|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
148.000
|
$250.000
|
$167.000
|
$330.000
|
$180.000
|
$200.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
5,370.000
|
$20.000
|
$9.790
|
$19.750
|
$6.000
|
$10.000
|
|
|
BLADING
|
STA
|
148.000
|
$125.000
|
$35.000
|
$150.000
|
$180.000
|
$115.000
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
28.000
|
$150.000
|
$125.000
|
$300.000
|
$125.000
|
$120.000
|
|
|
BLOCK SODDING
|
SY
|
1,335.000
|
$5.000
|
$7.000
|
$4.000
|
$3.800
|
$5.500
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
15,824.000
|
$0.250
|
$0.150
|
$0.110
|
$0.100
|
$0.120
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
15,824.000
|
$0.250
|
$0.150
|
$0.100
|
$0.100
|
$0.120
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
31,647.000
|
$0.500
|
$0.330
|
$0.350
|
$0.350
|
$0.350
|
|
|
VEGETATIVE WATERING
|
MG
|
1,293.800
|
$20.000
|
$0.010
|
$10.000
|
$8.000
|
$25.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
467.000
|
$2.000
|
$2.200
|
$2.300
|
$3.000
|
$1.200
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
427.000
|
$10.000
|
$0.010
|
$20.000
|
$2.000
|
$0.010
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
16,543.000
|
$37.000
|
$28.500
|
$33.500
|
$31.270
|
$30.300
|
|
|
CEMENT
|
TON
|
726.000
|
$145.000
|
$136.000
|
$140.000
|
$155.400
|
$167.000
|
|
|
CEMENT TREAT(MX EXST MTL & NW BS)(12")
|
SY
|
42,709.000
|
$2.250
|
$2.500
|
$2.000
|
$3.860
|
$3.500
|
|
|
FOG SEAL (SS-1 OR CSS-1)
|
GAL
|
1,708.000
|
$3.500
|
$3.690
|
$4.250
|
$4.500
|
$2.500
|
|
|
ASPH (RC-250)
|
GAL
|
10,677.000
|
$5.000
|
$3.280
|
$2.800
|
$3.250
|
$5.000
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
37,583.000
|
$3.500
|
$3.280
|
$2.500
|
$3.000
|
$4.500
|
|
|
AGGR (TY-PE, E, L OR PL GR 3)
|
CY
|
474.000
|
$125.000
|
$107.610
|
$100.000
|
$110.000
|
$150.000
|
|
|
AGGR (TY E OR L GR 5)
|
CY
|
328.000
|
$125.000
|
$88.110
|
$127.000
|
$130.000
|
$140.000
|
|
|
AGGR(TY PE,TY-PL,TY-E,TY-L GR-4)(SAC-B)
|
CY
|
389.000
|
$125.000
|
$111.500
|
$100.000
|
$130.000
|
$150.000
|
|
|
CEM STABIL BKFL
|
CY
|
77.000
|
$150.000
|
$183.750
|
$200.000
|
$148.200
|
$190.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
1.000
|
$900.000
|
$735.000
|
$1,250.000
|
$1,941.600
|
$700.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
3.600
|
$525.000
|
$630.000
|
$650.000
|
$1,133.610
|
$500.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
57.000
|
$150.000
|
$198.000
|
$200.000
|
$290.100
|
$190.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
5.000
|
$500.000
|
$735.000
|
$1,050.000
|
$1,477.590
|
$1,600.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
|
LF
|
4.000
|
$550.000
|
$787.000
|
$1,300.000
|
$996.000
|
$2,000.000
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
100.000
|
$35.000
|
$42.000
|
$48.000
|
$47.500
|
$40.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
550.000
|
$40.000
|
$53.000
|
$55.000
|
$53.600
|
$50.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
10.000
|
$100.000
|
$131.000
|
$275.000
|
$121.260
|
$200.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
2.000
|
$6,000.000
|
$6,300.000
|
$6,500.000
|
$7,480.640
|
$3,200.000
|
|
|
WINGWALL (FW - S) (HW=4 FT)
|
EA
|
1.000
|
$7,000.000
|
$6,300.000
|
$8,200.000
|
$7,511.820
|
$3,000.000
|
|
|
SET (TY II) (15 IN) (RCP) (6: 1) (P)
|
EA
|
28.000
|
$450.000
|
$577.000
|
$500.000
|
$411.310
|
$485.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$500.000
|
$577.000
|
$900.000
|
$439.430
|
$520.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
34.000
|
$600.000
|
$630.000
|
$800.000
|
$495.680
|
$585.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$900.000
|
$1,260.000
|
$2,200.000
|
$889.410
|
$1,200.000
|
|
|
REMOV STR (PIPE)
|
EA
|
15.000
|
$150.000
|
$260.000
|
$275.000
|
$692.120
|
$300.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$135,000.000
|
$82,000.000
|
$150,000.000
|
$180,000.000
|
$150,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$2,500.000
|
$1,520.000
|
$2,000.000
|
$6,700.000
|
$1,600.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
600.000
|
$25.000
|
$28.000
|
$23.000
|
$35.000
|
$32.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
600.000
|
$5.000
|
$10.000
|
$8.500
|
$4.000
|
$6.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
123.000
|
$20.000
|
$28.000
|
$21.000
|
$10.000
|
$32.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
123.000
|
$5.000
|
$10.000
|
$7.000
|
$1.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
510.000
|
$2.500
|
$3.500
|
$3.000
|
$4.500
|
$3.300
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
510.000
|
$1.000
|
$1.000
|
$0.900
|
$1.500
|
$1.100
|
|
|
DRIVEWAYS (CONC)
|
SY
|
36.000
|
$100.000
|
$125.000
|
$150.000
|
$137.960
|
$90.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
257.000
|
$40.000
|
$37.850
|
$50.000
|
$48.000
|
$45.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
922.000
|
$30.000
|
$33.000
|
$40.000
|
$28.000
|
$40.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
327.000
|
$35.000
|
$33.000
|
$35.000
|
$28.000
|
$40.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
8.000
|
$150.000
|
$173.000
|
$325.000
|
$174.900
|
$180.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
2.000
|
$250.000
|
$200.000
|
$380.000
|
$196.100
|
$203.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
2.000
|
$350.000
|
$550.000
|
$775.000
|
$556.500
|
$580.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$525.000
|
$600.000
|
$730.000
|
$602.080
|
$625.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$900.000
|
$950.000
|
$1,200.000
|
$946.580
|
$980.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
15.000
|
$325.000
|
$290.000
|
$440.000
|
$292.560
|
$303.000
|
|
|
INSTL DEL ASSN (OM-2Z)(FLX)(WAP)
|
EA
|
7.000
|
$60.000
|
$84.000
|
$175.000
|
$84.800
|
$88.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
59,136.000
|
$0.150
|
$0.210
|
$0.210
|
$0.120
|
$0.120
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
59,136.000
|
$0.150
|
$0.210
|
$0.210
|
$0.120
|
$0.120
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
8,871.000
|
$1.000
|
$1.000
|
$1.000
|
$0.400
|
$1.500
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
29,738.000
|
$1.000
|
$0.770
|
$0.890
|
$0.540
|
$0.770
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
3,180.000
|
$1.000
|
$0.770
|
$1.310
|
$0.540
|
$0.770
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
10,387.000
|
$1.000
|
$0.770
|
$1.050
|
$0.540
|
$0.770
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
18.000
|
$25.000
|
$21.000
|
$15.750
|
$26.500
|
$16.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
293.000
|
$3.000
|
$5.250
|
$3.680
|
$8.480
|
$3.030
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
817.000
|
$3.000
|
$21.000
|
$13.130
|
$8.480
|
$5.500
|
|
|
TMA (STATIONARY)
|
EA
|
1.000
|
$10,000.000
|
$8,000.000
|
$10,000.000
|
$15,000.000
|
$6,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
96.000
|
$20.000
|
$20.000
|
$80.000
|
$40.000
|
$50.000
|
|
Totals: |
$1,826,047.050
|
$1,499,731.078
|
$1,762,059.730
|
$1,774,126.436
|
$1,810,440.060
|