PREPARING ROW
|
STA
|
228.020
|
$2,000.000
|
$675.000
|
$300.000
|
$800.000
|
$1,184.250
|
$1,574.000
|
$518.000
|
$1,785.000
|
$1,710.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,500.000
|
$10.000
|
$10.000
|
$7.000
|
$15.000
|
$27.000
|
$24.000
|
$18.250
|
$6.300
|
$20.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
228.020
|
$450.000
|
$425.000
|
$545.000
|
$600.000
|
$738.670
|
$560.000
|
$300.000
|
$630.000
|
$450.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
4,500.000
|
$10.000
|
$12.000
|
$7.000
|
$15.000
|
$17.980
|
$23.000
|
$24.250
|
$11.550
|
$30.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
170,029.000
|
$0.350
|
$0.260
|
$0.300
|
$0.410
|
$0.320
|
$0.360
|
$0.300
|
$0.310
|
$0.500
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
85,015.000
|
$0.300
|
$0.290
|
$0.250
|
$0.420
|
$0.300
|
$0.240
|
$0.270
|
$0.250
|
$0.500
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
85,015.000
|
$0.300
|
$0.300
|
$0.250
|
$0.420
|
$0.300
|
$0.280
|
$0.280
|
$0.250
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
11,904.000
|
$15.000
|
$5.000
|
$1.000
|
$5.000
|
$9.510
|
$16.000
|
$26.650
|
$0.010
|
$33.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
5,973.000
|
$5.000
|
$4.000
|
$5.000
|
$4.000
|
$5.990
|
$5.500
|
$4.700
|
$6.300
|
$6.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
9,577.000
|
$70.000
|
$75.000
|
$82.000
|
$80.000
|
$83.160
|
$78.000
|
$80.000
|
$84.000
|
$78.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22(LTX ADD)
|
TON
|
8,263.000
|
$87.000
|
$95.600
|
$96.000
|
$100.000
|
$93.600
|
$96.000
|
$92.000
|
$105.000
|
$102.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
175.000
|
$450.000
|
$450.000
|
$650.000
|
$530.000
|
$371.250
|
$325.000
|
$600.000
|
$735.000
|
$550.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
45.400
|
$100.000
|
$38.000
|
$61.000
|
$80.000
|
$74.090
|
$82.000
|
$60.000
|
$94.500
|
$65.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
20.300
|
$750.000
|
$950.000
|
$750.000
|
$700.000
|
$936.140
|
$950.000
|
$705.000
|
$945.000
|
$650.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
|
LF
|
25.600
|
$800.000
|
$780.000
|
$850.000
|
$800.000
|
$763.990
|
$1,050.000
|
$805.000
|
$1,155.000
|
$850.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
682.000
|
$60.000
|
$50.000
|
$59.000
|
$73.000
|
$68.690
|
$65.000
|
$60.000
|
$63.000
|
$65.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
82.000
|
$115.000
|
$62.000
|
$95.000
|
$89.000
|
$92.120
|
$94.000
|
$95.000
|
$73.500
|
$85.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
8.000
|
$120.000
|
$90.000
|
$135.000
|
$200.000
|
$176.470
|
$285.000
|
$135.000
|
$315.000
|
$105.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
50.000
|
$125.000
|
$105.000
|
$210.000
|
$175.000
|
$238.900
|
$300.000
|
$205.000
|
$420.000
|
$150.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
6.000
|
$200.000
|
$180.000
|
$260.000
|
$305.000
|
$383.400
|
$485.000
|
$255.000
|
$630.000
|
$250.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
6.000
|
$275.000
|
$205.000
|
$320.000
|
$335.000
|
$420.340
|
$500.000
|
$305.000
|
$735.000
|
$285.000
|
|
|
RC PIPE (CL III)(54 IN)
|
LF
|
6.000
|
$300.000
|
$220.000
|
$430.000
|
$420.000
|
$492.700
|
$600.000
|
$405.000
|
$840.000
|
$500.000
|
|
|
RC PIPE (CL III)(60 IN)
|
LF
|
6.000
|
$400.000
|
$275.000
|
$470.000
|
$500.000
|
$532.980
|
$700.000
|
$455.000
|
$945.000
|
$1,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 36 IN)
|
EA
|
2.000
|
$7,900.000
|
$5,000.000
|
$9,000.000
|
$733.000
|
$4,970.810
|
$8,500.000
|
$8,600.000
|
$9,450.000
|
$10,500.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 48 IN)
|
EA
|
2.000
|
$10,500.000
|
$11,500.000
|
$11,000.000
|
$14,700.000
|
$11,361.600
|
$12,500.000
|
$11,000.000
|
$15,750.000
|
$16,500.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 60 IN)
|
EA
|
1.000
|
$12,400.000
|
$16,000.000
|
$16,000.000
|
$27,000.000
|
$15,822.000
|
$17,500.000
|
$15,500.000
|
$27,300.000
|
$25,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
3.000
|
$17,400.000
|
$19,000.000
|
$25,000.000
|
$25,000.000
|
$18,900.000
|
$20,000.000
|
$24,500.000
|
$33,333.330
|
$35,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
1.000
|
$14,100.000
|
$11,000.000
|
$8,500.000
|
$18,000.000
|
$11,124.000
|
$13,500.000
|
$8,500.000
|
$19,950.000
|
$25,000.000
|
|
|
SET (TY II) (18 IN) (CMP) (3: 1) (C)
|
EA
|
2.000
|
$1,000.000
|
$1,000.000
|
$900.000
|
$1,000.000
|
$968.000
|
$365.000
|
$855.000
|
$525.000
|
$1,500.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
8.000
|
$1,000.000
|
$1,050.000
|
$950.000
|
$1,100.000
|
$1,217.000
|
$365.000
|
$905.000
|
$630.000
|
$1,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$800.000
|
$975.000
|
$950.000
|
$1,055.000
|
$1,217.000
|
$625.000
|
$905.000
|
$735.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
30.000
|
$1,300.000
|
$1,175.000
|
$1,200.000
|
$1,250.000
|
$1,567.000
|
$500.000
|
$1,150.000
|
$1,155.000
|
$1,850.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,300.000
|
$1,100.000
|
$1,200.000
|
$1,175.000
|
$1,566.000
|
$965.000
|
$1,150.000
|
$1,260.000
|
$1,850.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,500.000
|
$1,075.000
|
$2,200.000
|
$1,150.000
|
$1,625.400
|
$1,000.000
|
$2,500.000
|
$1,365.000
|
$2,200.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$2,400.000
|
$1,775.000
|
$2,200.000
|
$3,100.000
|
$6,743.000
|
$1,700.000
|
$2,500.000
|
$1,995.000
|
$2,200.000
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$3,400.000
|
$3,050.000
|
$3,700.000
|
$4,700.000
|
$6,122.000
|
$3,900.000
|
$4,000.000
|
$3,150.000
|
$4,000.000
|
|
|
SET (TY II) (54 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$6,000.000
|
$5,000.000
|
$7,000.000
|
$6,200.000
|
$8,046.000
|
$5,500.000
|
$7,000.000
|
$9,450.000
|
$10,000.000
|
|
|
SET (TY II) (60 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$6,500.000
|
$8,500.000
|
$8,000.000
|
$6,700.000
|
$15,853.000
|
$7,500.000
|
$8,000.000
|
$13,650.000
|
$12,500.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
12.000
|
$3,200.000
|
$305.000
|
$160.000
|
$225.000
|
$1,009.800
|
$380.000
|
$155.000
|
$100.000
|
$1,500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,300.000
|
$1,075.000
|
$1,300.000
|
$1,200.000
|
$3,020.000
|
$700.000
|
$1,300.000
|
$2,100.000
|
$2,500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,300.000
|
$1,075.000
|
$1,300.000
|
$1,000.000
|
$1,512.650
|
$1,400.000
|
$1,300.000
|
$945.000
|
$5,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
64.000
|
$40.000
|
$17.500
|
$32.000
|
$23.000
|
$31.000
|
$38.000
|
$35.000
|
$31.500
|
$30.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$350,000.000
|
$150,000.000
|
$310,000.000
|
$311,500.000
|
$323,000.000
|
$400,000.000
|
$406,780.000
|
$449,000.000
|
$450,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$8,000.000
|
$12,000.000
|
$9,000.000
|
$8,000.000
|
$9,000.000
|
$7,510.000
|
$31,810.000
|
$31,500.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
1,400.000
|
$50.000
|
$26.500
|
$34.000
|
$30.000
|
$35.840
|
$35.000
|
$33.550
|
$25.560
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,400.000
|
$8.000
|
$9.900
|
$8.000
|
$5.000
|
$7.110
|
$9.000
|
$8.450
|
$9.590
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,000.000
|
$2.500
|
$3.300
|
$3.000
|
$3.000
|
$3.510
|
$1.500
|
$3.350
|
$3.200
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,000.000
|
$1.000
|
$1.100
|
$0.500
|
$1.000
|
$1.080
|
$0.500
|
$0.900
|
$1.070
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,400.000
|
$7.000
|
$4.400
|
$4.000
|
$8.000
|
$12.150
|
$3.700
|
$5.200
|
$4.260
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,400.000
|
$1.000
|
$0.770
|
$0.500
|
$1.000
|
$2.160
|
$0.500
|
$0.650
|
$0.750
|
$8.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
10.540
|
$150.000
|
$110.000
|
$350.000
|
$200.000
|
$127.490
|
$235.000
|
$103.450
|
$147.000
|
$45.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,841.000
|
$30.000
|
$29.000
|
$17.000
|
$26.000
|
$23.760
|
$34.000
|
$16.000
|
$31.500
|
$30.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
226.600
|
$75.000
|
$65.000
|
$135.000
|
$90.000
|
$56.210
|
$90.000
|
$130.000
|
$105.000
|
$85.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
965.100
|
$40.000
|
$29.000
|
$17.000
|
$26.000
|
$37.800
|
$44.000
|
$21.000
|
$73.500
|
$35.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,762.500
|
$25.000
|
$18.500
|
$10.000
|
$18.000
|
$20.520
|
$35.000
|
$9.000
|
$25.200
|
$20.000
|
|
|
TURNOUTS (ACP)
|
SY
|
827.400
|
$40.000
|
$29.000
|
$17.000
|
$54.000
|
$42.660
|
$34.000
|
$74.000
|
$63.000
|
$30.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,625.000
|
$20.000
|
$19.800
|
$19.000
|
$24.000
|
$22.950
|
$20.000
|
$23.000
|
$19.170
|
$22.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
8.000
|
$1,100.000
|
$935.000
|
$900.000
|
$1,060.000
|
$1,026.000
|
$900.000
|
$1,020.000
|
$905.250
|
$1,850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,072.500
|
$5.000
|
$3.850
|
$4.000
|
$4.000
|
$3.510
|
$4.000
|
$3.500
|
$3.730
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
8.000
|
$200.000
|
$165.000
|
$160.000
|
$200.000
|
$129.600
|
$160.000
|
$129.000
|
$159.750
|
$850.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
12.000
|
$150.000
|
$165.000
|
$160.000
|
$200.000
|
$189.000
|
$160.000
|
$188.000
|
$159.750
|
$850.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
20.000
|
$2,500.000
|
$2,310.000
|
$2,200.000
|
$2,500.000
|
$2,197.800
|
$2,200.000
|
$2,185.000
|
$3,150.000
|
$2,850.000
|
|
|
MAILBOX INSTALL-S (RR-POST) TY 4
|
EA
|
23.000
|
$250.000
|
$275.000
|
$270.000
|
$300.000
|
$244.750
|
$270.000
|
$255.000
|
$266.250
|
$650.000
|
|
|
MAILBOX INSTALL-D (RR-POST) TY 4
|
EA
|
2.000
|
$175.000
|
$330.000
|
$320.000
|
$700.000
|
$275.000
|
$340.000
|
$255.000
|
$319.500
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
11.000
|
$500.000
|
$385.000
|
$370.000
|
$550.000
|
$430.000
|
$370.000
|
$475.000
|
$372.750
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
5.000
|
$500.000
|
$495.000
|
$470.000
|
$450.000
|
$612.000
|
$480.000
|
$475.000
|
$479.250
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
19.000
|
$550.000
|
$495.000
|
$470.000
|
$650.000
|
$576.000
|
$480.000
|
$550.000
|
$479.250
|
$650.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
1.000
|
$550.000
|
$605.000
|
$580.000
|
$1,000.000
|
$766.000
|
$590.000
|
$575.000
|
$585.750
|
$650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
42.000
|
$100.000
|
$110.000
|
$110.000
|
$120.000
|
$143.000
|
$110.000
|
$25.000
|
$106.500
|
$500.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
22,547.940
|
$0.170
|
$0.300
|
$0.200
|
$0.300
|
$0.220
|
$0.220
|
$0.220
|
$0.210
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
|
LF
|
165.000
|
$0.630
|
$0.550
|
$1.300
|
$1.000
|
$1.400
|
$0.550
|
$0.530
|
$1.380
|
$0.650
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
180.000
|
$0.390
|
$0.510
|
$0.500
|
$1.000
|
$0.540
|
$0.550
|
$0.530
|
$0.530
|
$0.650
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
25.000
|
$1.950
|
$11.000
|
$6.000
|
$14.000
|
$6.490
|
$5.200
|
$5.200
|
$6.390
|
$10.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
4.000
|
$46.000
|
$214.500
|
$100.000
|
$220.000
|
$108.000
|
$130.000
|
$129.450
|
$106.500
|
$150.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
4.000
|
$52.000
|
$275.000
|
$120.000
|
$275.000
|
$129.600
|
$155.000
|
$155.300
|
$127.800
|
$200.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
8,252.470
|
$0.190
|
$0.230
|
$0.250
|
$0.250
|
$0.270
|
$0.220
|
$0.220
|
$0.270
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
36,863.910
|
$0.190
|
$0.230
|
$0.200
|
$0.230
|
$0.220
|
$0.220
|
$0.220
|
$0.210
|
$0.350
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
22,412.630
|
$0.560
|
$0.490
|
$0.550
|
$0.500
|
$0.590
|
$0.550
|
$0.530
|
$0.590
|
$0.650
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
10.000
|
$7.500
|
$11.000
|
$6.000
|
$15.000
|
$6.480
|
$10.500
|
$10.360
|
$6.390
|
$12.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
8,251.870
|
$0.750
|
$0.660
|
$0.800
|
$0.700
|
$0.860
|
$0.550
|
$0.530
|
$0.850
|
$0.650
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
36,746.610
|
$0.600
|
$0.490
|
$0.550
|
$0.500
|
$0.590
|
$0.550
|
$0.530
|
$0.590
|
$0.650
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
45.000
|
$1.200
|
$1.650
|
$2.200
|
$3.000
|
$2.160
|
$1.100
|
$1.050
|
$2.130
|
$1.250
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
180.000
|
$0.800
|
$1.050
|
$1.100
|
$3.000
|
$1.108
|
$1.100
|
$1.050
|
$1.070
|
$1.250
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
140.000
|
$5.250
|
$11.000
|
$6.500
|
$12.000
|
$6.480
|
$5.700
|
$5.700
|
$6.390
|
$6.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
4.000
|
$110.000
|
$214.500
|
$110.000
|
$220.000
|
$108.000
|
$150.000
|
$145.450
|
$106.500
|
$150.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$130.000
|
$275.000
|
$130.000
|
$280.000
|
$129.600
|
$180.000
|
$171.350
|
$127.800
|
$185.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
45,681.800
|
$0.300
|
$0.330
|
$0.320
|
$0.330
|
$0.320
|
$0.420
|
$0.420
|
$0.320
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,130.750
|
$0.350
|
$0.360
|
$0.370
|
$0.370
|
$0.380
|
$0.420
|
$0.420
|
$0.370
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
36,715.200
|
$0.300
|
$0.360
|
$0.320
|
$0.370
|
$0.320
|
$0.420
|
$0.420
|
$0.320
|
$0.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
15.000
|
$5.000
|
$7.150
|
$6.000
|
$10.000
|
$5.400
|
$4.200
|
$4.150
|
$5.330
|
$10.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
109.000
|
$5.000
|
$7.150
|
$6.000
|
$10.000
|
$5.400
|
$4.200
|
$4.150
|
$5.330
|
$10.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
1.000
|
$6,700.000
|
$11,000.000
|
$13,000.000
|
$6,000.000
|
$1,440.000
|
$7,000.000
|
$6,505.000
|
$9,450.000
|
$8,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$9,900.000
|
$5,000.000
|
$12,000.000
|
$14,400.000
|
$20,000.000
|
$20,000.000
|
$14,700.000
|
$16,500.000
|
|
Totals: |
$3,819,821.116
|
$3,211,242.012
|
$3,313,969.483
|
$3,698,043.813
|
$3,904,014.449
|
$4,007,458.586
|
$4,067,922.017
|
$4,419,577.109
|
$4,708,073.108
|