PREPARING ROW
|
STA
|
21.700
|
$3,200.000
|
$2,100.000
|
$2,200.000
|
$2,450.000
|
$4,000.000
|
$7,700.000
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
55.000
|
$500.000
|
$86.000
|
$357.500
|
$148.000
|
$75.000
|
$150.000
|
|
|
REMOV STAB BASE AND ASPH PAV (10"-18")
|
SY
|
5,241.000
|
$12.000
|
$11.000
|
$4.510
|
$7.350
|
$9.500
|
$15.000
|
|
|
REMOVING UNTREATED BASE (8")
|
SY
|
787.000
|
$10.000
|
$7.500
|
$22.000
|
$10.500
|
$15.000
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,742.000
|
$23.000
|
$17.000
|
$20.900
|
$25.200
|
$23.000
|
$20.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
575.000
|
$35.000
|
$35.000
|
$47.400
|
$28.350
|
$20.000
|
$40.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
1,590.000
|
$25.000
|
$17.000
|
$24.830
|
$31.500
|
$32.000
|
$15.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
9,545.000
|
$2.500
|
$1.000
|
$8.470
|
$3.150
|
$3.500
|
$4.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
9,545.000
|
$1.200
|
$0.550
|
$0.610
|
$0.600
|
$1.250
|
$0.500
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
4,772.000
|
$1.000
|
$0.790
|
$0.830
|
$0.800
|
$1.500
|
$0.740
|
|
|
VEGETATIVE WATERING
|
MG
|
155.000
|
$37.000
|
$1.000
|
$82.500
|
$60.000
|
$1.000
|
$100.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
200.000
|
$2.000
|
$4.000
|
$9.850
|
$9.400
|
$5.000
|
$7.500
|
|
|
FL BS(CMP IN PLC)(TY D GR 5)(FNAL POS)
|
CY
|
2,298.000
|
$99.000
|
$85.000
|
$110.000
|
$98.700
|
$125.000
|
$140.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
1,442.000
|
$8.000
|
$7.500
|
$7.700
|
$5.900
|
$10.000
|
$7.730
|
|
|
ASPH (CRS-2)
|
GAL
|
2,523.000
|
$4.000
|
$5.500
|
$5.230
|
$4.200
|
$9.000
|
$4.400
|
|
|
AGGR(TY-D GR-4 OR TY-L GR-4)
|
CY
|
53.400
|
$220.000
|
$300.000
|
$390.500
|
$488.000
|
$550.000
|
$511.500
|
|
|
CEM STABIL BKFL
|
CY
|
179.000
|
$285.000
|
$280.000
|
$275.000
|
$397.000
|
$325.000
|
$400.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
664.000
|
$250.000
|
$185.000
|
$154.000
|
$180.500
|
$275.000
|
$175.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
320.000
|
$385.000
|
$250.000
|
$187.000
|
$224.900
|
$275.000
|
$200.000
|
|
|
CL B CONC (FLUME)
|
CY
|
4.700
|
$1,000.000
|
$1,250.000
|
$770.000
|
$1,965.000
|
$1,800.000
|
$1,500.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
46.600
|
$1,750.000
|
$1,650.000
|
$1,191.820
|
$1,460.000
|
$1,400.000
|
$3,000.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
18.000
|
$1,750.000
|
$1,750.000
|
$1,191.300
|
$2,135.000
|
$2,000.000
|
$2,500.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
11.200
|
$2,000.000
|
$2,000.000
|
$1,430.040
|
$2,255.000
|
$2,000.000
|
$3,000.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
5,419.000
|
$25.000
|
$25.000
|
$23.650
|
$29.050
|
$32.500
|
$40.000
|
|
|
APPROACH SLAB
|
CY
|
110.000
|
$675.000
|
$700.000
|
$684.130
|
$695.000
|
$900.000
|
$2,000.000
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
689.500
|
$230.000
|
$260.000
|
$192.500
|
$233.200
|
$275.000
|
$400.000
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
346.500
|
$230.000
|
$250.000
|
$192.500
|
$240.900
|
$350.000
|
$400.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,792.000
|
$195.000
|
$139.000
|
$214.500
|
$153.650
|
$200.000
|
$275.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
76.000
|
$625.000
|
$650.000
|
$715.000
|
$816.000
|
$800.000
|
$1,000.000
|
|
|
RAIL (TY T223)
|
LF
|
348.000
|
$161.000
|
$145.000
|
$121.000
|
$190.000
|
$165.000
|
$200.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
128.000
|
$165.000
|
$132.000
|
$165.000
|
$145.000
|
$150.000
|
$100.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
36.000
|
$91.000
|
$100.000
|
$45.100
|
$126.000
|
$225.000
|
$200.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,500.000
|
$2,000.000
|
$1,048.300
|
$3,410.000
|
$2,500.000
|
$2,500.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$33,000.000
|
$40,000.000
|
$24,477.750
|
$54,400.000
|
$45,000.000
|
$55,000.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
80.000
|
$13.000
|
$10.000
|
$9.020
|
$10.000
|
$10.000
|
$15.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$271,931.000
|
$245,000.000
|
$290,000.000
|
$276,000.000
|
$250,000.000
|
$375,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$7,500.000
|
$3,500.000
|
$4,620.000
|
$3,500.000
|
$3,500.000
|
$11,550.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
325.000
|
$36.000
|
$30.000
|
$59.950
|
$57.250
|
$50.000
|
$88.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
325.000
|
$11.000
|
$5.000
|
$49.500
|
$47.000
|
$10.000
|
$44.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,434.000
|
$6.000
|
$4.500
|
$3.140
|
$3.000
|
$4.000
|
$3.850
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,434.000
|
$1.600
|
$0.750
|
$1.820
|
$1.700
|
$1.500
|
$1.650
|
|
|
INTERSECTIONS (ACP)
|
SY
|
421.000
|
$50.000
|
$50.000
|
$85.800
|
$53.550
|
$125.000
|
$80.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
156.000
|
$59.000
|
$50.000
|
$85.800
|
$78.750
|
$175.000
|
$80.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
3,504.000
|
$0.300
|
$1.750
|
$0.970
|
$1.250
|
$2.000
|
$1.250
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
1,752.000
|
$0.500
|
$1.750
|
$1.940
|
$1.400
|
$2.250
|
$1.250
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
500.000
|
$35.000
|
$33.000
|
$31.350
|
$28.350
|
$33.000
|
$35.200
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,650.000
|
$3,100.000
|
$2,420.000
|
$2,992.000
|
$2,500.000
|
$3,594.520
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,350.000
|
$3,300.000
|
$3,162.500
|
$3,150.000
|
$3,600.000
|
$3,575.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
66.000
|
$29.000
|
$95.000
|
$41.250
|
$92.400
|
$25.000
|
$50.000
|
|
|
WIRE FENCE (WATER GAP)
|
LF
|
28.000
|
$75.000
|
$165.000
|
$182.970
|
$157.500
|
$200.000
|
$250.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
2.000
|
$350.000
|
$360.000
|
$324.500
|
$310.000
|
$500.000
|
$330.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
23.000
|
$705.000
|
$825.000
|
$544.500
|
$520.000
|
$950.000
|
$715.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
13.000
|
$110.000
|
$100.000
|
$126.500
|
$135.000
|
$200.000
|
$110.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$30.000
|
$42.000
|
$20.900
|
$19.000
|
$50.000
|
$27.500
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
16.000
|
$23.000
|
$45.000
|
$16.500
|
$21.000
|
$15.000
|
$27.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$47.000
|
$42.000
|
$39.050
|
$47.250
|
$50.000
|
$44.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
33.000
|
$15.000
|
$11.000
|
$6.600
|
$6.300
|
$10.000
|
$11.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
4,437.000
|
$1.100
|
$2.220
|
$1.430
|
$1.400
|
$3.000
|
$2.200
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
1,261.000
|
$1.000
|
$2.220
|
$1.490
|
$1.450
|
$1.750
|
$2.200
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
2,917.000
|
$1.050
|
$2.220
|
$1.430
|
$1.400
|
$1.600
|
$2.200
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
68.000
|
$11.000
|
$22.000
|
$8.800
|
$8.400
|
$20.000
|
$22.000
|
|
|
TACK COAT
|
GAL
|
708.000
|
$5.000
|
$3.750
|
$3.850
|
$3.200
|
$10.000
|
$3.360
|
|
|
SP MIXES SP-C SAC-B PG70-22 (EXEMPT)
|
TON
|
1,555.000
|
$200.000
|
$135.000
|
$163.350
|
$164.000
|
$195.000
|
$170.500
|
|
|
LEAD CONTAINING COATING MANAGEMENT
|
SF
|
120.000
|
$105.000
|
$75.000
|
$101.200
|
$100.000
|
$100.000
|
$85.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$11,000.000
|
$1,000.000
|
$12,082.770
|
$11,000.000
|
$15,000.000
|
$9,450.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
6.000
|
$390.000
|
$100.000
|
$426.200
|
$1,100.000
|
$300.000
|
$1,100.000
|
|
Totals: |
$2,951,502.650
|
$2,469,349.430
|
$2,747,848.320
|
$2,795,454.100
|
$3,233,846.200
|
$3,939,650.280
|