PREPARING ROW
|
STA
|
46.000
|
$2,000.000
|
$600.000
|
$500.000
|
$2,800.000
|
$6,000.000
|
|
|
REMOVING CONC (MISC)
|
CY
|
31.000
|
$153.000
|
$75.000
|
$100.000
|
$175.000
|
$115.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
1,817.000
|
$15.000
|
$26.000
|
$25.000
|
$16.000
|
$48.000
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
65.000
|
$105.000
|
$50.000
|
$100.000
|
$275.000
|
$113.000
|
|
|
BLOCK SODDING
|
SY
|
3,855.000
|
$4.500
|
$7.000
|
$5.000
|
$5.000
|
$6.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
2,429.000
|
$0.500
|
$0.500
|
$2.000
|
$0.130
|
$0.300
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
2,429.000
|
$0.500
|
$0.500
|
$2.000
|
$0.130
|
$0.300
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
4,858.000
|
$1.500
|
$1.000
|
$2.000
|
$0.340
|
$0.650
|
|
|
VEGETATIVE WATERING
|
MG
|
267.500
|
$20.000
|
$10.000
|
$50.000
|
$5.000
|
$50.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
1,151.000
|
$2.000
|
$2.500
|
$5.000
|
$1.000
|
$2.500
|
|
|
CEM STABIL BKFL
|
CY
|
45.000
|
$150.000
|
$125.000
|
$180.000
|
$315.000
|
$100.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
220.000
|
$160.000
|
$125.000
|
$180.000
|
$110.000
|
$200.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
69.000
|
$160.000
|
$90.000
|
$180.000
|
$90.000
|
$125.000
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
345.000
|
$90.000
|
$75.000
|
$150.000
|
$80.000
|
$40.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
1.000
|
$210.000
|
$200.000
|
$500.000
|
$800.000
|
$800.000
|
|
|
CL C CONC (MISC)
|
CY
|
62.100
|
$835.000
|
$600.000
|
$400.000
|
$800.000
|
$1,200.000
|
|
|
CL C CONC (VEH DEFL WALL)
|
CY
|
68.600
|
$750.000
|
$650.000
|
$700.000
|
$800.000
|
$1,200.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
25.000
|
$200.000
|
$175.000
|
$500.000
|
$225.000
|
$200.000
|
|
|
RAIL (TY T631)
|
LF
|
38.000
|
$75.000
|
$80.000
|
$200.000
|
$110.000
|
$90.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
11.000
|
$550.000
|
$450.000
|
$800.000
|
$1,000.000
|
$450.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
5.000
|
$540.000
|
$450.000
|
$800.000
|
$1,400.000
|
$485.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
5.000
|
$650.000
|
$450.000
|
$800.000
|
$1,500.000
|
$500.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
4.000
|
$675.000
|
$500.000
|
$800.000
|
$1,900.000
|
$550.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
5.000
|
$640.000
|
$700.000
|
$800.000
|
$2,200.000
|
$600.000
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
228.000
|
$40.000
|
$37.000
|
$80.000
|
$40.000
|
$40.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
3,022.000
|
$45.000
|
$50.000
|
$80.000
|
$48.000
|
$48.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
182.000
|
$60.000
|
$60.000
|
$100.000
|
$70.000
|
$92.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
138.000
|
$123.000
|
$125.000
|
$100.000
|
$130.000
|
$135.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$3,250.000
|
$5,000.000
|
$5,000.000
|
$7,500.000
|
$5,000.000
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
1.000
|
$7,620.000
|
$5,000.000
|
$5,000.000
|
$11,000.000
|
$4,500.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
1.000
|
$8,895.000
|
$7,000.000
|
$10,000.000
|
$11,200.000
|
$5,000.000
|
|
|
WINGWALL (PW - 2) (HW=3 FT)
|
EA
|
1.000
|
$11,200.000
|
$10,000.000
|
$10,000.000
|
$11,500.000
|
$5,500.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
2.000
|
$12,500.000
|
$10,000.000
|
$10,000.000
|
$17,000.000
|
$11,000.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
1.000
|
$14,800.000
|
$12,000.000
|
$10,000.000
|
$22,000.000
|
$17,500.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
1.000
|
$17,200.000
|
$14,000.000
|
$15,000.000
|
$43,000.000
|
$30,000.000
|
|
|
SET (TY II) (15 IN) (RCP) (6: 1) (P)
|
EA
|
64.000
|
$720.000
|
$600.000
|
$600.000
|
$615.000
|
$700.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
5.000
|
$1,000.000
|
$750.000
|
$600.000
|
$625.000
|
$750.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
178.000
|
$740.000
|
$825.000
|
$600.000
|
$685.000
|
$800.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$1,200.000
|
$875.000
|
$800.000
|
$785.000
|
$900.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,355.000
|
$1,250.000
|
$900.000
|
$1,100.000
|
$950.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,800.000
|
$1,700.000
|
$1,200.000
|
$1,350.000
|
$2,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
9.000
|
$2,425.000
|
$2,250.000
|
$1,500.000
|
$1,900.000
|
$3,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$4,200.000
|
$5,900.000
|
$5,000.000
|
$4,800.000
|
$3,500.000
|
|
|
SET (TY II) (42 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$3,155.000
|
$4,750.000
|
$5,000.000
|
$3,350.000
|
$4,000.000
|
|
|
SET (TY II) (48 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$6,000.000
|
$9,000.000
|
$8,000.000
|
$10,250.000
|
$5,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
62.000
|
$1,450.000
|
$750.000
|
$1,000.000
|
$1,545.000
|
$1,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
10.000
|
$600.000
|
$200.000
|
$500.000
|
$550.000
|
$750.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
8.000
|
$1,200.000
|
$200.000
|
$1,000.000
|
$500.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
73.000
|
$500.000
|
$15.000
|
$500.000
|
$375.000
|
$1,200.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
33.000
|
$100.000
|
$10.000
|
$10.000
|
$100.000
|
$50.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$170,000.000
|
$85,000.000
|
$180,000.000
|
$200,000.000
|
$175,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
26.000
|
$1,800.000
|
$3,000.000
|
$2,000.000
|
$3,500.000
|
$18,482.700
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
510.000
|
$35.000
|
$25.000
|
$15.000
|
$38.500
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
510.000
|
$10.000
|
$2.000
|
$10.000
|
$9.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
702.000
|
$30.000
|
$5.000
|
$15.000
|
$24.750
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
702.000
|
$11.000
|
$2.000
|
$10.000
|
$9.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,191.000
|
$2.500
|
$2.500
|
$2.000
|
$3.150
|
$3.310
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,191.000
|
$1.000
|
$1.000
|
$2.000
|
$0.850
|
$1.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
10,425.000
|
$21.000
|
$22.750
|
$25.000
|
$30.000
|
$24.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
20.000
|
$1,582.000
|
$1,800.000
|
$1,000.000
|
$1,600.000
|
$1,765.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
4.000
|
$1,250.000
|
$1,050.000
|
$1,500.000
|
$1,275.000
|
$1,025.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
14,350.000
|
$1.000
|
$1.000
|
$1.000
|
$2.750
|
$4.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
17.000
|
$165.000
|
$125.000
|
$100.000
|
$165.000
|
$275.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
20.000
|
$275.000
|
$175.000
|
$100.000
|
$275.000
|
$213.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
40.000
|
$2,650.000
|
$2,450.000
|
$2,200.000
|
$2,585.000
|
$2,800.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
31.000
|
$150.000
|
$200.000
|
$500.000
|
$275.000
|
$304.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$783.000
|
$900.000
|
$500.000
|
$935.000
|
$1,165.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$10,100.000
|
$25,500.000
|
$25,000.000
|
$2,650.000
|
$21,000.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
25.000
|
$350.000
|
$400.000
|
$500.000
|
$415.000
|
$500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
25.000
|
$90.000
|
$65.000
|
$100.000
|
$85.000
|
$131.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
41.000
|
$24.000
|
$30.000
|
$30.000
|
$31.000
|
$27.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
131.000
|
$39.050
|
$30.000
|
$30.000
|
$31.000
|
$29.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
114.000
|
$25.300
|
$26.000
|
$30.000
|
$16.500
|
$34.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
3.000
|
$110.000
|
$75.000
|
$30.000
|
$105.000
|
$24.000
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
324.000
|
$120.000
|
$180.000
|
$100.000
|
$250.000
|
$300.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$10,000.000
|
$6,000.000
|
$1,000.000
|
$18,000.000
|
$9,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
60.000
|
$175.000
|
$100.000
|
$200.000
|
$200.000
|
$196.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
60.000
|
$220.000
|
$25.000
|
$200.000
|
$200.000
|
$237.000
|
|
Totals: |
$1,881,761.250
|
$1,651,687.750
|
$1,888,631.000
|
$2,244,316.760
|
$2,864,085.010
|