PREPARING ROW
|
STA
|
248.110
|
$400.000
|
$241.900
|
$219.910
|
$500.000
|
$185.000
|
$735.000
|
$1,000.000
|
$322.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
138.000
|
$12.000
|
$25.000
|
$15.000
|
$20.000
|
$20.000
|
$21.000
|
$20.000
|
$68.640
|
|
|
REMOV STAB BASE AND ASPH PAV (0"-12")
|
SY
|
1,276.000
|
$10.000
|
$20.000
|
$6.000
|
$15.000
|
$10.000
|
$15.750
|
$20.000
|
$8.050
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
388.000
|
$14.000
|
$10.000
|
$35.670
|
$15.000
|
$35.000
|
$21.000
|
$20.000
|
$24.170
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
221.110
|
$175.000
|
$300.000
|
$410.330
|
$375.000
|
$400.000
|
$630.000
|
$450.000
|
$277.710
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
1,783.000
|
$20.000
|
$20.000
|
$18.420
|
$15.000
|
$27.000
|
$15.750
|
$30.000
|
$39.320
|
|
|
BACKFILL (TY A)
|
STA
|
221.110
|
$130.000
|
$450.000
|
$605.210
|
$350.000
|
$350.000
|
$210.000
|
$200.000
|
$828.890
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
221.110
|
$125.000
|
$200.000
|
$466.660
|
$300.000
|
$200.000
|
$840.000
|
$200.000
|
$307.320
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
68,919.000
|
$0.280
|
$0.055
|
$0.040
|
$0.060
|
$0.160
|
$0.100
|
$0.500
|
$0.180
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
68,920.000
|
$0.280
|
$0.055
|
$0.040
|
$0.060
|
$0.160
|
$0.100
|
$0.500
|
$0.180
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
137,839.000
|
$0.280
|
$0.209
|
$0.200
|
$0.220
|
$0.290
|
$0.310
|
$0.500
|
$0.330
|
|
|
VEGETATIVE WATERING
|
MG
|
2,315.600
|
$9.500
|
$3.000
|
$3.270
|
$8.000
|
$22.000
|
$31.000
|
$20.000
|
$18.400
|
|
|
PROOF ROLLING
|
HR
|
3.000
|
$105.000
|
$100.000
|
$100.900
|
$100.000
|
$100.000
|
$157.500
|
$150.000
|
$177.830
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(7")
|
SY
|
6,749.000
|
$12.000
|
$18.000
|
$16.470
|
$15.000
|
$20.000
|
$17.850
|
$18.000
|
$32.350
|
|
|
AGGR(TY-PB GR-3 SAC-A)
|
CY
|
880.000
|
$95.000
|
$150.000
|
$159.720
|
$140.000
|
$135.000
|
$170.040
|
$185.000
|
$184.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
42,420.000
|
$3.300
|
$3.680
|
$4.400
|
$4.000
|
$3.480
|
$4.060
|
$6.000
|
$4.370
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
8,916.000
|
$90.000
|
$117.480
|
$88.110
|
$110.000
|
$97.000
|
$98.100
|
$85.000
|
$131.490
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(15")
|
SY
|
475.000
|
$50.000
|
$200.000
|
$275.280
|
$150.000
|
$135.000
|
$136.250
|
$145.000
|
$125.390
|
|
|
TEMPORARY SPL SHORING
|
SF
|
770.000
|
$20.000
|
$60.500
|
$64.000
|
$70.000
|
$55.000
|
$31.500
|
$42.000
|
$57.500
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
22.200
|
$450.000
|
$495.000
|
$450.000
|
$600.000
|
$650.000
|
$735.000
|
$550.000
|
$517.500
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
86.400
|
$350.000
|
$440.000
|
$450.000
|
$450.000
|
$575.000
|
$735.000
|
$550.000
|
$460.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
4.000
|
$350.000
|
$550.000
|
$600.000
|
$800.000
|
$750.000
|
$2,520.000
|
$850.000
|
$517.500
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
10.000
|
$500.000
|
$660.000
|
$650.000
|
$800.000
|
$850.000
|
$1,575.000
|
$950.000
|
$575.000
|
|
|
CONC BOX CULV (10 FT X 5 FT)(EXTEND)
|
LF
|
4.000
|
$1,750.000
|
$990.000
|
$1,000.000
|
$1,200.000
|
$1,600.000
|
$3,150.000
|
$1,500.000
|
$862.500
|
|
|
CONC BOX CULV (10 FT X 3 FT)(EXTEND)
|
LF
|
20.000
|
$1,500.000
|
$880.000
|
$800.000
|
$1,000.000
|
$1,500.000
|
$1,470.000
|
$1,000.000
|
$747.500
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
214.000
|
$39.000
|
$38.500
|
$50.000
|
$50.000
|
$50.000
|
$63.000
|
$85.000
|
$46.000
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
2.000
|
$5,000.000
|
$4,950.000
|
$5,500.000
|
$2,500.000
|
$5,000.000
|
$6,300.000
|
$9,500.000
|
$4,025.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
3.000
|
$7,250.000
|
$6,050.000
|
$6,500.000
|
$4,200.000
|
$6,000.000
|
$7,350.000
|
$9,500.000
|
$5,175.000
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
2.000
|
$8,500.000
|
$8,800.000
|
$8,000.000
|
$8,000.000
|
$11,000.000
|
$12,600.000
|
$12,000.000
|
$6,612.500
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
1.000
|
$9,000.000
|
$7,700.000
|
$14,000.000
|
$13,000.000
|
$16,000.000
|
$21,000.000
|
$15,000.000
|
$14,375.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
56.000
|
$575.000
|
$632.500
|
$650.000
|
$650.000
|
$800.000
|
$735.000
|
$1,250.000
|
$977.500
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$900.000
|
$907.500
|
$1,050.000
|
$1,000.000
|
$900.000
|
$1,050.000
|
$2,250.000
|
$1,121.250
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$1,800.000
|
$2,200.000
|
$2,000.000
|
$2,300.000
|
$2,500.000
|
$1,680.000
|
$3,200.000
|
$1,811.250
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$3,500.000
|
$3,960.000
|
$4,500.000
|
$5,000.000
|
$3,500.000
|
$4,200.000
|
$5,000.000
|
$5,175.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$1,500.000
|
$1,500.000
|
$1,500.000
|
$2,000.000
|
$2,000.000
|
$2,520.000
|
$1,500.000
|
$2,300.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
8.000
|
$750.000
|
$550.000
|
$750.000
|
$1,500.000
|
$2,000.000
|
$1,575.000
|
$2,500.000
|
$1,150.000
|
|
|
REMOV STR (PIPE)
|
LF
|
214.000
|
$15.000
|
$55.000
|
$15.000
|
$20.000
|
$20.000
|
$15.750
|
$40.000
|
$5.750
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$206,439.790
|
$200,000.000
|
$298,324.960
|
$150,000.000
|
$294,000.000
|
$330,000.000
|
$300,000.000
|
$314,383.250
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$2,500.000
|
$3,000.000
|
$6,010.000
|
$8,000.000
|
$22,000.000
|
$15,750.000
|
$8,500.000
|
$1,072.540
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
560.000
|
$32.000
|
$37.400
|
$37.000
|
$44.000
|
$32.700
|
$22.050
|
$30.000
|
$24.960
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
560.000
|
$10.000
|
$8.800
|
$6.000
|
$22.000
|
$11.610
|
$8.400
|
$15.000
|
$6.450
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,640.000
|
$2.700
|
$3.300
|
$2.500
|
$2.750
|
$2.880
|
$1.770
|
$4.000
|
$3.310
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,640.000
|
$1.200
|
$1.100
|
$0.750
|
$1.000
|
$0.740
|
$0.530
|
$2.000
|
$0.850
|
|
|
INTERSECTIONS (SURF TREAT)
|
SY
|
718.000
|
$25.000
|
$60.000
|
$61.660
|
$19.000
|
$17.000
|
$21.000
|
$42.000
|
$122.700
|
|
|
DRIVEWAYS (CONC)
|
SY
|
70.000
|
$100.000
|
$110.000
|
$95.000
|
$90.000
|
$115.000
|
$126.000
|
$125.000
|
$97.750
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,124.000
|
$30.000
|
$60.000
|
$29.770
|
$50.000
|
$60.000
|
$52.500
|
$42.000
|
$76.340
|
|
|
TURNOUTS (ACP)
|
SY
|
371.000
|
$50.000
|
$55.000
|
$71.860
|
$50.000
|
$67.000
|
$84.000
|
$42.000
|
$115.770
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
49,622.000
|
$0.130
|
$0.140
|
$0.160
|
$0.150
|
$0.190
|
$0.150
|
$0.500
|
$0.130
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
22,111.000
|
$0.130
|
$0.160
|
$0.200
|
$0.150
|
$0.180
|
$0.150
|
$0.500
|
$0.150
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
800.000
|
$23.000
|
$23.100
|
$19.500
|
$23.000
|
$19.500
|
$20.480
|
$35.000
|
$24.090
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,725.000
|
$2,200.000
|
$2,210.000
|
$2,200.000
|
$1,550.000
|
$1,974.660
|
$1,850.000
|
$2,432.250
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
700.000
|
$2.750
|
$2.200
|
$1.990
|
$2.200
|
$1.990
|
$2.090
|
$3.000
|
$5.750
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,300.000
|
$2,750.000
|
$2,425.000
|
$2,750.000
|
$2,425.000
|
$2,546.250
|
$2,850.000
|
$2,871.550
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$275.000
|
$220.000
|
$250.000
|
$220.000
|
$250.000
|
$262.500
|
$1,500.000
|
$345.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 4
|
EA
|
22.000
|
$240.000
|
$225.500
|
$205.000
|
$275.000
|
$215.000
|
$225.750
|
$650.000
|
$235.750
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 4
|
EA
|
4.000
|
$400.000
|
$451.000
|
$410.000
|
$520.000
|
$405.000
|
$414.750
|
$650.000
|
$471.500
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
2.200
|
$35.000
|
$24.200
|
$22.000
|
$350.000
|
$35.000
|
$19.950
|
$100.000
|
$25.300
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$500.000
|
$462.000
|
$420.000
|
$570.000
|
$500.000
|
$456.750
|
$650.000
|
$483.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
54.000
|
$425.000
|
$379.500
|
$345.000
|
$465.000
|
$420.000
|
$574.350
|
$550.000
|
$396.750
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
10.000
|
$250.000
|
$577.500
|
$525.000
|
$565.000
|
$520.000
|
$590.100
|
$450.000
|
$603.750
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
24.000
|
$24.000
|
$22.000
|
$23.000
|
$22.000
|
$23.000
|
$24.150
|
$100.000
|
$27.600
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
18.000
|
$45.000
|
$60.500
|
$55.000
|
$50.000
|
$65.000
|
$47.250
|
$100.000
|
$63.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
6,822.000
|
$1.400
|
$1.000
|
$2.250
|
$1.100
|
$1.000
|
$1.440
|
$5.000
|
$1.110
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
122.000
|
$5.300
|
$7.700
|
$7.000
|
$6.000
|
$7.400
|
$7.350
|
$20.000
|
$8.510
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
4.000
|
$125.000
|
$120.000
|
$110.000
|
$200.000
|
$129.000
|
$130.200
|
$250.000
|
$148.350
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
1.000
|
$450.000
|
$660.000
|
$600.000
|
$700.000
|
$1,000.000
|
$997.500
|
$850.000
|
$1,150.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
50,639.000
|
$0.290
|
$0.390
|
$0.350
|
$0.500
|
$0.440
|
$0.500
|
$0.800
|
$0.510
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
6,320.000
|
$0.290
|
$0.500
|
$0.450
|
$0.660
|
$0.520
|
$0.550
|
$0.800
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
22,184.000
|
$0.290
|
$0.390
|
$0.350
|
$0.570
|
$0.440
|
$0.500
|
$0.800
|
$0.510
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
733.000
|
$2.950
|
$4.500
|
$4.080
|
$4.000
|
$3.950
|
$4.730
|
$15.000
|
$4.540
|
|
|
ELIM EXT PAV MRK & MRKS (RR XING)
|
EA
|
1.000
|
$125.000
|
$137.000
|
$125.000
|
$385.000
|
$250.000
|
$236.250
|
$500.000
|
$287.500
|
|
|
FULL - WIDTH MOWING
|
CYC
|
1.000
|
$2,500.000
|
$3,500.000
|
$1,750.000
|
$25,000.000
|
$3,500.000
|
$4,200.000
|
$3,000.000
|
$11,766.460
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
6,550.000
|
$2.000
|
$1.400
|
$2.930
|
$3.000
|
$2.000
|
$2.000
|
$8.250
|
$4.460
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
388.000
|
$100.000
|
$85.000
|
$64.430
|
$100.000
|
$100.000
|
$105.000
|
$150.000
|
$19.660
|
|
|
TMA (STATIONARY)
|
DAY
|
192.000
|
$175.000
|
$130.000
|
$200.000
|
$200.000
|
$210.000
|
$420.000
|
$500.000
|
$518.760
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
40.000
|
$75.000
|
$65.000
|
$100.000
|
$50.000
|
$100.000
|
$73.500
|
$850.000
|
$97.060
|
|
Totals: |
$2,288,837.640
|
$2,841,097.835
|
$2,846,865.424
|
$2,850,341.200
|
$2,945,853.430
|
$3,369,009.780
|
$3,517,360.900
|
$3,600,761.811
|