REMOV CONC (DRIVEWAYS)
|
SY
|
1,144.000
|
$37.000
|
$55.000
|
$50.000
|
$30.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
8,821.000
|
$20.000
|
$14.350
|
$40.000
|
$25.000
|
|
|
EMBANK (VEH)(DC)(TY C)
|
CY
|
12,422.000
|
$35.000
|
$33.450
|
$40.000
|
$50.000
|
|
|
BACKFILL (TY B)
|
STA
|
626.800
|
$275.000
|
$291.960
|
$225.000
|
$250.000
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
22.000
|
$200.000
|
$250.000
|
$130.000
|
$150.000
|
|
|
BLOCK SODDING
|
SY
|
5,526.000
|
$10.000
|
$7.700
|
$6.500
|
$10.000
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
5,498.000
|
$2.000
|
$0.190
|
$0.500
|
$2.000
|
|
|
BROADCAST SEED (TEMP_COOL)
|
SY
|
5,498.000
|
$2.000
|
$0.190
|
$0.500
|
$2.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
331.000
|
$20.000
|
$1.000
|
$25.000
|
$50.000
|
|
|
EMULS ASPH (EROSN CONT)(SS-1)
|
GAL
|
13,373.000
|
$10.000
|
$6.930
|
$5.000
|
$10.000
|
|
|
ASPH (AC-15P OR CRS-2P)
|
TON
|
197.000
|
$1,500.000
|
$1,110.000
|
$1,000.000
|
$1,500.000
|
|
|
AGGR (TY E OR L, PE OR PL GR 4)
|
CY
|
810.000
|
$277.000
|
$198.000
|
$225.000
|
$300.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
61,796.000
|
$150.000
|
$148.360
|
$137.000
|
$180.000
|
|
|
SP MIXES SP-C SAC-A PG70-22 (EXEMPT)
|
TON
|
224.000
|
$180.000
|
$246.380
|
$275.000
|
$200.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
1,500.000
|
$175.000
|
$141.530
|
$125.000
|
$120.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
7,799.000
|
$4.000
|
$4.960
|
$3.500
|
$30.000
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
10,560.000
|
$4.000
|
$4.630
|
$3.750
|
$30.000
|
|
|
FULL - DEPTH REPAIR CRCP (12")
|
CY
|
50.000
|
$1,000.000
|
$725.000
|
$1,500.000
|
$1,000.000
|
|
|
STRUCT EXCAV
|
CY
|
2.300
|
$9.000
|
$28.000
|
$250.000
|
$500.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
4,040.000
|
$40.000
|
$70.000
|
$60.000
|
$70.000
|
|
|
CL B CONC (FLUME)
|
CY
|
11.000
|
$1,400.000
|
$1,350.000
|
$2,000.000
|
$1,000.000
|
|
|
CL C CONC (MISC)
|
CY
|
9.000
|
$1,200.000
|
$3,500.000
|
$3,500.000
|
$1,500.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
24.000
|
$110.000
|
$80.000
|
$100.000
|
$150.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
34.000
|
$210.000
|
$400.000
|
$350.000
|
$350.000
|
|
|
HEADWALL (CH - FW - 30) (DIA= 36 IN)
|
EA
|
1.000
|
$15,000.000
|
$22,000.000
|
$20,000.000
|
$6,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,800.000
|
$1,700.000
|
$1,500.000
|
$1,850.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$1,500.000
|
$2,300.000
|
$2,500.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
1.000
|
$1,500.000
|
$1,700.000
|
$1,500.000
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,500,000.000
|
$575,000.000
|
$1,300,000.000
|
$1,700,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
27.000
|
$3,500.000
|
$4,000.000
|
$5,000.000
|
$8,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$20,000.000
|
$15,000.000
|
$15,000.000
|
$16,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
213.000
|
$250.000
|
$150.000
|
$300.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
50.000
|
$250.000
|
$25.000
|
$500.000
|
$550.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,250.000
|
$4.000
|
$3.300
|
$5.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,250.000
|
$1.000
|
$1.650
|
$1.000
|
$2.000
|
|
|
CONC CURB & GUTTER (TY IIA)
|
LF
|
600.000
|
$50.000
|
$110.000
|
$125.000
|
$65.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
413.000
|
$105.000
|
$275.000
|
$250.000
|
$125.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
7,427.000
|
$70.000
|
$32.100
|
$45.000
|
$55.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
54,935.000
|
$0.500
|
$0.310
|
$0.300
|
$0.500
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
27,468.000
|
$0.500
|
$0.400
|
$0.350
|
$0.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,237.500
|
$35.000
|
$26.450
|
$35.000
|
$28.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,500.000
|
$1,850.000
|
$2,500.000
|
$1,850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,650.000
|
$9.000
|
$2.750
|
$3.000
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,500.000
|
$3,025.000
|
$3,000.000
|
$3,250.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$450.000
|
$275.000
|
$400.000
|
$1,500.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
15.000
|
$625.000
|
$655.000
|
$670.000
|
$1,000.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
55.000
|
$300.000
|
$303.000
|
$250.000
|
$1,000.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
16.000
|
$350.000
|
$302.000
|
$550.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
2.000
|
$650.000
|
$650.000
|
$800.000
|
$1,500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$500.000
|
$435.000
|
$750.000
|
$1,250.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$175.000
|
$105.000
|
$100.000
|
$550.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
25.000
|
$35.000
|
$35.000
|
$50.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
|
EA
|
1.000
|
$125.000
|
$300.000
|
$75.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
319.000
|
$1.000
|
$0.280
|
$1.000
|
$10.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
9,276.000
|
$0.500
|
$0.280
|
$1.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
3,005.000
|
$1.500
|
$2.500
|
$1.500
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
32,277.000
|
$2.500
|
$2.500
|
$1.500
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
807.000
|
$2.000
|
$2.000
|
$1.500
|
$6.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,077.000
|
$2.000
|
$2.000
|
$1.500
|
$6.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
2,023.000
|
$1.500
|
$0.950
|
$1.000
|
$6.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
|
LF
|
6,677.000
|
$1.000
|
$0.720
|
$0.900
|
$2.000
|
|
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
|
LF
|
136,004.000
|
$1.000
|
$0.710
|
$0.650
|
$0.850
|
|
REFL PAV MRK TY I (Y)6"(BRK)(090MIL)
|
LF
|
13,496.000
|
$1.000
|
$0.730
|
$1.000
|
$0.850
|
|
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
|
LF
|
116,459.000
|
$1.000
|
$0.720
|
$0.650
|
$0.850
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
844.000
|
$20.000
|
$13.000
|
$15.000
|
$20.000
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
37.000
|
$280.000
|
$217.000
|
$220.000
|
$250.000
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
15.000
|
$325.000
|
$275.000
|
$280.000
|
$250.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
442.000
|
$6.000
|
$5.500
|
$5.000
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,742.000
|
$6.500
|
$5.500
|
$5.000
|
$6.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
12,912.000
|
$1.000
|
$0.170
|
$0.500
|
$1.500
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
880.000
|
$1.000
|
$0.330
|
$1.000
|
$6.000
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
844.000
|
$5.000
|
$2.200
|
$5.000
|
$20.000
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
37.000
|
$85.000
|
$50.000
|
$50.000
|
$250.000
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
15.000
|
$85.000
|
$50.000
|
$100.000
|
$250.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
2,112.000
|
$5.000
|
$9.660
|
$5.500
|
$6.000
|
|
|
BONDING COURSE
|
GAL
|
22,832.000
|
$6.000
|
$5.500
|
$4.500
|
$3.000
|
|
|
SOIL DENS & RAISING CONC SLABS (HDPF)
|
LB
|
267.000
|
$9.000
|
$99.880
|
$75.000
|
$100.000
|
|
|
GEOGRID REINFORCE EMBANKMENTS (TY A)
|
SY
|
10,951.000
|
$3.000
|
$6.740
|
$5.000
|
$8.000
|
|
Totals: |
$14,652,486.200
|
$13,181,849.803
|
$13,515,976.550
|
$17,569,943.650
|