|
|
PREPARING ROW
|
STA
|
335.000
|
$800.000
|
$75.000
|
$1,500.000
|
$170.000
|
$158.000
|
$525.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
40.000
|
$11.000
|
$15.000
|
$10.000
|
$10.500
|
$10.750
|
$80.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
681.000
|
$8.000
|
$10.000
|
$15.000
|
$4.000
|
$11.250
|
$19.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
20.000
|
$3.000
|
$15.000
|
$10.000
|
$12.000
|
$4.550
|
$60.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(10")
|
CY
|
14,775.000
|
$2.500
|
$6.300
|
$5.000
|
$5.200
|
$6.000
|
$17.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,195.000
|
$4.000
|
$3.000
|
$10.000
|
$5.400
|
$2.650
|
$18.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
5,648.000
|
$5.000
|
$3.000
|
$2.000
|
$6.000
|
$5.900
|
$15.000
|
|
|
BACKFILL (TY B)
|
STA
|
335.000
|
$125.000
|
$50.000
|
$150.000
|
$100.000
|
$114.000
|
$310.000
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
50.000
|
$20.000
|
$30.000
|
$20.000
|
$30.000
|
$32.500
|
$60.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
AC
|
32.000
|
$1,300.000
|
$1,240.000
|
$1,250.000
|
$1,650.000
|
$1,440.000
|
$1,240.000
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
AC
|
32.000
|
$850.000
|
$785.000
|
$800.000
|
$1,520.000
|
$934.000
|
$785.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,000.000
|
$8.000
|
$15.000
|
$38.000
|
$40.000
|
$22.750
|
$43.000
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
1,338.000
|
$7.000
|
$1.000
|
$1.000
|
$27.000
|
$22.750
|
$40.000
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
|
CY
|
29,455.000
|
$23.000
|
$19.450
|
$16.000
|
$21.000
|
$20.250
|
$38.000
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
55,225.000
|
$2.000
|
$2.000
|
$2.000
|
$1.100
|
$1.900
|
$3.000
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
1,641.000
|
$160.000
|
$132.000
|
$125.000
|
$210.000
|
$157.000
|
$203.000
|
|
|
CEMENT
|
TON
|
994.000
|
$160.000
|
$147.000
|
$145.000
|
$180.000
|
$179.000
|
$201.000
|
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
88,738.000
|
$1.500
|
$1.000
|
$1.250
|
$3.300
|
$1.250
|
$2.650
|
|
|
CEMENT TREAT (NEW BASE) (10")
|
SY
|
51,645.000
|
$1.500
|
$1.250
|
$1.500
|
$5.600
|
$1.900
|
$3.650
|
|
|
SALV, HAUL & STKPL RCL APH PV (1 1/2")
|
SY
|
137,789.000
|
$1.400
|
$1.000
|
$1.000
|
$0.800
|
$1.400
|
$2.500
|
|
|
PRIME COAT (MC-30)
|
GAL
|
27,850.000
|
$3.250
|
$3.000
|
$3.000
|
$2.500
|
$3.550
|
$4.500
|
|
|
ASPH (SPG 73-19)
|
GAL
|
41,774.000
|
$3.000
|
$2.750
|
$4.000
|
$3.200
|
$2.900
|
$3.500
|
|
|
AGGR (TY-D GR-4P)(SAC-B)
|
CY
|
1,160.000
|
$35.000
|
$50.000
|
$35.000
|
$120.000
|
$134.000
|
$125.000
|
|
|
SUPERPAVE MIXTURES SP-D SAC-A PG76-22
|
TON
|
23,432.000
|
$77.000
|
$67.750
|
$59.000
|
$79.000
|
$86.000
|
$87.500
|
|
|
PAV JT UNDERSEAL (24")
|
LF
|
120.000
|
$30.000
|
$20.000
|
$40.000
|
$10.000
|
$45.500
|
$75.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
40.000
|
$400.000
|
$350.000
|
$400.000
|
$380.000
|
$342.000
|
$420.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
44.000
|
$375.000
|
$350.000
|
$400.000
|
$390.000
|
$419.000
|
$490.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
120.000
|
$40.000
|
$15.000
|
$50.000
|
$85.000
|
$78.500
|
$65.000
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - A)
|
LF
|
125.000
|
$115.000
|
$90.000
|
$425.000
|
$120.000
|
$115.000
|
$50.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$392,000.000
|
$375,000.000
|
$439,000.000
|
$65,000.000
|
$240,000.000
|
$769,695.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$3,500.000
|
$3,000.000
|
$3,000.000
|
$5,500.000
|
$6,000.000
|
$20,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
100.000
|
$35.000
|
$35.000
|
$55.000
|
$75.000
|
$18.500
|
$65.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
100.000
|
$10.000
|
$10.000
|
$24.000
|
$20.000
|
$10.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
936.000
|
$11.000
|
$10.000
|
$22.000
|
$18.000
|
$18.750
|
$27.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
936.000
|
$6.500
|
$3.000
|
$13.000
|
$9.000
|
$7.900
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,750.000
|
$2.000
|
$2.000
|
$2.500
|
$2.000
|
$1.700
|
$3.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,750.000
|
$1.000
|
$0.500
|
$1.000
|
$1.000
|
$1.000
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,614.000
|
$3.000
|
$4.000
|
$5.500
|
$3.000
|
$2.350
|
$5.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,614.000
|
$0.750
|
$0.500
|
$1.000
|
$1.000
|
$1.000
|
$0.500
|
|
|
CONC CURB (MOUNTABLE)
|
LF
|
20.000
|
$22.000
|
$50.000
|
$30.000
|
$30.000
|
$13.750
|
$80.600
|
|
|
DRIVEWAYS (CONC)
|
SY
|
732.000
|
$50.000
|
$41.000
|
$65.000
|
$50.000
|
$47.750
|
$60.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
7,895.000
|
$24.000
|
$23.000
|
$20.000
|
$8.000
|
$22.500
|
$30.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
238.000
|
$20.000
|
$26.500
|
$27.000
|
$30.500
|
$29.250
|
$26.500
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
EA
|
4.000
|
$1,400.000
|
$1,480.000
|
$1,500.000
|
$1,750.000
|
$1,630.000
|
$1,480.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
238.000
|
$2.000
|
$2.000
|
$2.000
|
$3.500
|
$2.000
|
$2.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$300.000
|
$190.000
|
$190.000
|
$1,630.000
|
$228.000
|
$190.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,200.000
|
$2,380.000
|
$2,400.000
|
$1,870.000
|
$2,680.000
|
$2,380.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$176.000
|
$275.000
|
$285.000
|
$590.000
|
$167.000
|
$275.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
22.000
|
$300.000
|
$235.000
|
$240.000
|
$230.000
|
$244.000
|
$235.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
1.000
|
$300.000
|
$275.000
|
$290.000
|
$250.000
|
$278.000
|
$275.000
|
|
|
CONDT (PVC) (SCH 40) (1")
|
LF
|
100.000
|
$18.000
|
$26.000
|
$21.000
|
$10.000
|
$23.250
|
$26.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
17.500
|
$25.000
|
$19.250
|
$20.000
|
$30.000
|
$21.250
|
$19.250
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
3.000
|
$490.000
|
$545.000
|
$550.000
|
$540.000
|
$606.000
|
$545.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
3.000
|
$650.000
|
$625.000
|
$650.000
|
$615.000
|
$690.000
|
$625.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
41.000
|
$350.000
|
$590.000
|
$600.000
|
$455.000
|
$195.000
|
$590.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
22.000
|
$60.000
|
$50.000
|
$50.000
|
$90.000
|
$55.000
|
$50.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
30.000
|
$17.000
|
$10.000
|
$10.000
|
$25.000
|
$11.500
|
$10.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
8.000
|
$30.000
|
$32.000
|
$32.000
|
$31.500
|
$35.250
|
$32.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
65,245.000
|
$0.300
|
$0.350
|
$0.480
|
$0.500
|
$0.350
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
66,884.000
|
$0.350
|
$0.350
|
$0.480
|
$0.500
|
$0.350
|
$0.350
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
8,326.000
|
$0.500
|
$0.420
|
$1.000
|
$0.650
|
$1.800
|
$1.000
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
300.000
|
$1.000
|
$0.750
|
$2.000
|
$4.000
|
$2.400
|
$0.750
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
439.000
|
$2.400
|
$1.500
|
$4.000
|
$2.000
|
$5.300
|
$1.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
65,245.000
|
$0.300
|
$0.320
|
$0.400
|
$0.400
|
$0.350
|
$0.320
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
8,342.000
|
$0.300
|
$0.320
|
$0.400
|
$0.400
|
$0.360
|
$0.320
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
14,718.000
|
$0.300
|
$0.320
|
$0.400
|
$0.500
|
$0.380
|
$0.320
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
605.000
|
$2.900
|
$3.500
|
$4.600
|
$4.100
|
$3.100
|
$3.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
32,624.000
|
$0.450
|
$0.300
|
$0.640
|
$0.500
|
$0.700
|
$0.300
|
|
|
VEH LP DETECT (SAWCUT)
|
LF
|
410.000
|
$9.000
|
$16.500
|
$16.000
|
$30.000
|
$16.500
|
$16.500
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
122,972.000
|
$1.750
|
$1.000
|
$1.240
|
$1.050
|
$1.100
|
$3.120
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,800.000
|
$50.000
|
$1,500.000
|
$14,500.000
|
$4,500.000
|
$18,000.000
|
|
|
GROUND BOX W/ APRON (ADJUST)
|
EA
|
7.000
|
$325.000
|
$1,400.000
|
$600.000
|
$500.000
|
$606.000
|
$1,400.000
|
|
Totals: |
$5,288,076.400
|
$4,427,442.745
|
$4,919,514.560
|
$5,192,260.200
|
$5,237,717.685
|
$7,875,306.415
|