PREPARING ROW
|
STA
|
7.120
|
$1,000.000
|
$1,250.000
|
$1,350.000
|
$18,700.000
|
$825.000
|
$4,100.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
86.000
|
$15.000
|
$26.000
|
$30.000
|
$5.000
|
$25.000
|
$10.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
33.000
|
$15.000
|
$33.000
|
$30.000
|
$5.000
|
$30.000
|
$22.250
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
168.000
|
$10.000
|
$6.000
|
$10.000
|
$2.000
|
$10.000
|
$8.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
87.000
|
$15.000
|
$15.000
|
$15.000
|
$5.000
|
$20.000
|
$12.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
6.000
|
$30.000
|
$160.000
|
$50.000
|
$5.000
|
$30.000
|
$120.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(1"-9")
|
SY
|
971.000
|
$7.000
|
$14.000
|
$8.000
|
$7.350
|
$8.500
|
$16.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,435.000
|
$5.000
|
$10.000
|
$3.000
|
$6.000
|
$21.000
|
$4.270
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
561.000
|
$20.000
|
$18.000
|
$13.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,026.000
|
$20.000
|
$5.000
|
$14.440
|
$12.000
|
$12.500
|
$11.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
2,832.000
|
$2.000
|
$2.000
|
$6.000
|
$3.000
|
$14.000
|
$3.500
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
2,832.000
|
$1.250
|
$1.000
|
$0.500
|
$0.450
|
$0.500
|
$0.750
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
2,832.000
|
$1.250
|
$1.000
|
$0.200
|
$0.350
|
$0.500
|
$0.800
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
2,832.000
|
$0.750
|
$1.000
|
$0.200
|
$0.350
|
$0.500
|
$0.800
|
|
|
VEGETATIVE WATERING
|
MG
|
47.700
|
$50.000
|
$40.000
|
$30.000
|
$40.000
|
$40.000
|
$40.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 4)(FNAL POS)
|
CY
|
547.000
|
$40.000
|
$26.000
|
$35.000
|
$35.000
|
$45.000
|
$62.000
|
|
|
CEMENT
|
TON
|
70.000
|
$180.000
|
$220.000
|
$150.000
|
$165.000
|
$150.000
|
$186.000
|
|
|
CEMENT TREAT (NEW BASE) (8")
|
SY
|
2,642.000
|
$6.000
|
$2.000
|
$4.000
|
$7.500
|
$5.500
|
$4.750
|
|
|
CEMENT TREAT (SUBGRADE)(12")
|
SY
|
2,473.000
|
$5.000
|
$3.000
|
$5.000
|
$6.000
|
$6.500
|
$12.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
459.000
|
$7.500
|
$7.000
|
$3.500
|
$5.000
|
$7.500
|
$7.000
|
|
|
D-GR HMA(SQ) TY-D PG64-22
|
TON
|
183.000
|
$125.000
|
$140.000
|
$110.000
|
$105.000
|
$135.000
|
$250.000
|
|
|
CEM STABIL BKFL
|
CY
|
72.000
|
$120.000
|
$40.000
|
$75.000
|
$55.000
|
$90.000
|
$80.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
593.000
|
$6.000
|
$8.000
|
$1.000
|
$1.000
|
$3.000
|
$1.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
360.000
|
$100.000
|
$250.000
|
$234.470
|
$200.000
|
$235.000
|
$250.000
|
|
|
CL C CONC (ABUT)
|
CY
|
50.200
|
$1,000.000
|
$590.000
|
$1,000.000
|
$1,000.000
|
$975.000
|
$1,000.000
|
|
|
REINF CONC SLAB (BOX BEAM)
|
SF
|
3,761.000
|
$17.500
|
$15.000
|
$17.000
|
$15.000
|
$18.000
|
$13.000
|
|
|
BRIDGE SIDEWALK
|
SF
|
910.000
|
$12.500
|
$12.000
|
$17.000
|
$9.000
|
$22.000
|
$10.000
|
|
|
SHEAR KEY
|
CY
|
22.400
|
$400.000
|
$500.000
|
$475.000
|
$300.000
|
$550.000
|
$170.000
|
|
|
PRESTR CONC BOX BEAM (4B20)
|
LF
|
516.000
|
$190.000
|
$260.000
|
$180.000
|
$200.000
|
$215.000
|
$180.000
|
|
|
PRESTR CONC BOX BEAM (5B20)
|
LF
|
322.500
|
$190.000
|
$260.000
|
$180.000
|
$220.000
|
$220.000
|
$180.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
186.000
|
$400.000
|
$370.000
|
$425.000
|
$325.000
|
$600.000
|
$750.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
8.000
|
$500.000
|
$490.000
|
$500.000
|
$350.000
|
$550.000
|
$750.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
308.000
|
$20.000
|
$21.000
|
$21.000
|
$13.780
|
$21.000
|
$14.000
|
|
|
RAIL (TY C221)
|
LF
|
220.000
|
$150.000
|
$113.000
|
$125.000
|
$125.000
|
$202.000
|
$200.000
|
|
|
CONC BOX CULV (8 FT X 8 FT)
|
LF
|
198.000
|
$810.000
|
$700.000
|
$750.000
|
$605.000
|
$860.000
|
$650.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
472.000
|
$70.000
|
$50.000
|
$65.000
|
$65.000
|
$60.000
|
$70.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
179.000
|
$105.000
|
$70.000
|
$72.000
|
$70.000
|
$80.000
|
$80.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
1.000
|
$6,000.000
|
$3,120.000
|
$2,800.000
|
$2,650.000
|
$4,400.000
|
$4,000.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
1.000
|
$5,000.000
|
$2,921.000
|
$3,000.000
|
$2,700.000
|
$4,100.000
|
$4,000.000
|
|
|
INLET (COMPL)(PCU)(3FT)(BOTH)
|
EA
|
3.000
|
$4,000.000
|
$4,260.000
|
$3,200.000
|
$3,250.000
|
$5,500.000
|
$6,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
6.000
|
$2,500.000
|
$2,670.000
|
$3,800.000
|
$2,600.000
|
$3,700.000
|
$4,400.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
4.000
|
$3,800.000
|
$4,030.000
|
$3,500.000
|
$3,650.000
|
$5,300.000
|
$5,500.000
|
|
|
WINGWALL (SW - 0) (HW=11 FT)
|
EA
|
2.000
|
$38,000.000
|
$20,250.000
|
$25,000.000
|
$10,500.000
|
$21,500.000
|
$60,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$1,500.000
|
$2,020.000
|
$2,500.000
|
$1,500.000
|
$1,500.000
|
$4,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
137.000
|
$10.000
|
$8.000
|
$10.000
|
$10.000
|
$15.000
|
$20.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$22,500.000
|
$25,000.000
|
$30,000.000
|
$64,000.000
|
$11,000.000
|
$16,000.000
|
|
|
REMOVE STR (BOLLARD)
|
EA
|
2.000
|
$150.000
|
$238.000
|
$500.000
|
$150.000
|
$400.000
|
$30.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$120,000.000
|
$64,385.000
|
$150,000.000
|
$130,000.000
|
$96,000.000
|
$105,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$4,000.000
|
$2,000.000
|
$2,500.000
|
$1,450.000
|
$1,000.000
|
$1,600.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
52.000
|
$55.000
|
$77.000
|
$45.000
|
$35.000
|
$40.000
|
$65.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
52.000
|
$55.000
|
$114.000
|
$45.000
|
$35.000
|
$40.000
|
$65.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
52.000
|
$13.000
|
$47.000
|
$10.000
|
$5.000
|
$20.000
|
$20.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
52.000
|
$13.000
|
$47.000
|
$10.000
|
$5.000
|
$20.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
166.000
|
$30.000
|
$25.000
|
$25.000
|
$30.000
|
$25.000
|
$41.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
166.000
|
$12.000
|
$12.000
|
$9.980
|
$10.000
|
$10.000
|
$24.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,067.000
|
$5.000
|
$3.000
|
$6.000
|
$3.000
|
$4.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,067.000
|
$2.000
|
$1.000
|
$2.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
386.000
|
$5.000
|
$5.000
|
$6.000
|
$5.750
|
$6.000
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
386.000
|
$2.000
|
$2.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
CONC CURB & GUTTER (VALLEY GUTTER)
|
LF
|
274.000
|
$25.000
|
$37.000
|
$35.000
|
$17.000
|
$65.000
|
$28.000
|
|
|
CONC. CURB TY A (BARRIER)
|
LF
|
661.000
|
$30.000
|
$19.000
|
$24.000
|
$18.000
|
$15.000
|
$26.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
16.000
|
$80.000
|
$94.000
|
$80.000
|
$45.000
|
$70.000
|
$85.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
276.000
|
$35.000
|
$29.000
|
$26.000
|
$40.000
|
$32.000
|
$78.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
104.000
|
$50.000
|
$55.000
|
$50.000
|
$40.000
|
$36.000
|
$56.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
2.000
|
$1,600.000
|
$1,700.000
|
$1,500.000
|
$1,750.000
|
$1,100.000
|
$1,210.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
11.000
|
$2,000.000
|
$1,615.000
|
$1,500.000
|
$1,350.000
|
$1,100.000
|
$1,310.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
1.000
|
$2,000.000
|
$1,692.000
|
$1,500.000
|
$1,950.000
|
$1,100.000
|
$1,460.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
4.000
|
$950.000
|
$1,780.000
|
$2,500.000
|
$1,550.000
|
$1,250.000
|
$1,070.000
|
|
|
SHORT RADIUS
|
LF
|
100.000
|
$30.000
|
$52.000
|
$55.000
|
$35.000
|
$37.000
|
$35.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$760.000
|
$1,216.000
|
$1,500.000
|
$1,290.000
|
$900.000
|
$800.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
100.000
|
$5.000
|
$8.000
|
$10.000
|
$5.000
|
$5.000
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$100.000
|
$315.000
|
$1,000.000
|
$275.000
|
$150.000
|
$180.000
|
|
|
CHAIN LINK FENCE(INSTALL)(6 )(BARB TOP)
|
LF
|
40.000
|
$50.000
|
$25.000
|
$45.000
|
$20.000
|
$15.000
|
$37.000
|
|
|
REMOVE AND INSTALL EXISTING GATE
|
EA
|
1.000
|
$2,500.000
|
$520.000
|
$2,000.000
|
$500.000
|
$250.000
|
$1,200.000
|
|
|
MAILBOX INSTALL-S (TIM-POST) TY 5
|
EA
|
1.000
|
$150.000
|
$281.000
|
$575.000
|
$300.000
|
$500.000
|
$265.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
6.000
|
$500.000
|
$438.000
|
$800.000
|
$650.000
|
$800.000
|
$620.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$130.000
|
$142.000
|
$100.000
|
$100.000
|
$50.000
|
$85.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
10.000
|
$70.000
|
$152.000
|
$69.530
|
$100.000
|
$75.000
|
$50.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
13.000
|
$65.000
|
$156.000
|
$75.090
|
$100.000
|
$75.000
|
$50.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
260.000
|
$1.000
|
$1.000
|
$1.250
|
$1.000
|
$0.880
|
$0.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,424.000
|
$2.000
|
$1.000
|
$2.250
|
$4.000
|
$1.050
|
$1.600
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,424.000
|
$2.000
|
$1.000
|
$2.250
|
$4.000
|
$1.050
|
$1.600
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
20.000
|
$20.000
|
$15.000
|
$10.000
|
$50.000
|
$11.000
|
$7.000
|
|
|
BIRD EXCLUSION METHOD
|
SF
|
5,784.000
|
$2.000
|
$7.000
|
$2.500
|
$3.000
|
$1.000
|
$3.000
|
|
Totals: |
$1,368,414.000
|
$1,276,034.000
|
$1,358,484.090
|
$1,392,133.390
|
$1,398,930.700
|
$1,479,800.700
|