|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
588.000
|
$25.000
|
$15.000
|
$30.000
|
$20.000
|
$20.910
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,108.000
|
$16.000
|
$15.000
|
$14.550
|
$10.000
|
$35.700
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
35,918.000
|
$13.000
|
$30.000
|
$18.890
|
$30.000
|
$75.180
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
15,136.000
|
$0.350
|
$0.550
|
$0.700
|
$1.000
|
$0.370
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
7,568.000
|
$0.150
|
$0.250
|
$0.300
|
$0.500
|
$0.290
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
7,568.000
|
$0.150
|
$0.250
|
$0.300
|
$0.500
|
$0.290
|
|
|
VEGETATIVE WATERING
|
MG
|
250.000
|
$30.000
|
$41.000
|
$51.200
|
$50.000
|
$41.380
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
2,781.100
|
$65.000
|
$25.000
|
$95.550
|
$65.000
|
$78.390
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,968.400
|
$8.000
|
$6.000
|
$11.140
|
$10.000
|
$6.970
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
4,738.200
|
$4.500
|
$7.000
|
$7.450
|
$10.000
|
$4.790
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
95.900
|
$200.000
|
$175.000
|
$312.840
|
$1,000.000
|
$408.670
|
|
|
SUPERPAVE MIXTURES SP-C PG70-22
|
TON
|
2,220.700
|
$140.000
|
$135.000
|
$168.880
|
$180.000
|
$130.000
|
|
|
SUPERPAVE MIXTURES SP-D SAC-B PG70-28
|
TON
|
1,028.700
|
$140.000
|
$140.000
|
$249.120
|
$180.000
|
$160.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
54.000
|
$18.000
|
$150.000
|
$1.250
|
$2.000
|
$11.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
772.000
|
$275.000
|
$350.000
|
$395.000
|
$300.000
|
$257.400
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
42.000
|
$1,700.000
|
$2,000.000
|
$1,404.830
|
$1,800.000
|
$1,540.000
|
|
|
CL C CONC (BENT)(HPC)
|
CY
|
72.500
|
$1,800.000
|
$2,000.000
|
$2,248.350
|
$1,800.000
|
$1,551.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
16,896.000
|
$27.000
|
$40.000
|
$31.580
|
$28.000
|
$34.100
|
|
|
APPROACH SLAB (HPC)
|
CY
|
67.400
|
$625.000
|
$2,000.000
|
$1,057.150
|
$800.000
|
$884.400
|
|
|
RETAINING WALL (MSE)
|
SF
|
47,014.000
|
$45.000
|
$50.000
|
$62.940
|
$63.000
|
$44.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
2,295.190
|
$250.000
|
$300.000
|
$213.700
|
$225.000
|
$225.500
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
64.000
|
$1,000.000
|
$1,500.000
|
$625.000
|
$600.000
|
$38.500
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
16.800
|
$1,000.000
|
$800.000
|
$625.000
|
$700.000
|
$880.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
3,141.100
|
$140.000
|
$90.000
|
$80.020
|
$100.000
|
$72.600
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
86.000
|
$150.000
|
$150.000
|
$164.400
|
$200.000
|
$137.500
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
310.000
|
$150.000
|
$120.000
|
$81.250
|
$150.000
|
$99.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
25.000
|
$180.000
|
$145.000
|
$125.000
|
$200.000
|
$154.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$3,900.000
|
$7,500.000
|
$4,375.000
|
$6,000.000
|
$4,400.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$4,100.000
|
$7,500.000
|
$4,375.000
|
$7,000.000
|
$5,500.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
|
EA
|
2.000
|
$4,100.000
|
$8,000.000
|
$3,750.000
|
$7,500.000
|
$7,700.000
|
|
|
INLET (COMPL)(RWI)(TY II)
|
EA
|
3.000
|
$5,500.000
|
$20,000.000
|
$3,750.000
|
$15,000.000
|
$11,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,600.000
|
$2,000.000
|
$1,875.000
|
$5,000.000
|
$2,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,500.000
|
$2,500.000
|
$5,000.000
|
$6,000.000
|
$3,300.000
|
|
|
JACK BOR OR TUN PIPE(18 IN)(RC) (CL V)
|
LF
|
120.000
|
$600.000
|
$1,000.000
|
$713.750
|
$800.000
|
$130.900
|
|
|
JACK BOR OR TUN PIPE(24 IN)(RC)(CL V)
|
LF
|
45.000
|
$800.000
|
$1,200.000
|
$861.250
|
$1,000.000
|
$154.000
|
|
|
REMOV STR (SET)
|
EA
|
1.000
|
$600.000
|
$2,500.000
|
$625.000
|
$2,000.000
|
$550.000
|
|
|
REMOV STR (PIPE)
|
LF
|
4.000
|
$30.000
|
$750.000
|
$156.250
|
$100.000
|
$275.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$647,000.000
|
$600,000.000
|
$844,375.000
|
$830,000.000
|
$500,175.900
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$6,000.000
|
$12,000.000
|
$10,000.020
|
$4,000.000
|
$9,667.140
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
315.000
|
$7.000
|
$10.000
|
$9.040
|
$15.000
|
$10.720
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
315.000
|
$2.000
|
$5.000
|
$6.100
|
$7.500
|
$3.160
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
LF
|
152.000
|
$60.000
|
$20.000
|
$50.000
|
$30.000
|
$22.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$15,000.000
|
$11,000.000
|
$16,875.000
|
$15,000.000
|
$12,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$900.000
|
$850.000
|
$750.000
|
$1,500.000
|
$671.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
7.000
|
$700.000
|
$975.000
|
$750.000
|
$2,000.000
|
$830.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
1.000
|
$1,500.000
|
$1,550.000
|
$750.000
|
$2,000.000
|
$1,435.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,300.000
|
$600.000
|
$750.000
|
$2,000.000
|
$1,050.500
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$1,900.000
|
$3,300.000
|
$750.000
|
$2,000.000
|
$2,805.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
2.000
|
$2,800.000
|
$3,400.000
|
$1,250.000
|
$2,500.000
|
$2,750.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
4.000
|
$3,400.000
|
$5,300.000
|
$750.000
|
$2,000.000
|
$5,302.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
32.000
|
$40.000
|
$20.000
|
$125.000
|
$50.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
4.000
|
$40.000
|
$40.000
|
$125.000
|
$50.000
|
$44.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,770.000
|
$1.000
|
$1.200
|
$1.520
|
$1.500
|
$1.320
|
|
|
PAVEMENT SEALER 4"
|
LF
|
3,868.000
|
$0.500
|
$0.200
|
$0.270
|
$0.300
|
$0.220
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
95.000
|
$1.000
|
$0.600
|
$0.750
|
$1.000
|
$0.660
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
9,889.000
|
$1.000
|
$0.600
|
$0.770
|
$1.000
|
$0.660
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
9,883.000
|
$0.700
|
$0.600
|
$0.770
|
$1.000
|
$0.660
|
|
PREFAB PAV MRK TY B (W)(4")(BRK)
|
LF
|
152.000
|
$5.000
|
$7.250
|
$9.070
|
$20.000
|
$7.980
|
|
PREFAB PAV MRK TY B (W)(4")(SLD)
|
LF
|
1,858.000
|
$5.000
|
$7.250
|
$9.070
|
$15.000
|
$7.980
|
|
PREFAB PAV MRK TY B (Y)(4")(SLD)
|
LF
|
1,858.000
|
$5.000
|
$7.250
|
$9.080
|
$15.000
|
$7.980
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
213.000
|
$3.250
|
$3.500
|
$4.390
|
$5.000
|
$3.850
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
151.000
|
$5.000
|
$3.500
|
$4.390
|
$5.000
|
$3.850
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
5,077.000
|
$1.500
|
$1.000
|
$1.250
|
$1.500
|
$1.200
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
3,868.000
|
$1.000
|
$0.200
|
$0.270
|
$0.500
|
$0.220
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$20,000.000
|
$15,000.000
|
$18,750.000
|
$15,000.000
|
$23,909.580
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
14.000
|
$250.000
|
$950.000
|
$1,187.500
|
$400.000
|
$528.130
|
|
Totals: |
$6,507,228.950
|
$7,761,125.500
|
$8,040,357.287
|
$8,327,078.650
|
$8,398,574.413
|