HIDALGO FM 1015 (1228-03-052)

Items: 71

County: HIDALGO
Length: 0.0000 MILES (0.8733 MILES)
Highway: FM 1015
District: PHARR
Control Number: 1228-03-052
DBE Goal: 0.0%
Project: STP 2B26(056)VRU
Guaranty: $13,000.00
Time: 120 WORKING DAYS
Engineer's Estimate: $648,520.91
Date: 08/06/2026 1:00 PM CDT (6 weeks ago) Changed
Contract Number: 8263042
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00192928
Contract Type: FEDERAL
Project Description: INSTALL SIDEWALKS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 2 files available
Bidders (4)
E
Engineer's Estimate
$648,520.91
$662,208.95
Over/Under Est: 2.11% $13,688.04
Over/Under Est: 5.04% $32,690.39
Amt Left: 2.87% $19,002.35
Over/Under Est: 8.68% $56,299.59
Amt Left: 6.43% $42,611.55
Delta: -3.47% -$23,609.20
Over/Under Est: 29.78% $193,112.25
Amt Left: 27.09% $179,424.21
Delta: -19.41% -$136,812.66

Bid Items & Bid Tabulations

71 Total 0 of 71
HIDALGO  |  FM 1015  |  PHARR  |  1228-03-052  |  08/06/2026 1:00 PM CDT  |  $648,520.91  |  STP 2B26(056)VRU  |  HAZARD ELIM & SAFETY  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ARTILLERY L.L.C.
TEXAS CORDIA CONSTRUCTION, LLC
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., LLC
LUCANIA CONTRACTORS LLC
PREPARING ROW
STA 11.000 $2,700.000 $1,000.000 $2,020.000 $1,350.000 $4,000.000
EXCAV (ROADWAY)
CY 860.000 $20.000 $15.000 $10.000 $23.000 $90.000
EMBANK (FNL)(OC)(TY C)
CY 50.000 $40.000 $20.000 $50.000 $18.000 $50.000
FURN & PLACE TOPSOIL (4")
SY 4,428.000 $10.000 $8.000 $14.000 $12.000 $15.000
DRILL SEED (PERM_URBAN_CLAY)
SY 4,428.000 $1.000 $2.000 $0.500 $1.500 $0.150
VEGETATIVE WATERING
TGL 143.590 $20.000 $30.000 $20.000 $70.000 $15.000
MOBILIZATION
LS 1.000 $54,592.810 $75,000.000 $60,000.000 $97,950.000 $125,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $6,000.000 $5,000.000 $1,000.000 $4,500.000 $1,545.000
TMA (STATIONARY)
DAY 120.000 $215.000 $400.000 $50.000 $225.000 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 668.000 $8.000 $10.000 $4.000 $8.000 $7.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 668.000 $2.000 $2.000 $1.000 $1.800 $2.000
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 144.000 $5.000 $25.000 $6.000 $12.000 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 144.000 $1.300 $10.000 $1.000 $1.800 $2.000
DRIVEWAYS (CONC)
SY 54.000 $110.000 $108.000 $300.000 $125.000 $135.000
CONC SIDEWALKS (4")
SY 1,834.000 $80.000 $72.000 $125.000 $100.000 $100.000
CURB RAMPS (TY 1)
EA 8.000 $3,000.000 $3,000.000 $4,300.000 $3,250.000 $3,600.000
CURB RAMPS (TY 7)
EA 8.000 $3,000.000 $3,000.000 $4,700.000 $3,250.000 $3,600.000
CONDT (PVC) (SCH 40) (2")
LF 240.000 $10.000 $38.000 $20.000 $15.000 $42.500
CONDT (PVC) (SCH 40) (4")
LF 125.000 $10.000 $25.000 $25.000 $25.000 $30.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 250.000 $22.000 $45.000 $32.000 $35.000 $52.500
ELEC CONDR (NO.8) BARE
LF 645.000 $2.250 $3.000 $2.000 $2.000 $2.500
TRAY CABLE (4 CONDR) (12 AWG)
LF 720.000 $4.500 $4.000 $3.000 $2.000 $4.060
GROUND BOX TY A (122311)W/APRON
EA 3.000 $1,100.000 $2,000.000 $1,050.000 $990.000 $1,875.000
ZINC-COAT STL WIRE STRAND (3/16")
LF 580.000 $5.000 $3.500 $3.000 $1.600 $3.500
ZINC-COAT STL WIRE STRAND (5/16")
LF 1,480.000 $6.000 $4.000 $3.000 $1.800 $4.130
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $800.000 $1,000.000 $2,740.000 $450.000 $350.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 220.000 $1.000 $4.000 $4.000 $3.200 $4.380
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 402.000 $15.000 $17.000 $16.000 $12.000 $20.000
PAVEMENT SLER 6"
LF 17,903.000 $0.700 $0.500 $0.500 $0.850 $0.530
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 2,410.000 $0.750 $2.500 $2.000 $1.200 $2.500
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 9,171.000 $0.750 $1.250 $1.000 $0.950 $1.380
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 1,820.000 $0.750 $2.250 $2.000 $1.200 $2.500
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 12,262.000 $0.750 $1.250 $1.000 $1.000 $1.380
PREFAB PM TY C (W)(ARROW)
EA 4.000 $275.000 $250.000 $200.000 $320.000 $250.000
PREFAB PM TY C (W)(WORD)
EA 2.000 $275.000 $325.000 $300.000 $320.000 $375.000
PREFAB PM TY C (Y)(12")(SLD)
LF 620.000 $12.000 $7.000 $7.000 $7.500 $8.130
REFL PAV MRKR TY I-C
EA 32.000 $4.500 $30.000 $25.000 $6.500 $31.250
REFL PAV MRKR TY II-A-A
EA 280.000 $4.500 $13.500 $13.000 $5.500 $15.630
ELIM EXT PM & MRKS (4")
LF 7,760.000 $0.250 $0.500 $0.250 $0.850 $0.310
ELIM EXT PM & MRKS (8")
LF 220.000 $0.500 $1.500 $1.000 $1.600 $1.250
ELIM EXT PM & MRKS (12")
LF 1,064.000 $1.300 $2.000 $2.000 $2.800 $1.880
ELIM EXT PM & MRKS (24")
LF 152.000 $2.600 $6.000 $5.000 $7.500 $6.250
ELIM EXT PM & MRKS (ARROW)
EA 4.000 $60.000 $100.000 $75.000 $100.000 $93.750
ELIM EXT PM & MRKS (WORD)
EA 2.000 $60.000 $100.000 $75.000 $100.000 $93.750
PAV SURF PREP FOR MRK (6")
LF 7,760.000 $0.150 $0.100 $0.050 $0.250 $0.060
PAV SURF PREP FOR MRK (8")
LF 220.000 $0.150 $0.150 $0.100 $0.300 $0.130
PAV SURF PREP FOR MRK (12")
LF 620.000 $0.300 $0.250 $0.250 $7.000 $0.250
PAV SURF PREP FOR MRK (24")
LF 402.000 $0.800 $0.750 $0.500 $1.200 $0.630
PAV SURF PREP FOR MRK (ARROW)
EA 4.000 $15.000 $18.000 $15.000 $6.500 $18.750
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $20.000 $18.000 $15.000 $7.000 $18.750
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $20,000.000 $10,000.000 $21,500.000 $3,500.000 $8,750.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $2,800.000 $4,500.000 $3,500.000 $2,500.000 $4,875.000
VEH SIG SEC (12")LED(GRN)
EA 8.000 $300.000 $400.000 $225.000 $315.000 $437.500
VEH SIG SEC (12")LED(GRN ARW)
EA 2.000 $300.000 $400.000 $225.000 $315.000 $437.500
VEH SIG SEC (12")LED(YEL)
EA 8.000 $300.000 $400.000 $225.000 $315.000 $437.500
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $300.000 $400.000 $225.000 $315.000 $437.500
VEH SIG SEC (12")LED(RED)
EA 8.000 $300.000 $400.000 $225.000 $315.000 $437.500
VEH SIG SEC (12")LED(RED ARW)
EA 2.000 $300.000 $400.000 $225.000 $315.000 $437.500
PED SIG SEC (LED)(COUNTDOWN)
EA 8.000 $700.000 $900.000 $500.000 $525.000 $1,050.000
BACKPLATE W/REFL BRDR(4 SEC)
EA 2.000 $250.000 $200.000 $130.000 $175.000 $137.500
BACKPLATE W/REFL BRDR(3 SEC)
EA 8.000 $200.000 $175.000 $105.000 $120.000 $200.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 1,310.000 $2.200 $2.500 $1.000 $1.200 $2.500
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 2,190.000 $3.150 $4.000 $2.000 $1.600 $4.380
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 430.000 $4.100 $5.000 $3.000 $2.000 $5.940
PED DETECT PUSH BUTTON (APS)
EA 8.000 $830.000 $1,000.000 $850.000 $895.000 $1,212.500
PED DETECTOR CONTROLLER UNIT
EA 1.000 $3,600.000 $4,000.000 $4,500.000 $3,800.000 $4,500.000
REMOVAL OF CONDUIT
LF 1,100.000 $3.000 $5.000 $1.000 $2.000 $5.310
REMOVAL OF GROUND BOXES
EA 9.000 $220.000 $90.000 $100.000 $325.000 $1,087.500
VIDEO IMAGING AND RADAR DETECTOR
EA 4.000 $11,000.000 $7,500.000 $6,100.000 $7,850.000 $8,875.000
VIDEO IMAGING AND RADAR SET-UP SYS
EA 1.000 $1,000.000 $1,200.000 $1,000.000 $450.000 $1,375.000
VID IMAGE AND RADAR DET PROCESSOR SYS
EA 1.000 $15,000.000 $10,000.000 $7,900.000 $13,500.000 $11,500.000
Totals: $648,520.910 $662,208.950 $681,211.300 $704,820.500 $841,633.160
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $20,000.00