PREPARING ROW
|
STA
|
13.800
|
$1,500.000
|
$1,000.000
|
$3,000.000
|
$4,500.000
|
$9,730.000
|
$3,000.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
745.000
|
$10.000
|
$11.000
|
$15.000
|
$35.000
|
$20.900
|
$14.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
383.000
|
$8.000
|
$30.000
|
$25.000
|
$35.000
|
$17.900
|
$24.000
|
|
|
BLADING
|
STA
|
4.700
|
$110.000
|
$1,000.000
|
$500.000
|
$1,500.000
|
$224.000
|
$450.000
|
|
|
BLOCK SODDING
|
SY
|
119.000
|
$5.000
|
$9.000
|
$8.000
|
$12.000
|
$16.400
|
$8.910
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
6,964.000
|
$0.300
|
$0.500
|
$0.750
|
$1.000
|
$1.390
|
$0.640
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
2,099.000
|
$0.250
|
$0.900
|
$0.250
|
$1.000
|
$0.890
|
$0.960
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
2,099.000
|
$0.250
|
$0.900
|
$0.250
|
$1.000
|
$0.840
|
$1.020
|
|
|
VEGETATIVE WATERING
|
MG
|
223.200
|
$13.000
|
$12.000
|
$1.000
|
$25.000
|
$0.860
|
$20.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
534.000
|
$1.250
|
$4.000
|
$3.000
|
$4.500
|
$3.950
|
$2.450
|
|
|
FL BS (RDWY DEL)(TY D GR 1-2 OR GR 5)
|
TON
|
586.000
|
$28.000
|
$60.000
|
$70.000
|
$96.000
|
$65.000
|
$45.000
|
|
|
CEMENT
|
TON
|
26.200
|
$150.000
|
$165.000
|
$200.000
|
$225.000
|
$285.000
|
$275.000
|
|
|
CEMENT TREAT(MX EXST MTL & NW BS)(12")
|
SY
|
984.000
|
$2.900
|
$10.000
|
$15.000
|
$14.000
|
$7.400
|
$8.000
|
|
|
CEMENT TREAT (NEW BASE)(12")
|
SY
|
451.000
|
$4.000
|
$20.000
|
$15.000
|
$14.000
|
$7.400
|
$8.000
|
|
|
ASPH (RC-250)
|
GAL
|
359.000
|
$4.000
|
$9.000
|
$12.000
|
$19.000
|
$15.900
|
$10.000
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
2,062.000
|
$4.500
|
$5.000
|
$8.000
|
$16.000
|
$12.800
|
$8.500
|
|
|
AGGR (TY-PE, E, L OR PL GR 3)
|
CY
|
16.000
|
$115.000
|
$750.000
|
$600.000
|
$800.000
|
$480.000
|
$650.000
|
|
|
AGGR (TY E OR L GR 5)
|
CY
|
11.000
|
$145.000
|
$750.000
|
$600.000
|
$800.000
|
$487.000
|
$650.000
|
|
|
AGGR(TY PE,TY-PL,TY-E,TY-L GR-4)(SAC-B)
|
CY
|
31.000
|
$125.000
|
$400.000
|
$600.000
|
$800.000
|
$474.000
|
$650.000
|
|
|
D-GR HMA(SQ) TY-D PG64-22 NON-MOW STRIP
|
SY
|
224.000
|
$50.000
|
$65.000
|
$80.000
|
$85.000
|
$67.000
|
$125.000
|
|
|
CEM STABIL BKFL
|
CY
|
104.000
|
$100.000
|
$200.000
|
$200.000
|
$295.000
|
$219.000
|
$200.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
174.000
|
$125.000
|
$100.000
|
$175.000
|
$180.000
|
$241.000
|
$174.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
162.000
|
$200.000
|
$180.000
|
$200.000
|
$221.000
|
$295.000
|
$278.000
|
|
|
CL C CONC (ABUT)
|
CY
|
22.600
|
$1,000.000
|
$1,000.000
|
$1,200.000
|
$1,475.000
|
$1,210.000
|
$1,400.000
|
|
|
CL C CONC (CAP)
|
CY
|
17.000
|
$1,000.000
|
$1,250.000
|
$1,200.000
|
$2,250.000
|
$1,660.000
|
$1,800.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
4.900
|
$1,150.000
|
$1,500.000
|
$1,500.000
|
$3,500.000
|
$1,270.000
|
$2,200.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
5,121.000
|
$15.000
|
$14.000
|
$18.000
|
$23.750
|
$22.500
|
$19.000
|
|
|
APPROACH SLAB
|
CY
|
51.600
|
$525.000
|
$650.000
|
$700.000
|
$925.000
|
$627.000
|
$600.000
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
891.040
|
$135.000
|
$130.000
|
$165.000
|
$245.000
|
$133.000
|
$176.000
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
297.020
|
$160.000
|
$160.000
|
$165.000
|
$245.000
|
$133.000
|
$174.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
45.000
|
$500.000
|
$520.000
|
$550.000
|
$660.000
|
$636.000
|
$600.000
|
|
|
RAIL (TY T223)
|
LF
|
324.000
|
$115.000
|
$120.000
|
$125.000
|
$145.000
|
$130.000
|
$122.000
|
|
|
ARMOR JOINT
|
LF
|
68.000
|
$95.000
|
$70.000
|
$80.000
|
$110.000
|
$144.000
|
$100.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
44.000
|
$60.000
|
$58.000
|
$40.000
|
$65.000
|
$69.000
|
$60.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
56.000
|
$50.000
|
$54.000
|
$40.000
|
$85.000
|
$106.000
|
$60.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
16.000
|
$90.000
|
$150.000
|
$80.000
|
$221.000
|
$121.000
|
$135.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$1,000.000
|
$700.000
|
$1,500.000
|
$2,200.000
|
$1,410.000
|
$1,200.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,000.000
|
$700.000
|
$1,500.000
|
$2,200.000
|
$1,340.000
|
$1,050.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,400.000
|
$1,000.000
|
$2,000.000
|
$4,150.000
|
$3,040.000
|
$2,100.000
|
|
|
REMOV STR (PIPE)
|
LF
|
100.000
|
$15.000
|
$45.000
|
$20.000
|
$200.000
|
$22.700
|
$19.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$25,000.000
|
$15,000.000
|
$50,000.000
|
$36,500.000
|
$35,800.000
|
$25,000.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
1,194.000
|
$2.500
|
$1.000
|
$8.000
|
$6.000
|
$3.540
|
$3.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$124,000.000
|
$110,000.000
|
$162,000.000
|
$150,000.000
|
$207,000.000
|
$180,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$5,000.000
|
$10,000.000
|
$2,800.000
|
$6,500.000
|
$2,130.000
|
$2,250.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
80.000
|
$30.000
|
$35.000
|
$5.000
|
$28.000
|
$61.000
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
80.000
|
$8.000
|
$6.000
|
$1.000
|
$12.000
|
$19.300
|
$16.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
444.000
|
$20.000
|
$10.000
|
$1.000
|
$16.000
|
$26.100
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
444.000
|
$8.500
|
$2.000
|
$1.000
|
$5.000
|
$8.800
|
$15.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
427.000
|
$2.250
|
$7.000
|
$5.000
|
$6.000
|
$8.300
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,173.000
|
$2.550
|
$3.500
|
$1.000
|
$3.000
|
$5.100
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,173.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.460
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
2,764.000
|
$160.000
|
$114.000
|
$220.000
|
$88.000
|
$180.000
|
$235.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
241.000
|
$30.000
|
$25.000
|
$25.000
|
$65.000
|
$53.000
|
$65.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
200.000
|
$25.000
|
$19.000
|
$25.000
|
$29.000
|
$25.000
|
$24.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,800.000
|
$1,600.000
|
$1,700.000
|
$1,100.000
|
$1,790.000
|
$1,550.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
550.000
|
$5.000
|
$4.500
|
$4.000
|
$4.000
|
$3.300
|
$2.850
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,800.000
|
$2,800.000
|
$2,600.000
|
$3,250.000
|
$2,810.000
|
$2,775.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$400.000
|
$500.000
|
$300.000
|
$500.000
|
$275.000
|
$235.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
1,194.000
|
$12.500
|
$6.500
|
$20.000
|
$13.000
|
$19.500
|
$12.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
4.000
|
$350.000
|
$530.000
|
$900.000
|
$1,000.000
|
$858.000
|
$750.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$450.000
|
$160.000
|
$500.000
|
$500.000
|
$951.000
|
$250.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$80.000
|
$160.000
|
$100.000
|
$500.000
|
$199.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
4.000
|
$35.000
|
$25.000
|
$30.000
|
$65.000
|
$30.800
|
$39.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$40.000
|
$35.000
|
$50.000
|
$65.000
|
$49.500
|
$39.000
|
|
|
INSTL DEL ASSN (OM-2Z)(FLX)(WAP)
|
EA
|
1.000
|
$100.000
|
$55.000
|
$150.000
|
$65.000
|
$550.000
|
$150.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
2,758.000
|
$0.150
|
$2.100
|
$2.200
|
$2.000
|
$2.200
|
$2.200
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
2,758.000
|
$0.150
|
$2.100
|
$2.200
|
$2.000
|
$2.200
|
$2.200
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
138.000
|
$3.500
|
$8.500
|
$10.000
|
$6.000
|
$8.800
|
$9.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
600.000
|
$0.150
|
$1.000
|
$1.000
|
$2.000
|
$1.100
|
$1.200
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
2,750.000
|
$0.800
|
$2.100
|
$2.200
|
$3.000
|
$2.200
|
$2.200
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
2,750.000
|
$0.800
|
$2.100
|
$2.200
|
$3.000
|
$2.200
|
$2.200
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
35.000
|
$3.000
|
$16.000
|
$20.000
|
$6.000
|
$16.500
|
$18.250
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
3,037.000
|
$0.480
|
$0.400
|
$0.500
|
$2.000
|
$0.390
|
$0.400
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
600.000
|
$0.300
|
$0.500
|
$0.500
|
$2.000
|
$0.550
|
$0.650
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,500.000
|
$10,000.000
|
$20,000.000
|
$17,500.000
|
$9,300.000
|
$10,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
1.000
|
$10,000.000
|
$10,000.000
|
$10,000.000
|
$35,000.000
|
$34,200.000
|
$15,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$250.000
|
$500.000
|
$100.000
|
$500.000
|
$110.000
|
$125.000
|
|
Totals: |
$1,363,450.060
|
$1,388,285.900
|
$1,797,266.300
|
$1,853,248.450
|
$1,866,527.532
|
$1,869,651.340
|