|
|
EXCAVATION (ROADWAY)
|
CY
|
69.000
|
$14.000
|
$20.000
|
$26.550
|
$21.550
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
787.000
|
$17.000
|
$20.000
|
$31.500
|
$24.600
|
|
|
BACKFILL (TY A)
|
STA
|
258.000
|
$150.000
|
$200.000
|
$112.450
|
$132.550
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
112,201.000
|
$0.150
|
$0.130
|
$0.120
|
$0.130
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
56,101.000
|
$0.100
|
$0.080
|
$0.080
|
$0.090
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
56,101.000
|
$0.100
|
$0.080
|
$0.070
|
$0.080
|
|
|
VEGETATIVE WATERING
|
MG
|
1,823.000
|
$15.000
|
$5.000
|
$30.000
|
$10.000
|
|
|
FOG SEAL (SS-1)
|
GAL
|
15,028.000
|
$4.000
|
$3.000
|
$3.100
|
$3.850
|
|
|
ASPH (CRS-2)
|
GAL
|
67,815.000
|
$3.000
|
$3.000
|
$2.600
|
$3.000
|
|
|
AGGR(TY-D GR-4 OR TY-L GR-4)
|
CY
|
1,118.000
|
$120.000
|
$100.000
|
$120.000
|
$163.000
|
|
|
STONE-MTRX-ASPH SMA-C SAC-B PG76-22
|
TON
|
20,245.000
|
$90.000
|
$85.000
|
$113.150
|
$102.000
|
|
|
PLANE ASPH CONC PAV (0"- 2 1/2")
|
SY
|
4,294.000
|
$3.000
|
$2.600
|
$1.850
|
$4.350
|
|
|
CUT & RESTORING PAV
|
SY
|
111.000
|
$85.000
|
$150.000
|
$145.000
|
$163.050
|
|
|
TEMPORARY SPL SHORING
|
SF
|
135.000
|
$30.000
|
$75.000
|
$65.000
|
$81.550
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
554.000
|
$55.000
|
$60.000
|
$50.000
|
$58.700
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
312.000
|
$90.000
|
$100.000
|
$70.000
|
$104.350
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
33.000
|
$965.000
|
$900.000
|
$1,250.000
|
$978.300
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
6.000
|
$1,450.000
|
$1,200.000
|
$1,200.000
|
$1,087.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
11.000
|
$1,275.000
|
$1,200.000
|
$1,200.000
|
$1,087.000
|
|
|
SET (REMOV & REINSTALL)
|
EA
|
1.000
|
$1,150.000
|
$500.000
|
$1,000.000
|
$543.500
|
|
|
REMOV STR (PIPE)
|
LF
|
695.000
|
$15.000
|
$30.000
|
$9.000
|
$32.600
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$490,636.890
|
$450,000.000
|
$255,150.000
|
$261,650.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$6,500.000
|
$5,000.000
|
$24,985.000
|
$3,765.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
3,955.000
|
$32.000
|
$12.000
|
$26.500
|
$24.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
3,955.000
|
$9.000
|
$1.000
|
$8.000
|
$6.200
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,094.000
|
$3.000
|
$2.500
|
$2.200
|
$4.270
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,094.000
|
$1.000
|
$0.500
|
$0.600
|
$0.820
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,814.000
|
$26.000
|
$30.000
|
$48.250
|
$29.500
|
|
|
DRIVEWAYS (ACP)
|
SY
|
7,605.000
|
$30.000
|
$17.000
|
$24.250
|
$25.400
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
64,442.000
|
$0.150
|
$0.150
|
$0.080
|
$0.080
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
30,157.000
|
$0.300
|
$0.150
|
$0.080
|
$0.080
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
2.000
|
$450.000
|
$500.000
|
$500.000
|
$295.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
48.000
|
$200.000
|
$200.000
|
$200.000
|
$207.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
3.000
|
$300.000
|
$250.000
|
$225.000
|
$230.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
35.000
|
$460.000
|
$500.000
|
$500.000
|
$489.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
21.000
|
$635.000
|
$600.000
|
$600.000
|
$543.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
7.000
|
$665.000
|
$700.000
|
$700.000
|
$706.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
5.000
|
$690.000
|
$800.000
|
$800.000
|
$761.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
1.000
|
$760.000
|
$1,250.000
|
$1,250.000
|
$1,250.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
1.000
|
$1,225.000
|
$1,300.000
|
$1,300.000
|
$1,305.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
91.000
|
$125.000
|
$100.000
|
$100.000
|
$32.600
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
46.000
|
$75.000
|
$100.000
|
$25.000
|
$28.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
63,076.000
|
$0.300
|
$0.160
|
$0.100
|
$0.110
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
63,076.000
|
$0.300
|
$0.160
|
$0.240
|
$0.260
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,156.000
|
$1.000
|
$1.000
|
$0.900
|
$0.920
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
749.000
|
$0.800
|
$1.000
|
$0.700
|
$0.760
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
261.000
|
$850.000
|
$6.000
|
$8.000
|
$8.700
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
165.000
|
$420.000
|
$6.000
|
$5.000
|
$5.440
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
64,442.000
|
$0.320
|
$0.330
|
$0.310
|
$0.340
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
5,320.000
|
$0.250
|
$0.330
|
$0.330
|
$0.360
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
30,683.000
|
$0.300
|
$0.330
|
$0.320
|
$0.350
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
5.000
|
$240.000
|
$200.000
|
$240.000
|
$261.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
5.000
|
$325.000
|
$300.000
|
$280.000
|
$304.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
26.000
|
$41.000
|
$60.000
|
$40.000
|
$43.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
36.000
|
$3.250
|
$4.000
|
$6.000
|
$6.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
737.000
|
$3.000
|
$4.000
|
$3.650
|
$4.000
|
|
|
CEMENT
|
TON
|
695.000
|
$155.000
|
$200.000
|
$150.000
|
$199.000
|
|
|
ASPHALT BINDER (PG 64-22)
|
TON
|
1,634.000
|
$440.000
|
$500.000
|
$470.000
|
$557.000
|
|
|
FOAMED ASPHALT TREAT (10")(DC)
|
SY
|
145,100.000
|
$4.000
|
$2.400
|
$2.750
|
$4.030
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,100.000
|
$5,500.000
|
$2,165.000
|
$550.000
|
|
|
TMA (STATIONARY)
|
DAY
|
140.000
|
$150.000
|
$160.000
|
$204.000
|
$1.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
416.000
|
$55.000
|
$25.000
|
$25.000
|
$70.450
|
|
Totals: |
$5,397,005.780
|
$4,587,556.710
|
$5,234,961.410
|
$5,271,090.140
|