BACKFILL (TY A)
|
STA
|
136.040
|
$155.000
|
$150.000
|
$130.000
|
$115.350
|
|
|
|
FOG SEAL (SS-1)
|
GAL
|
4,835.000
|
$3.000
|
$3.000
|
$3.200
|
$3.500
|
|
|
|
ASPH (CRS-2)
|
GAL
|
14,523.000
|
$3.070
|
$3.000
|
$2.650
|
$3.350
|
|
|
|
AGGR (TY-D GR-5 OR TY-L GR-5)
|
CY
|
387.000
|
$180.000
|
$100.000
|
$96.000
|
$102.750
|
|
|
|
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
|
TON
|
7,579.000
|
$106.000
|
$125.000
|
$150.000
|
$117.350
|
|
|
|
TOM (ASPHALT) PG 76-22
|
TON
|
43.000
|
$116.000
|
$150.000
|
$155.000
|
$139.950
|
|
|
|
TOM-C (AGGREGATE) SAC-A
|
TON
|
583.000
|
$105.000
|
$150.000
|
$155.000
|
$139.950
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
500.000
|
$66.000
|
$65.000
|
$60.000
|
$93.300
|
|
|
|
PLANE ASPH CONC PAV (0" TO 5")
|
SY
|
6,860.000
|
$3.500
|
$3.500
|
$2.550
|
$3.500
|
|
|
|
PLANE ASPH CONC PAV(MICRO-MLLING)(2")
|
SY
|
11,354.000
|
$9.000
|
$2.750
|
$2.200
|
$5.200
|
|
|
|
FULL - DEPTH REPAIR CRCP (8")
|
SY
|
500.000
|
$200.000
|
$350.000
|
$315.000
|
$342.950
|
|
|
|
ADJUSTING MANHOLES (SANITARY)
|
EA
|
3.000
|
$915.000
|
$3,000.000
|
$4,200.000
|
$4,565.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$203,000.000
|
$253,000.000
|
$171,000.000
|
$172,800.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
3.000
|
$5,000.000
|
$6,000.000
|
$36,000.000
|
$9,060.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
250.000
|
$2.800
|
$5.000
|
$6.000
|
$8.000
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
250.000
|
$0.700
|
$1.000
|
$1.000
|
$1.000
|
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,528.000
|
$38.000
|
$25.000
|
$13.000
|
$24.000
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,817.000
|
$75.000
|
$125.000
|
$153.000
|
$148.950
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,474.000
|
$40.000
|
$25.000
|
$17.000
|
$37.500
|
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
12,676.000
|
$0.170
|
$0.600
|
$0.250
|
$0.500
|
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
22.000
|
$25.000
|
$30.000
|
$24.500
|
$26.650
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$570.000
|
$1,000.000
|
$927.000
|
$1,008.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$900.000
|
$800.000
|
$755.000
|
$821.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$975.000
|
$1,000.000
|
$885.000
|
$962.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
|
EA
|
5.000
|
$1,235.000
|
$1,250.000
|
$1,140.000
|
$1,240.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U)
|
EA
|
4.000
|
$810.000
|
$1,000.000
|
$905.000
|
$984.000
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
83.000
|
$370.000
|
$350.000
|
$325.000
|
$354.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
96.000
|
$110.000
|
$65.000
|
$60.000
|
$65.250
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
8.000
|
$25.000
|
$25.000
|
$20.000
|
$22.000
|
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
1.000
|
$100.000
|
$75.000
|
$60.000
|
$65.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
36.000
|
$30.000
|
$65.000
|
$60.000
|
$65.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
7.000
|
$95.000
|
$75.000
|
$65.000
|
$71.000
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,358.000
|
$0.480
|
$1.000
|
$1.000
|
$1.000
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
20.000
|
$0.900
|
$1.000
|
$10.000
|
$10.850
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
416.000
|
$7.000
|
$6.000
|
$6.000
|
$6.500
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,634.000
|
$0.350
|
$1.000
|
$0.480
|
$0.520
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
3,040.000
|
$0.400
|
$1.000
|
$0.530
|
$0.580
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
14,007.000
|
$0.350
|
$0.750
|
$0.480
|
$0.520
|
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
28,408.000
|
$0.480
|
$0.750
|
$0.700
|
$0.760
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
5.000
|
$270.000
|
$275.000
|
$315.000
|
$342.000
|
|
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
1.000
|
$600.000
|
$700.000
|
$685.000
|
$745.000
|
|
|
|
PRE PM TY C(ACC PRK)(BL&WH)(W/BORDR)SM
|
EA
|
5.000
|
$250.000
|
$250.000
|
$415.000
|
$451.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
329.000
|
$3.350
|
$3.600
|
$5.000
|
$5.450
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
3,306.000
|
$0.500
|
$1.000
|
$0.700
|
$0.750
|
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
36.000
|
$6.100
|
$3.000
|
$10.000
|
$10.850
|
|
|
|
ELIM EXT PAV MRK & MRKS (RR XING)
|
EA
|
1.000
|
$150.000
|
$400.000
|
$350.000
|
$380.000
|
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,734.000
|
$0.100
|
$1.000
|
$0.500
|
$0.540
|
|
|
|
CAM (AGGREGATE)
|
TON
|
583.000
|
$125.000
|
$150.000
|
$142.000
|
$134.900
|
|
|
|
CAM (ASPHALT)(PG 64-22)
|
TON
|
43.000
|
$130.000
|
$150.000
|
$142.000
|
$134.900
|
|
|
|
CEMENT
|
TON
|
203.000
|
$199.010
|
$0.000
|
$0.000
|
$168.000
|
|
|
|
EMULSION
|
GAL
|
188,614.000
|
$1.240
|
$0.000
|
$0.000
|
$2.600
|
|
|
|
EMUL TRTMNT (MX EXIST MATL) 10"
|
SY
|
45,123.000
|
$3.500
|
$0.000
|
$0.000
|
$1.700
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
42.000
|
$75.000
|
$100.000
|
$90.000
|
$270.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$7,500.000
|
$4,000.000
|
$4,100.000
|
$2,800.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
72.000
|
$150.000
|
$200.000
|
$1.000
|
$570.000
|
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
50.000
|
$64.000
|
$70.000
|
$25.000
|
$89.000
|
|
1
|
|
CEMENT
|
TON
|
203.000
|
$200.000
|
$225.000
|
$146.000
|
$0.000
|
|
1
|
|
ASPHALT BINDER (PG 64-22)
|
TON
|
508.000
|
$460.000
|
$600.000
|
$550.000
|
$0.000
|
|
1
|
|
FOAMED ASPHALT TREAT (10")(DC)
|
SY
|
45,123.000
|
$3.500
|
$4.000
|
$2.800
|
$0.000
|
|
Totals: |
$2,839,576.300
|
$2,787,392.750
|
$2,837,565.030
|
$2,845,807.624
|