PREPARING ROW
|
AC
|
13.510
|
$3,000.000
|
$2,304.000
|
$3,000.000
|
$3,533.150
|
$1,270.080
|
$7,500.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (1")
|
SY
|
26,270.000
|
$3.000
|
$6.500
|
$1.720
|
$0.780
|
$0.830
|
$3.300
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,000.000
|
$10.770
|
$10.500
|
$30.000
|
$23.200
|
$14.610
|
$13.000
|
|
|
EMBANKMENT (ORIGINAL)(ORD COMP)(TY B)
|
CY
|
33,140.000
|
$6.500
|
$18.000
|
$12.000
|
$13.130
|
$24.950
|
$25.720
|
|
|
BACKFILL (TY B)
|
STA
|
849.680
|
$165.000
|
$313.000
|
$230.000
|
$161.870
|
$237.650
|
$376.140
|
|
|
BLADING
|
HR
|
64.000
|
$150.000
|
$213.000
|
$300.000
|
$243.170
|
$207.320
|
$200.000
|
|
|
SPEC EXCAV WORK (BACKHOE)
|
HR
|
60.000
|
$150.000
|
$90.000
|
$300.000
|
$215.720
|
$112.370
|
$300.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(FNAL POS)
|
CY
|
105,904.000
|
$45.000
|
$31.000
|
$39.180
|
$44.690
|
$44.560
|
$49.960
|
|
|
REWORK BS MTL (TY B) (6") (DENS CONT)
|
STA
|
12.000
|
$1,000.000
|
$1,333.000
|
$1,200.000
|
$8,105.090
|
$4,442.130
|
$3,333.330
|
|
|
REWORK BS MTL (TY C)(7")(DENS CONT)
|
STA
|
739.180
|
$1,000.000
|
$383.000
|
$674.400
|
$356.300
|
$1,199.900
|
$603.912
|
|
|
PRIME COAT (RC-250)
|
GAL
|
79,303.000
|
$5.000
|
$8.000
|
$5.020
|
$4.630
|
$5.100
|
$4.460
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
89,877.000
|
$5.500
|
$6.500
|
$4.180
|
$4.770
|
$4.110
|
$3.590
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
3,110.000
|
$95.000
|
$108.000
|
$122.310
|
$142.550
|
$152.220
|
$165.110
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
2,299.000
|
$100.000
|
$146.000
|
$122.310
|
$134.330
|
$153.880
|
$183.530
|
|
|
AGGR(TY-PB GR-5 SAC-B)
|
CY
|
2,115.000
|
$110.000
|
$173.000
|
$122.310
|
$196.670
|
$218.170
|
$189.670
|
|
|
ASPH (AC 20-5TR OR CRS-1P)
|
GAL
|
105,738.000
|
$5.500
|
$7.000
|
$4.180
|
$3.990
|
$4.230
|
$3.450
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
84.000
|
$86.000
|
$109.000
|
$102.000
|
$243.840
|
$125.710
|
$367.116
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
9.000
|
$94.340
|
$230.000
|
$228.000
|
$477.380
|
$165.410
|
$550.500
|
|
|
CMP (GAL STL 48 IN)
|
LF
|
30.000
|
$170.000
|
$173.000
|
$273.600
|
$280.430
|
$198.490
|
$533.717
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
180.000
|
$500.000
|
$1,064.000
|
$660.000
|
$471.940
|
$727.810
|
$463.930
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
4.000
|
$960.000
|
$3,549.000
|
$3,000.000
|
$5,241.490
|
$992.460
|
$5,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
6.000
|
$6,400.000
|
$3,006.000
|
$5,472.000
|
$7,337.070
|
$8,998.330
|
$5,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$8,100.000
|
$8,440.000
|
$7,296.000
|
$9,359.190
|
$13,894.480
|
$5,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
10.000
|
$12,000.000
|
$5,707.000
|
$11,940.000
|
$7,234.600
|
$14,886.940
|
$5,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$2,500.000
|
$1,872.000
|
$2,280.000
|
$996.880
|
$1,323.280
|
$1,154.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$2,800.000
|
$2,556.000
|
$3,192.000
|
$1,043.430
|
$1,455.610
|
$1,567.600
|
|
|
SET (TY II) (24 IN) (CMP) (4: 1) (C)
|
EA
|
22.000
|
$3,000.000
|
$1,604.000
|
$2,280.000
|
$1,931.060
|
$1,654.100
|
$1,567.600
|
|
|
SET (TY II) (30 IN) (CMP) (4: 1) (C)
|
EA
|
8.000
|
$3,500.000
|
$2,086.000
|
$2,280.000
|
$2,217.660
|
$2,646.570
|
$2,128.600
|
|
|
SET (TY II) (33 IN) (CMP) (4: 1) (C)
|
EA
|
8.000
|
$4,000.000
|
$2,193.000
|
$3,192.000
|
$2,431.580
|
$3,308.210
|
$2,375.000
|
|
|
SET (TY II) (42 IN) (CMP) (3: 1) (C)
|
EA
|
6.000
|
$5,000.000
|
$2,213.000
|
$4,560.000
|
$2,912.790
|
$4,631.490
|
$3,672.500
|
|
|
SET (TY II) (48 IN) (CMP) (3: 1) (C)
|
EA
|
6.000
|
$5,200.000
|
$2,385.000
|
$5,040.000
|
$2,633.940
|
$5,293.130
|
$4,834.100
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
14.000
|
$2,008.330
|
$1,449.000
|
$3,000.000
|
$5,398.430
|
$2,646.570
|
$1,500.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
1.000
|
$7,611.440
|
$56,693.000
|
$6,000.000
|
$22,545.750
|
$9,924.630
|
$21,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,000,000.000
|
$230,000.000
|
$967,092.750
|
$1,084,533.700
|
$537,381.670
|
$1,565,316.304
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$8,000.000
|
$3,440.000
|
$7,794.000
|
$20,728.910
|
$22,053.210
|
$54,888.890
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
240.000
|
$35.000
|
$41.000
|
$24.200
|
$34.590
|
$52.930
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
240.000
|
$13.000
|
$11.000
|
$5.500
|
$14.530
|
$15.880
|
$50.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,110.000
|
$4.000
|
$6.000
|
$11.000
|
$4.540
|
$11.910
|
$9.900
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,110.000
|
$1.000
|
$3.000
|
$0.390
|
$1.560
|
$2.650
|
$2.200
|
|
|
CONSTRUCTING DETOURS
|
SY
|
254.000
|
$35.000
|
$102.000
|
$90.000
|
$82.040
|
$82.030
|
$112.130
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
60.000
|
$30.000
|
$136.000
|
$120.000
|
$50.570
|
$151.590
|
$30.270
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$30.000
|
$176.000
|
$180.000
|
$38.590
|
$152.050
|
$45.400
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
60.000
|
$15.000
|
$39.000
|
$180.000
|
$54.340
|
$48.480
|
$25.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$15.000
|
$59.000
|
$60.000
|
$40.750
|
$26.570
|
$25.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
60.000
|
$15.000
|
$39.000
|
$120.000
|
$54.340
|
$65.710
|
$30.270
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$15.000
|
$59.000
|
$120.000
|
$40.750
|
$39.140
|
$45.400
|
|
|
INTERSECTIONS (SURF TREAT)
|
SY
|
3,948.000
|
$35.000
|
$49.000
|
$36.000
|
$46.080
|
$30.940
|
$129.430
|
|
|
DRIVEWAYS AND TURNOUTS (SURF TREAT)
|
SY
|
7,733.000
|
$30.000
|
$36.000
|
$36.000
|
$33.840
|
$30.900
|
$35.560
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
81.000
|
$450.000
|
$626.000
|
$368.500
|
$598.510
|
$595.480
|
$495.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$450.000
|
$698.000
|
$495.000
|
$731.510
|
$727.810
|
$605.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
28.000
|
$44.000
|
$188.000
|
$38.500
|
$133.000
|
$132.330
|
$110.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
169,860.000
|
$0.180
|
$0.300
|
$0.310
|
$0.370
|
$0.290
|
$0.230
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
18,491.000
|
$0.450
|
$0.300
|
$0.330
|
$0.400
|
$0.340
|
$0.230
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
52,000.000
|
$0.230
|
$0.300
|
$0.330
|
$0.400
|
$0.290
|
$0.230
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
170,460.000
|
$0.680
|
$1.000
|
$0.720
|
$0.860
|
$0.790
|
$0.830
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
16.000
|
$6.630
|
$6.000
|
$22.000
|
$26.600
|
$6.220
|
$4.950
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
18,491.000
|
$0.690
|
$1.000
|
$0.830
|
$1.000
|
$1.320
|
$0.830
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
53,308.000
|
$0.740
|
$1.000
|
$0.720
|
$0.860
|
$0.790
|
$0.830
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
8,122.000
|
$1.000
|
$0.700
|
$2.400
|
$3.870
|
$1.900
|
$5.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
16.000
|
$5.490
|
$17.000
|
$16.500
|
$19.950
|
$8.200
|
$13.200
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
170,460.000
|
$0.500
|
$0.500
|
$0.350
|
$0.430
|
$0.500
|
$0.390
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
18,491.000
|
$0.300
|
$0.500
|
$0.390
|
$0.470
|
$0.530
|
$0.390
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
52,600.000
|
$0.500
|
$0.500
|
$0.390
|
$0.470
|
$0.500
|
$0.390
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,575.000
|
$2.650
|
$4.000
|
$3.300
|
$3.990
|
$3.970
|
$3.300
|
|
Totals: |
$10,710,570.050
|
$9,519,743.520
|
$10,089,270.772
|
$11,121,238.972
|
$11,698,754.125
|
$13,838,689.945
|