PREPARING ROW
|
STA
|
14.550
|
$2,000.000
|
$1,000.000
|
$900.000
|
$2,250.000
|
$8,500.000
|
$15,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
94.000
|
$20.000
|
$12.000
|
$36.000
|
$10.000
|
$50.000
|
$10.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
3,892.000
|
$3.970
|
$3.000
|
$12.000
|
$6.000
|
$10.000
|
$12.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,320.000
|
$20.000
|
$6.000
|
$20.000
|
$13.600
|
$20.000
|
$20.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
58.000
|
$40.000
|
$20.000
|
$100.000
|
$25.000
|
$150.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,115.000
|
$20.000
|
$4.000
|
$35.000
|
$18.500
|
$20.000
|
$35.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
6,053.000
|
$1.290
|
$3.000
|
$5.000
|
$6.500
|
$3.000
|
$10.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
2,381.000
|
$0.500
|
$1.000
|
$0.750
|
$0.700
|
$0.650
|
$2.000
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
|
SY
|
2,772.000
|
$0.210
|
$1.000
|
$0.750
|
$0.700
|
$0.650
|
$2.000
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
5,153.000
|
$0.410
|
$1.000
|
$0.750
|
$0.700
|
$0.650
|
$2.000
|
|
|
VEGETATIVE WATERING
|
MG
|
167.500
|
$32.000
|
$30.000
|
$80.000
|
$55.000
|
$95.000
|
$105.000
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY E)
|
SY
|
78.000
|
$1.400
|
$5.000
|
$5.000
|
$5.000
|
$5.000
|
$35.000
|
|
|
PROOF ROLLING
|
HR
|
8.000
|
$115.000
|
$74.000
|
$60.000
|
$100.000
|
$50.000
|
$90.000
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
|
CY
|
1,744.000
|
$40.000
|
$45.000
|
$60.000
|
$45.000
|
$75.000
|
$90.000
|
|
|
REWORK BS MTL (TY A) (6") (ORD COMP)
|
SY
|
2,200.000
|
$6.000
|
$2.000
|
$9.000
|
$5.000
|
$10.000
|
$15.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
90.000
|
$190.000
|
$290.000
|
$430.000
|
$300.000
|
$245.000
|
$450.000
|
|
|
LIME TRT (MIX EXST MATL&NEW BASE(12")
|
SY
|
5,521.000
|
$8.000
|
$2.000
|
$3.500
|
$8.000
|
$6.000
|
$7.000
|
|
|
CEMENT
|
TON
|
64.000
|
$193.000
|
$190.000
|
$270.000
|
$205.000
|
$200.000
|
$285.000
|
|
|
CEMENT TREAT (NEW BASE)(11")
|
SY
|
5,521.000
|
$6.000
|
$2.000
|
$3.500
|
$7.500
|
$6.000
|
$35.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,105.000
|
$7.000
|
$4.000
|
$15.000
|
$8.000
|
$10.000
|
$12.000
|
|
|
ASPH (TIER II)
|
GAL
|
2,486.000
|
$7.000
|
$4.000
|
$12.000
|
$14.000
|
$10.000
|
$15.000
|
|
|
AGGR (TY-D GR-4P)(SAC-B)
|
CY
|
45.000
|
$150.000
|
$146.000
|
$300.000
|
$72.000
|
$750.000
|
$185.000
|
|
|
CEM STABIL BKFL
|
CY
|
138.000
|
$135.000
|
$64.000
|
$190.000
|
$110.000
|
$150.000
|
$130.000
|
|
|
SHEET PILING (PZ - 27)
|
SF
|
3,081.000
|
$110.000
|
$64.000
|
$60.000
|
$80.000
|
$115.000
|
$70.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
340.000
|
$181.000
|
$275.000
|
$370.000
|
$220.000
|
$236.680
|
$450.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
360.000
|
$310.000
|
$344.000
|
$400.000
|
$470.000
|
$290.550
|
$475.000
|
|
|
CL C CONC (ABUT)
|
CY
|
84.300
|
$1,800.000
|
$831.000
|
$1,400.000
|
$1,400.000
|
$2,000.000
|
$1,300.000
|
|
|
REINF CONC SLAB
|
SF
|
3,220.000
|
$21.000
|
$35.000
|
$32.000
|
$26.000
|
$45.000
|
$28.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
1,610.000
|
$17.410
|
$37.000
|
$35.000
|
$23.000
|
$40.000
|
$23.000
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
310.500
|
$200.000
|
$298.000
|
$240.000
|
$185.000
|
$300.000
|
$290.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
416.890
|
$200.000
|
$400.000
|
$225.000
|
$195.000
|
$265.000
|
$250.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
39.000
|
$355.000
|
$648.000
|
$650.000
|
$1,100.000
|
$1,250.000
|
$575.000
|
|
|
RIPRAP (CONC) (CL A )
|
CY
|
22.000
|
$600.000
|
$657.000
|
$630.000
|
$1,400.000
|
$1,250.000
|
$575.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
33.000
|
$514.000
|
$724.000
|
$630.000
|
$1,200.000
|
$1,250.000
|
$750.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
275.900
|
$11.000
|
$28.000
|
$32.000
|
$25.000
|
$50.000
|
$25.000
|
|
|
RAIL (TY SSTR)
|
LF
|
266.000
|
$270.000
|
$172.000
|
$150.000
|
$120.000
|
$200.000
|
$150.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
186.000
|
$120.000
|
$179.000
|
$170.000
|
$150.000
|
$175.000
|
$200.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
172.000
|
$115.000
|
$76.000
|
$110.000
|
$120.000
|
$225.000
|
$120.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
1.000
|
$5,560.000
|
$5,561.000
|
$7,800.000
|
$7,000.000
|
$7,500.000
|
$4,850.000
|
|
|
INL(CMP)(PAZD-CZ)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$6,800.000
|
$4,447.000
|
$4,800.000
|
$7,000.000
|
$7,000.000
|
$3,750.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,500.000
|
$1,617.000
|
$2,200.000
|
$1,600.000
|
$4,000.000
|
$1,850.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$738.000
|
$1,697.000
|
$1,500.000
|
$800.000
|
$1,500.000
|
$750.000
|
|
|
REMOV STR (PIPE)
|
LF
|
154.000
|
$20.000
|
$8.000
|
$20.000
|
$15.000
|
$25.000
|
$25.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$25,000.000
|
$38,633.000
|
$25,000.000
|
$45,000.000
|
$75,000.000
|
$45,850.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$147,337.000
|
$131,650.000
|
$138,000.000
|
$192,000.000
|
$275,000.000
|
$295,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$3,500.000
|
$4,000.000
|
$4,750.000
|
$4,000.000
|
$550.000
|
$2,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
72.000
|
$41.000
|
$65.000
|
$80.000
|
$65.000
|
$65.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
72.000
|
$24.000
|
$20.000
|
$20.000
|
$20.000
|
$20.000
|
$12.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$26.000
|
$21.000
|
$20.000
|
$45.000
|
$43.400
|
$35.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$8.000
|
$10.000
|
$6.000
|
$25.000
|
$26.600
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,528.000
|
$3.300
|
$4.000
|
$4.900
|
$5.000
|
$4.150
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,528.000
|
$1.300
|
$1.000
|
$1.500
|
$2.000
|
$1.250
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
96.000
|
$5.000
|
$10.000
|
$12.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
96.000
|
$1.240
|
$3.000
|
$2.500
|
$3.000
|
$2.500
|
$2.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
505.000
|
$60.000
|
$36.000
|
$55.000
|
$98.000
|
$100.000
|
$65.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
350.000
|
$60.000
|
$35.000
|
$40.000
|
$45.000
|
$45.000
|
$50.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,360.000
|
$2,595.000
|
$800.000
|
$2,200.000
|
$2,170.490
|
$2,300.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,447.000
|
$1,510.000
|
$2,500.000
|
$1,950.000
|
$1,935.490
|
$2,200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,036.000
|
$2.380
|
$3.000
|
$3.000
|
$2.500
|
$3.000
|
$15.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$3,397.000
|
$3,555.000
|
$3,900.000
|
$3,500.000
|
$3,449.210
|
$3,750.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$279.000
|
$275.000
|
$325.000
|
$350.000
|
$349.210
|
$700.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2)
|
EA
|
4.000
|
$20,000.000
|
$15,191.000
|
$18,000.000
|
$15,700.000
|
$15,690.490
|
$27,500.000
|
|
|
WIRE FENCE (TY B)
|
LF
|
165.000
|
$16.000
|
$39.000
|
$45.000
|
$25.000
|
$24.490
|
$20.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
2.000
|
$215.000
|
$280.000
|
$400.000
|
$330.000
|
$325.490
|
$400.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$750.000
|
$755.000
|
$800.000
|
$1,225.000
|
$1,221.490
|
$850.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$94.000
|
$85.000
|
$200.000
|
$325.000
|
$321.490
|
$650.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
8.000
|
$55.000
|
$20.000
|
$7.000
|
$20.000
|
$19.490
|
$95.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$65.000
|
$27.000
|
$15.000
|
$30.000
|
$29.490
|
$35.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
6.000
|
$91.500
|
$59.000
|
$65.000
|
$60.000
|
$59.490
|
$35.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
4.000
|
$75.000
|
$68.000
|
$35.000
|
$80.000
|
$79.490
|
$85.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
485.000
|
$4.480
|
$5.000
|
$8.000
|
$5.000
|
$4.500
|
$4.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
2,910.000
|
$0.310
|
$1.000
|
$1.500
|
$1.000
|
$1.000
|
$4.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
160.000
|
$0.350
|
$3.000
|
$2.250
|
$3.000
|
$3.000
|
$5.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,640.000
|
$0.330
|
$2.000
|
$1.500
|
$1.500
|
$1.500
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
29.000
|
$3.260
|
$10.000
|
$11.500
|
$10.000
|
$10.000
|
$85.000
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
906.000
|
$180.000
|
$140.000
|
$145.000
|
$133.000
|
$200.000
|
$190.000
|
|
|
BONDING COURSE
|
GAL
|
1,105.000
|
$6.000
|
$6.000
|
$15.000
|
$5.000
|
$10.000
|
$13.500
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
5,611.000
|
$2.500
|
$2.000
|
$2.500
|
$4.100
|
$4.000
|
$20.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
56.000
|
$80.000
|
$65.000
|
$50.000
|
$425.000
|
$100.000
|
$280.000
|
|
Totals: |
$2,066,856.820
|
$1,917,663.500
|
$2,174,193.750
|
$2,244,245.350
|
$2,889,271.440
|
$3,151,699.000
|