|
|
PREPARING ROW
|
STA
|
2.000
|
$2,000.000
|
$10,965.240
|
$5,000.000
|
$5,000.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
520.000
|
$75.000
|
$57.170
|
$70.000
|
$50.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
460.000
|
$250.000
|
$270.000
|
$214.000
|
$250.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
2,500.000
|
$65.000
|
$72.500
|
$82.000
|
$75.000
|
|
|
PLANE ASPH CONC PAV (4")
|
SY
|
31,940.000
|
$7.380
|
$2.600
|
$3.600
|
$5.000
|
|
|
PLANE ASPH CONC PAV (1 1/2" TO 3 1/2")
|
SY
|
173,743.000
|
$4.000
|
$2.070
|
$2.300
|
$3.000
|
|
|
CEM STABIL BKFL
|
CY
|
124.000
|
$188.380
|
$200.000
|
$565.000
|
$350.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
750.000
|
$42.000
|
$35.000
|
$53.000
|
$50.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
40.000
|
$400.000
|
$900.000
|
$1,950.000
|
$4,000.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
87.000
|
$162.200
|
$250.000
|
$160.000
|
$200.000
|
|
|
RIPRAP (STONE TY F)(GROUT)(6 IN)
|
CY
|
58.000
|
$500.000
|
$150.000
|
$370.000
|
$350.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
391.000
|
$482.560
|
$590.000
|
$650.000
|
$550.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
1,353.000
|
$50.080
|
$30.340
|
$33.000
|
$40.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
660.000
|
$50.080
|
$50.400
|
$53.000
|
$50.000
|
|
|
RAIL (TY SSTR)
|
LF
|
120.000
|
$100.000
|
$160.000
|
$375.000
|
$400.000
|
|
|
RETROFIT RAIL (CONC PARAPET)
|
LF
|
96.000
|
$300.000
|
$325.000
|
$650.000
|
$850.000
|
|
|
WINGWALL (FW - 0) (HW=13 FT)
|
EA
|
1.000
|
$80,000.000
|
$32,500.000
|
$43,000.000
|
$50,000.000
|
|
|
WINGWALL (FW - 0) (HW=14 FT)
|
EA
|
1.000
|
$52,000.000
|
$41,000.000
|
$49,000.000
|
$65,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$12,000.000
|
$1,400.000
|
$3,000.000
|
$5,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,054,500.540
|
$570,000.000
|
$590,000.000
|
$700,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$7,000.000
|
$3,370.000
|
$20,000.000
|
$6,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
100.000
|
$5.300
|
$10.000
|
$12.000
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
100.000
|
$2.000
|
$5.000
|
$5.000
|
$2.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
3.000
|
$6,000.000
|
$5,865.000
|
$6,900.000
|
$6,000.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,110.000
|
$70.000
|
$94.000
|
$98.000
|
$90.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,110.000
|
$15.000
|
$33.000
|
$25.000
|
$25.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
1,110.000
|
$15.000
|
$37.000
|
$35.000
|
$30.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
70,790.000
|
$0.200
|
$0.140
|
$0.250
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
35,395.000
|
$0.200
|
$0.180
|
$0.250
|
$0.250
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
3,162.500
|
$34.570
|
$27.000
|
$28.750
|
$35.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
20.000
|
$2,275.000
|
$2,700.000
|
$2,960.000
|
$2,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,237.500
|
$2.250
|
$2.500
|
$2.750
|
$3.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
16.000
|
$250.000
|
$250.000
|
$265.000
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
44.000
|
$3,298.570
|
$2,800.000
|
$2,975.000
|
$3,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
42.000
|
$285.750
|
$250.000
|
$265.000
|
$250.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$2,000.000
|
$1,240.000
|
$2,100.000
|
$3,500.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
6.000
|
$1,500.000
|
$830.000
|
$1,000.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$10,000.000
|
$7,507.000
|
$9,000.000
|
$9,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
42.000
|
$27.000
|
$20.000
|
$21.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
107.000
|
$39.040
|
$40.000
|
$43.000
|
$50.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
4.000
|
$105.000
|
$60.000
|
$65.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
|
LF
|
120.000
|
$0.770
|
$1.500
|
$1.600
|
$2.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
278.000
|
$0.670
|
$0.500
|
$0.530
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
181.000
|
$3.300
|
$7.000
|
$7.450
|
$8.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
169,792.000
|
$1.070
|
$0.250
|
$0.270
|
$0.300
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
94.000
|
$1.600
|
$0.950
|
$1.500
|
$1.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,245.000
|
$1.610
|
$0.950
|
$1.500
|
$1.500
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
120.000
|
$1.290
|
$2.100
|
$2.230
|
$3.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
420.000
|
$0.740
|
$1.050
|
$1.120
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
259.000
|
$6.220
|
$8.000
|
$8.510
|
$8.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
87,613.000
|
$1.010
|
$0.700
|
$0.740
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
7,750.000
|
$0.880
|
$0.700
|
$0.740
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
37,619.000
|
$1.020
|
$0.700
|
$0.740
|
$0.750
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
5.000
|
$189.420
|
$277.000
|
$300.000
|
$300.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
5.000
|
$323.000
|
$365.000
|
$400.000
|
$375.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
24.000
|
$6.750
|
$5.500
|
$5.850
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
934.000
|
$7.740
|
$5.500
|
$5.850
|
$6.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
27,403.000
|
$150.000
|
$98.300
|
$104.000
|
$105.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
22,715.000
|
$150.000
|
$123.350
|
$125.000
|
$115.000
|
|
|
TACK COAT
|
GAL
|
20,650.000
|
$4.000
|
$3.050
|
$0.010
|
$3.500
|
|
|
UNDERSEAL COURSE
|
GAL
|
51,421.000
|
$4.000
|
$4.500
|
$0.010
|
$4.000
|
|
|
POLYESTER POLYMER CONC OVERLAY (1")
|
SY
|
1,738.000
|
$120.000
|
$120.000
|
$205.000
|
$225.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
180.000
|
$82.000
|
$53.040
|
$125.000
|
$100.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$4,769.090
|
$6,495.000
|
$14,000.000
|
$9,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
180.000
|
$250.000
|
$194.850
|
$5.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
1,440.000
|
$35.000
|
$20.000
|
$1.000
|
$20.000
|
|
Totals: |
$12,006,391.900
|
$8,755,569.660
|
$9,288,397.060
|
$9,683,319.350
|