Show Job Controls
Bid Cobra

HIDALGO 5 MILE LINE (0921-02-526)

Items: 51

County: HIDALGO
Length: 0.0000 MILES (0.2752 MILES)
Highway: 5 MILE LINE
District: PHARR
Control Number: 0921-02-526
DBE Goal: 0.0%
Project: STP 2025(298)HESG
Guaranty: $5,000.00
Time: 109 WORKING DAYS
Engineer's Estimate: $230,687.93
Date: 09/02/2026 1:00 PM CDT (17 days ago)
Contract Number: 9263021
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00206513
Contract Type: FEDERAL WAIVED
Project Description: REPLACE OVERHEAD FLASHING BEACON W/TRAFFIC SIGNAL
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$230,687.93
Over/Under Est: -16.14% -$37,232.42
$203,137.50
Over/Under Est: -11.94% -$27,550.43
Amt Left: 5% $9,681.99
Over/Under Est: -8.91% -$20,547.18
Amt Left: 8.62% $16,685.24
Delta: -3.45% -$7,003.25
Over/Under Est: -6.53% -$15,071.58
Amt Left: 11.46% $22,160.84
Delta: -2.61% -$5,475.60

Bid Items & Bid Tabulations

51 Total 0 of 51
HIDALGO  |  5 MILE LINE  |  PHARR  |  0921-02-526  |  09/02/2026 1:00 PM CDT  |  $230,687.93  |  STP 2025(298)HESG  |  HAZARD ELIM & SAFETY  |  109 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
THE LEVY COMPANY, LLC
TRAF-TEX, INC.
VACA UNDERGROUND UTILITIES INC
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., LLC
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 30.000 $415.000 $343.460 $517.000 $300.000 $295.000
MOBILIZATION
LS 1.000 $20,456.220 $17,506.940 $8,482.000 $20,000.000 $29,500.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $6,000.000 $1,554.660 $1,014.000 $2,300.000 $2,500.000
TMA (STATIONARY)
DAY 25.000 $306.740 $60.760 $237.000 $175.000 $100.000
TMA (MOBILE OPERATION)
DAY 10.000 $150.000 $60.760 $744.000 $60.000 $100.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 400.000 $5.000 $5.790 $4.800 $1.000 $8.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 400.000 $2.000 $2.360 $1.350 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 200.000 $5.000 $5.800 $10.850 $1.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $1.300 $2.360 $4.450 $1.000 $2.500
CONDT (PVC) (SCH 80) (2")
LF 250.000 $20.000 $21.920 $18.200 $15.000 $12.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 150.000 $28.000 $33.990 $35.550 $15.000 $28.000
CONDT (PVC) (SCH 80) (4")
LF 15.000 $25.500 $39.620 $31.100 $35.000 $35.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 95.000 $35.730 $35.140 $54.200 $25.000 $45.000
ELEC CONDR (NO.8) BARE
LF 410.000 $1.800 $1.810 $1.750 $2.350 $2.000
ELEC CONDR (NO.6) BARE
LF 15.000 $1.260 $2.660 $2.100 $2.750 $2.500
ELEC CONDR (NO.6) INSULATED
LF 30.000 $2.900 $2.940 $2.650 $3.250 $2.650
TRAY CABLE (4 CONDR) (14 AWG)
LF 280.000 $2.500 $3.240 $3.650 $4.000 $3.000
GROUND BOX TY A (122311)W/APRON
EA 4.000 $1,410.000 $1,362.240 $1,122.000 $1,500.000 $995.000
GROUND BOX TY D (162922)W/APRON
EA 4.000 $2,000.000 $1,678.240 $1,139.000 $1,500.000 $1,950.000
ZINC-COAT STL WIRE STRAND (3/8")
LF 700.000 $2.500 $13.260 $2.750 $4.000 $2.500
RELOCATE ELECTRICAL SERVICES
EA 1.000 $3,667.000 $657.790 $2,552.000 $2,500.000 $1,850.000
ALUMINUM SIGNS (TY A)
SF 89.000 $30.000 $33.950 $73.000 $40.000 $45.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 8.000 $850.000 $1,259.320 $929.000 $900.000 $1,325.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $1,100.000 $1,259.320 $977.000 $830.000 $1,485.000
REMOVE SM RD SN SUP&AM
EA 7.000 $350.000 $331.400 $128.000 $160.000 $375.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 430.000 $1.020 $5.040 $4.450 $10.000 $3.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 84.000 $7.980 $15.640 $13.350 $11.000 $13.500
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 100.000 $0.500 $3.180 $2.250 $9.000 $3.500
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 720.000 $0.820 $3.180 $2.250 $9.000 $3.500
PREFAB PM TY C (W)(ARROW)
EA 7.000 $208.360 $371.170 $250.000 $250.000 $300.000
PREFAB PM TY C (W)(WORD)
EA 7.000 $240.770 $371.170 $322.000 $250.000 $300.000
REFL PAV MRKR TY I-C
EA 25.000 $6.220 $8.480 $6.700 $6.000 $8.000
REFL PAV MRKR TY II-A-A
EA 45.000 $8.100 $8.480 $6.700 $6.000 $8.000
ELIM EXT PM & MRKS (4")
LF 600.000 $0.530 $1.330 $2.250 $1.000 $1.000
ELIM EXT PM & MRKS (24")
LF 50.000 $3.050 $7.950 $13.350 $1.000 $7.500
ELIM EXT PM & MRKS (ARROW)
EA 6.000 $30.000 $106.050 $133.350 $75.000 $120.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $33,000.000 $28,641.640 $38,322.000 $38,000.000 $32,500.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $4,500.000 $746.560 $1,276.000 $4,000.000 $3,150.000
VEH SIG SEC (12")LED(GRN)
EA 6.000 $302.000 $350.830 $288.000 $350.000 $365.000
VEH SIG SEC (12")LED(GRN ARW)
EA 2.000 $302.000 $350.840 $288.000 $350.000 $365.000
VEH SIG SEC (12")LED(YEL)
EA 6.000 $302.000 $350.830 $288.000 $350.000 $365.000
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $302.000 $350.830 $288.000 $350.000 $365.000
VEH SIG SEC (12")LED(RED)
EA 6.000 $302.000 $350.830 $288.000 $350.000 $365.000
VEH SIG SEC (12")LED(RED ARW)
EA 2.000 $302.000 $350.840 $288.000 $350.000 $365.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 6.000 $225.000 $148.690 $179.000 $165.000 $120.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 2.000 $245.000 $179.150 $207.000 $250.000 $195.000
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 1,440.000 $3.350 $3.410 $3.700 $4.000 $2.600
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 365.000 $3.270 $4.590 $4.700 $5.000 $3.150
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
LF 2,102.000 $2.190 $1.530 $2.000 $2.250 $1.300
INS TRF SIG PL AM (S)STR(TY B)LUM
EA 2.000 $8,950.000 $8,970.190 $9,201.000 $10,100.000 $11,550.000
VEH LP DETECT (SAWCUT)
LF 945.000 $13.840 $10.800 $16.000 $15.000 $12.000
Totals: $230,687.930 $193,455.510 $203,137.500 $210,140.750 $215,616.350
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $15,000.00