
|
$4.570
|
$4.750
|
|
|
AGGR (TY-D, GR-4)(SAC-B)
|
CY
|
550.000
|
$200.000
|
$120.000
|
$100.000
|
$43.310
|
$164.600
|
|
|
ASPH (TIER II)
|
GAL
|
20,580.000
|
$4.000
|
$5.000
|
$3.000
|
$6.460
|
$3.520
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
11,375.000
|
$155.000
|
$120.000
|
$140.000
|
$116.680
|
$133.800
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
2,128.000
|
$2.000
|
$3.000
|
$2.000
|
$6.840
|
$3.750
|
|
|
STRUCT EXCAV (SPECIAL)
|
CY
|
47.000
|
$97.000
|
$100.000
|
$100.000
|
$80.000
|
$94.610
|
|
|
CEM STABIL BKFL
|
CY
|
90.000
|
$125.000
|
$115.000
|
$70.000
|
$110.000
|
$97.340
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,201.000
|
$22.000
|
$10.000
|
$1.000
|
$0.500
|
$7.240
|
|
|
CL A CONC (COLLAR)
|
EA
|
5.000
|
$2,000.000
|
$6,000.000
|
$1,750.000
|
$4,400.000
|
$1,366.260
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
42.000
|
$525.000
|
$600.000
|
$600.000
|
$1,000.000
|
$551.600
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
8.000
|
$200.000
|
$450.000
|
$600.000
|
$350.000
|
$578.190
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
137.300
|
$90.000
|
$160.000
|
$50.000
|
$37.220
|
$72.380
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,084.000
|
$100.000
|
$85.000
|
$155.000
|
$140.000
|
$117.520
|
|
|
RC PIPE (CL III)(21 IN)
|
LF
|
110.000
|
$150.000
|
$105.000
|
$280.000
|
$280.000
|
$223.720
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
36.000
|
$300.000
|
$245.000
|
$375.000
|
$500.000
|
$228.120
|
|
|
HEADWALL (CH - FW - 0) (DIA= 12 IN)
|
EA
|
1.000
|
$10,000.000
|
$21,500.000
|
$15,000.000
|
$1,100.000
|
$9,251.070
|
|
|
HEADWALL (CH - FW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$13,000.000
|
$17,250.000
|
$15,500.000
|
$5,000.000
|
$13,876.610
|
|
|
HEADWALL (CH - PW - 0) (DIA= 18 IN)
|
EA
|
6.000
|
$12,000.000
|
$18,000.000
|
$14,000.000
|
$8,000.000
|
$11,563.840
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
58.000
|
$1,100.000
|
$1,350.000
|
$1,200.000
|
$1,600.000
|
$1,914.190
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
3.000
|
$3,500.000
|
$1,500.000
|
$2,000.000
|
$3,000.000
|
$1,478.660
|
|
|
REMOV STR (SET)
|
EA
|
9.000
|
$500.000
|
$400.000
|
$450.000
|
$600.000
|
$1,587.060
|
|
|
REMOV STR (PIPE)
|
LF
|
545.000
|
$15.000
|
$9.000
|
$30.000
|
$25.000
|
$35.440
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$531,481.630
|
$356,400.000
|
$481,257.000
|
$471,000.000
|
$95,907.250
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$5,000.000
|
$500.000
|
$4,500.000
|
$6,950.000
|
$3,912.430
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$65.000
|
$20,000.000
|
$8,378.480
|
$13,876.610
|
|
|
TMA (STATIONARY)
|
DAY
|
360.000
|
$100.000
|
$30.000
|
$10.000
|
$30.790
|
$199.480
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$150.000
|
$50.000
|
$100.000
|
$0.010
|
$647.870
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
392.000
|
$65.000
|
$100.000
|
$63.500
|
$63.500
|
$75.740
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
392.000
|
$35.000
|
$25.000
|
$36.000
|
$36.000
|
$46.200
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
224.000
|
$19.000
|
$30.000
|
$40.000
|
$36.350
|
$30.070
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
224.000
|
$4.500
|
$15.000
|
$10.000
|
$18.060
|
$12.750
|
|
|
FRNT END LOADER WORK (ERSN & SEDM CONT)
|
HR
|
32.000
|
$175.000
|
$200.000
|
$150.000
|
$93.760
|
$161.310
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
15,446.000
|
$4.150
|
$5.000
|
$3.100
|
$3.100
|
$3.760
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
15,446.000
|
$1.200
|
$1.000
|
$1.300
|
$1.300
|
$1.560
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
868.000
|
$5.150
|
$10.000
|
$5.950
|
$5.950
|
$7.170
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
868.000
|
$1.400
|
$2.000
|
$1.400
|
$1.400
|
$1.730
|
|
|
CONSTRUCTING DETOURS
|
SY
|
217.000
|
$60.000
|
$80.000
|
$100.000
|
$134.350
|
$98.290
|
|
|
DRIVEWAYS (CONC)
|
SY
|
66.000
|
$100.000
|
$90.000
|
$175.000
|
$122.540
|
$161.890
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,024.000
|
$52.000
|
$35.000
|
$60.000
|
$48.790
|
$90.540
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
36,625.000
|
$0.500
|
$0.300
|
$0.240
|
$0.220
|
$0.280
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
18,093.000
|
$0.500
|
$0.300
|
$0.240
|
$0.500
|
$0.280
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
312.500
|
$28.000
|
$30.000
|
$28.440
|
$28.440
|
$33.820
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,500.000
|
$2,500.000
|
$2,501.000
|
$2,501.000
|
$2,584.520
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
402.000
|
$2.750
|
$9.000
|
$5.000
|
$5.000
|
$3.470
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$215.000
|
$1,500.000
|
$350.000
|
$350.000
|
$271.750
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,400.000
|
$3,525.000
|
$3,525.000
|
$3,525.000
|
$4,024.220
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$320.000
|
$1,475.000
|
$350.000
|
$350.000
|
$381.610
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
400.000
|
$16.000
|
$9.000
|
$9.920
|
$8.500
|
$12.560
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
400.000
|
$2.100
|
$2.000
|
$2.450
|
$2.100
|
$2.240
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
800.000
|
$1.720
|
$2.000
|
$2.570
|
$2.200
|
$2.310
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
2.000
|
$1,600.000
|
$1,250.000
|
$1,284.360
|
$1,100.000
|
$1,175.120
|
|
|
REMOVE GROUND BOX
|
EA
|
2.000
|
$500.000
|
$435.000
|
$437.850
|
$375.000
|
$370.050
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
18.000
|
$24.000
|
$16.000
|
$35.000
|
$75.000
|
$26.310
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
22.000
|
$830.000
|
$850.000
|
$875.000
|
$730.000
|
$844.160
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
2.000
|
$925.000
|
$950.000
|
$985.000
|
$815.000
|
$942.460
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
15.000
|
$930.000
|
$980.000
|
$1,125.000
|
$915.000
|
$1,058.090
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,275.000
|
$1,350.000
|
$1,375.000
|
$1,300.000
|
$1,503.300
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
38.000
|
$85.000
|
$285.000
|
$95.000
|
$127.270
|
$115.640
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
6.000
|
$32.000
|
$225.000
|
$26.000
|
$24.500
|
$28.330
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$35.000
|
$260.000
|
$55.000
|
$30.500
|
$35.270
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
6.000
|
$90.000
|
$215.000
|
$85.000
|
$69.000
|
$79.790
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
1,195.000
|
$1.500
|
$1.000
|
$1.100
|
$1.100
|
$1.270
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
46.000
|
$15.000
|
$50.000
|
$50.000
|
$50.000
|
$57.820
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
17.000
|
$275.000
|
$150.000
|
$150.000
|
$150.000
|
$173.460
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
37,917.000
|
$1.100
|
$0.400
|
$0.380
|
$0.380
|
$0.440
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,936.000
|
$1.300
|
$6.000
|
$1.840
|
$1.250
|
$0.770
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
104.000
|
$8.000
|
$16.000
|
$16.000
|
$16.000
|
$18.500
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
37,992.000
|
$0.900
|
$0.650
|
$0.660
|
$0.660
|
$0.760
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
4,288.000
|
$0.550
|
$1.000
|
$1.100
|
$1.100
|
$1.270
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
8,118.000
|
$1.000
|
$0.850
|
$0.840
|
$0.840
|
$0.970
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
352.000
|
$4.750
|
$7.500
|
$7.500
|
$7.500
|
$8.670
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
12,140.000
|
$0.350
|
$0.350
|
$0.350
|
$0.350
|
$0.400
|
|
|
PRSSR IRRIG PVC PIPE (30")
|
LF
|
66.000
|
$150.000
|
$235.000
|
$225.000
|
$500.000
|
$236.870
|
|
|
PRSSR IRRIG PVC PIPE (12")
|
LF
|
66.000
|
$200.000
|
$120.000
|
$200.000
|
$150.000
|
$100.140
|
|
|
PRSSR IRRIG PVC PIPE (15")
|
LF
|
150.000
|
$250.000
|
$100.000
|
$130.000
|
$90.000
|
$93.500
|
|
|
BONDING COURSE
|
GAL
|
4,656.000
|
$3.500
|
$8.000
|
$4.000
|
$2.870
|
$8.350
|
|
Totals: |
$5,890,397.930
|
$5,167,455.300
|
$5,500,923.960
|
$5,624,083.316
|
$5,625,686.054
|