PREPARING ROW
|
STA
|
7.500
|
$1,000.000
|
$4,500.000
|
$1,350.000
|
$1,875.000
|
$18,500.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
127.000
|
$15.000
|
$20.000
|
$10.500
|
$15.000
|
$10.000
|
|
|
REMOVING STAB BASE & ASPH PAV (9")
|
SY
|
711.000
|
$10.000
|
$10.000
|
$16.000
|
$12.000
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
281.000
|
$10.000
|
$18.000
|
$16.000
|
$27.500
|
$8.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
918.000
|
$6.000
|
$16.000
|
$9.250
|
$10.000
|
$7.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
10.000
|
$12.000
|
$45.000
|
$52.000
|
$36.000
|
$8.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,343.000
|
$10.000
|
$16.500
|
$10.500
|
$22.000
|
$10.000
|
|
|
BLADING
|
STA
|
3.000
|
$170.000
|
$100.000
|
$835.000
|
$305.000
|
$2,500.000
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
100.000
|
$40.000
|
$13.000
|
$20.000
|
$13.000
|
$20.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
1,690.000
|
$0.500
|
$0.500
|
$0.500
|
$0.800
|
$0.300
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
1,462.000
|
$0.500
|
$0.450
|
$0.450
|
$0.800
|
$0.300
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
3,152.000
|
$0.500
|
$0.200
|
$0.210
|
$0.800
|
$0.350
|
|
|
VEGETATIVE WATERING
|
MG
|
51.400
|
$45.000
|
$40.000
|
$38.000
|
$29.000
|
$40.000
|
|
|
FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS)
|
CY
|
1,106.100
|
$26.000
|
$49.000
|
$30.000
|
$32.000
|
$35.000
|
|
|
LIME TRT (NEW BASE)(8")
|
SY
|
1,211.000
|
$5.000
|
$2.730
|
$3.680
|
$6.000
|
$12.000
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
9.000
|
$220.000
|
$185.000
|
$260.000
|
$200.000
|
$180.000
|
|
|
CEMENT
|
TON
|
23.000
|
$160.000
|
$175.000
|
$470.000
|
$200.000
|
$140.000
|
|
|
CEMENT TREAT (NEW BASE) (8")
|
SY
|
837.000
|
$3.500
|
$4.000
|
$5.600
|
$7.000
|
$18.000
|
|
|
CEMENT TREAT (SUBGRADE)(12")
|
SY
|
870.000
|
$3.000
|
$6.000
|
$8.000
|
$10.000
|
$10.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
396.800
|
$10.000
|
$4.500
|
$9.400
|
$8.000
|
$5.000
|
|
|
D-GR HMA TY-D SAC-B PG64-22
|
TON
|
161.800
|
$100.000
|
$105.000
|
$203.000
|
$215.000
|
$165.000
|
|
|
CEM STABIL BKFL
|
CY
|
134.400
|
$60.000
|
$235.000
|
$75.000
|
$130.000
|
$70.000
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
630.000
|
$90.000
|
$120.000
|
$120.000
|
$100.000
|
$180.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
222.000
|
$150.000
|
$370.000
|
$360.000
|
$320.000
|
$450.000
|
|
|
CL C CONC (ABUT)
|
CY
|
99.600
|
$700.000
|
$600.000
|
$870.000
|
$1,200.000
|
$950.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
1.900
|
$450.000
|
$1,950.000
|
$1,200.000
|
$1,000.000
|
$1,550.000
|
|
|
REINF CONC SLAB
|
SF
|
5,660.000
|
$14.000
|
$21.000
|
$20.000
|
$20.000
|
$15.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
834.430
|
$110.000
|
$140.000
|
$159.000
|
$170.000
|
$195.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
81.600
|
$400.000
|
$275.000
|
$570.000
|
$900.000
|
$350.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
228.000
|
$120.000
|
$150.000
|
$300.000
|
$200.000
|
$250.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
29.800
|
$500.000
|
$375.000
|
$400.000
|
$700.000
|
$650.000
|
|
|
RAIL (TY T223)
|
LF
|
268.000
|
$70.000
|
$110.000
|
$122.000
|
$120.000
|
$135.000
|
|
|
RAIL (TY C223)
|
LF
|
96.000
|
$80.000
|
$150.000
|
$185.000
|
$170.000
|
$95.000
|
|
|
RAIL (TY PR1)
|
LF
|
96.000
|
$90.000
|
$100.000
|
$118.000
|
$120.000
|
$130.000
|
|
|
ARMOR JOINT
|
LF
|
44.000
|
$60.000
|
$90.000
|
$145.000
|
$80.000
|
$100.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
335.000
|
$60.000
|
$40.000
|
$63.000
|
$80.000
|
$35.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
4.000
|
$2,500.000
|
$2,400.000
|
$2,500.000
|
$4,000.000
|
$2,750.000
|
|
|
REMOV STR (PIPE)
|
LF
|
25.000
|
$15.000
|
$40.000
|
$27.000
|
$15.000
|
$10.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$15,000.000
|
$20,000.000
|
$8,000.000
|
$30,000.000
|
$95,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$70,000.000
|
$100,000.000
|
$88,000.000
|
$107,000.000
|
$149,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$1,500.000
|
$2,500.000
|
$2,500.000
|
$3,200.000
|
$2,500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
323.600
|
$20.000
|
$20.000
|
$30.000
|
$18.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
323.600
|
$8.000
|
$5.000
|
$10.000
|
$5.000
|
$10.000
|
|
|
FRNT END LOADER WORK (ERSN & SEDM CONT)
|
HR
|
20.000
|
$100.000
|
$95.000
|
$100.000
|
$110.000
|
$150.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,775.000
|
$5.000
|
$3.960
|
$4.000
|
$2.700
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,775.000
|
$1.000
|
$1.500
|
$1.000
|
$0.500
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
80.000
|
$3.000
|
$9.000
|
$7.000
|
$7.000
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
80.000
|
$1.000
|
$2.000
|
$2.000
|
$2.600
|
$1.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
200.000
|
$25.000
|
$20.000
|
$21.000
|
$22.000
|
$32.000
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$2,500.000
|
$750.000
|
$850.000
|
$620.000
|
$1,500.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
6.000
|
$1,000.000
|
$905.000
|
$1,100.000
|
$1,000.000
|
$1,300.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,500.000
|
$1,100.000
|
$1,000.000
|
$1,018.160
|
$1,250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,500.000
|
$2,200.000
|
$2,100.000
|
$2,400.000
|
$1,430.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
3.000
|
$475.000
|
$400.000
|
$950.000
|
$550.000
|
$350.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
2.000
|
$1,000.000
|
$300.000
|
$825.000
|
$660.000
|
$250.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
7.000
|
$150.000
|
$75.000
|
$50.000
|
$75.000
|
$150.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
12.000
|
$75.000
|
$50.000
|
$75.000
|
$80.000
|
$325.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
600.000
|
$10.000
|
$1.200
|
$0.620
|
$0.250
|
$2.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,500.000
|
$2.000
|
$1.600
|
$1.880
|
$1.200
|
$3.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,500.000
|
$2.000
|
$1.600
|
$1.880
|
$1.200
|
$3.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
22.000
|
$15.000
|
$10.400
|
$7.000
|
$5.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,040.000
|
$1.000
|
$0.280
|
$0.100
|
$0.250
|
$0.500
|
|
Totals: |
$780,556.200
|
$1,033,763.030
|
$1,071,219.890
|
$1,199,965.620
|
$1,478,086.150
|