REMOVING CONC (RIPRAP)
|
SY
|
467.000
|
$35.000
|
$25.000
|
$20.000
|
$100.000
|
$33.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
18.000
|
$30.000
|
$25.000
|
$50.000
|
$100.000
|
$110.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
30.000
|
$20.000
|
$25.000
|
$40.000
|
$100.000
|
$110.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
78.000
|
$35.000
|
$50.000
|
$15.000
|
$200.000
|
$220.000
|
|
|
BLOCK SODDING
|
SY
|
692.000
|
$10.000
|
$6.000
|
$5.000
|
$10.000
|
$5.450
|
|
|
VEGETATIVE WATERING
|
MG
|
6.000
|
$10.000
|
$200.000
|
$15.000
|
$500.000
|
$550.000
|
|
|
CEM STABIL BKFL
|
CY
|
179.000
|
$175.000
|
$300.000
|
$100.000
|
$360.000
|
$247.500
|
|
|
FLOWABLE BACKFILL
|
CY
|
41.000
|
$250.000
|
$300.000
|
$200.000
|
$400.000
|
$286.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
700.000
|
$50.000
|
$200.000
|
$240.000
|
$90.000
|
$125.000
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
5.000
|
$225.000
|
$450.000
|
$150.000
|
$800.000
|
$250.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
1,103.000
|
$220.000
|
$235.000
|
$500.000
|
$220.000
|
$267.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
2.000
|
$500.000
|
$800.000
|
$1,000.000
|
$4,000.000
|
$3,300.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,277.000
|
$150.000
|
$125.000
|
$110.000
|
$300.000
|
$192.500
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
24.000
|
$175.000
|
$145.000
|
$200.000
|
$340.000
|
$203.500
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
70.000
|
$450.000
|
$650.000
|
$450.000
|
$1,000.000
|
$715.000
|
|
|
ELASTOMERIC BEARING (LAMINATED)
|
EA
|
10.000
|
$500.000
|
$3,000.000
|
$1,000.000
|
$5,000.000
|
$650.000
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
178.000
|
$30.000
|
$22.000
|
$50.000
|
$40.000
|
$65.000
|
|
|
RESIZING AND SEALING JOINTS
|
LF
|
72.000
|
$40.000
|
$65.000
|
$100.000
|
$76.000
|
$95.000
|
|
|
STR STEEL (MISCELLANEOUS BRIDGE)
|
LB
|
1,660.000
|
$8.000
|
$15.000
|
$35.000
|
$25.000
|
$30.000
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM III-A)
|
LS
|
1.000
|
$77,250.000
|
$135,000.000
|
$150,000.000
|
$110,000.000
|
$123,000.000
|
|
|
RETROFIT RAIL (TY T223)
|
LF
|
394.000
|
$200.000
|
$300.000
|
$280.000
|
$450.000
|
$247.500
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
60.000
|
$340.000
|
$600.000
|
$500.000
|
$700.000
|
$675.000
|
|
|
JOINT SEALANT
|
LF
|
178.000
|
$25.000
|
$40.000
|
$15.000
|
$30.000
|
$50.000
|
|
|
GABIONS (GALV)
|
CY
|
187.000
|
$250.000
|
$750.000
|
$300.000
|
$400.000
|
$473.000
|
|
|
PIPE (PVC) (SCH 40) (3 IN)
|
LF
|
12.000
|
$40.000
|
$100.000
|
$25.000
|
$50.000
|
$600.000
|
|
|
RAISING EXIST STRUCT
|
LS
|
1.000
|
$15,000.000
|
$85,000.000
|
$120,000.000
|
$100,000.000
|
$16,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$151,510.000
|
$225,000.000
|
$238,000.000
|
$200,000.000
|
$275,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
21.000
|
$10,000.000
|
$2,200.000
|
$2,500.000
|
$2,000.000
|
$12,500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 3)
|
SY
|
1,000.000
|
$30.000
|
$20.000
|
$30.000
|
$20.000
|
$28.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,000.000
|
$8.000
|
$12.000
|
$10.000
|
$8.000
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,400.000
|
$5.000
|
$3.000
|
$3.500
|
$11.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,400.000
|
$1.000
|
$1.000
|
$0.500
|
$1.000
|
$0.750
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
5.000
|
$5,000.000
|
$3,500.000
|
$5,000.000
|
$8,000.000
|
$7,700.000
|
|
|
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
540.000
|
$10.000
|
$7.250
|
$25.000
|
$30.000
|
$7.000
|
|
|
PTB(STKPL)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
810.000
|
$10.000
|
$15.000
|
$90.000
|
$50.000
|
$28.000
|
|
|
PTB(DES SRCE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
810.000
|
$30.000
|
$15.000
|
$90.000
|
$70.000
|
$40.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
18.000
|
$100.000
|
$250.000
|
$300.000
|
$72.000
|
$660.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
387.500
|
$30.000
|
$30.000
|
$30.000
|
$30.000
|
$29.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,000.000
|
$2,300.000
|
$2,000.000
|
$3,000.000
|
$1,952.500
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$3.000
|
$6.000
|
$10.000
|
$12.000
|
$165.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$300.000
|
$200.000
|
$500.000
|
$1,000.000
|
$165.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,750.000
|
$3,200.000
|
$4,000.000
|
$4,000.000
|
$3,382.500
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$250.000
|
$270.000
|
$1,000.000
|
$220.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,500.000
|
$1,416.750
|
$2,000.000
|
$3,000.000
|
$2,200.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
3.000
|
$850.000
|
$687.000
|
$2,000.000
|
$2,000.000
|
$1,650.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
3.000
|
$10,000.000
|
$7,550.000
|
$10,000.000
|
$11,000.000
|
$11,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
14.000
|
$20.000
|
$30.000
|
$25.000
|
$27.000
|
$16.500
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
17.000
|
$20.000
|
$30.000
|
$20.000
|
$45.000
|
$27.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF(BI)
|
EA
|
20.000
|
$30.000
|
$137.250
|
$30.000
|
$45.000
|
$165.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
10,370.000
|
$3.000
|
$1.000
|
$1.000
|
$3.750
|
$1.050
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
10,530.000
|
$3.000
|
$1.000
|
$1.000
|
$3.750
|
$1.050
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
30.000
|
$8.000
|
$22.000
|
$15.000
|
$22.500
|
$22.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
1,310.000
|
$0.500
|
$1.200
|
$1.000
|
$6.000
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
10,280.000
|
$0.500
|
$1.200
|
$1.000
|
$3.000
|
$1.100
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
66.000
|
$3.000
|
$16.000
|
$6.000
|
$22.500
|
$16.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
11,350.000
|
$1.000
|
$1.200
|
$1.000
|
$1.050
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
11,590.000
|
$0.200
|
$0.650
|
$1.000
|
$0.380
|
$0.610
|
|
|
REMOVAL OF CONDUIT
|
LF
|
84.000
|
$8.000
|
$5.000
|
$15.000
|
$7.500
|
$80.000
|
|
|
JT / CRCK ROUT / SEAL(RUBBER - ASPHALT)
|
LF
|
3,094.000
|
$15.000
|
$2.500
|
$5.000
|
$20.000
|
$3.300
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
8.000
|
$500.000
|
$650.000
|
$200.000
|
$1,000.000
|
$1,100.000
|
|
|
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
|
LF
|
10.000
|
$50.000
|
$155.000
|
$100.000
|
$100.000
|
$150.000
|
|
|
REP STL BRIDGE MEMBER (BEARINGS)
|
EA
|
10.000
|
$250.000
|
$3,000.000
|
$15,000.000
|
$3,400.000
|
$1,750.000
|
|
|
CARBON FIBER REINF POLYMER PROTECTION
|
SF
|
90.000
|
$125.000
|
$115.000
|
$90.000
|
$250.000
|
$205.000
|
|
|
REPLACE ELASTOMERIC BEARING PADS
|
EA
|
5.000
|
$3,000.000
|
$10,000.000
|
$3,500.000
|
$10,000.000
|
$5,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$10,000.000
|
$1,500.000
|
$10,000.000
|
$12,000.000
|
$18,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
216.000
|
$200.000
|
$220.000
|
$250.000
|
$250.000
|
$230.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
5.000
|
$300.000
|
$128.000
|
$500.000
|
$1,800.000
|
$1,100.000
|
|
|
REML & DESPL DRIFTWOOD & DEBRIS-SITE 1
|
LS
|
1.000
|
$2,000.000
|
$15,000.000
|
$3,000.000
|
$25,000.000
|
$15,000.000
|
|
|
REML & DESPL DRIFTWOOD & DEBRIS-SITE 2
|
LS
|
1.000
|
$2,000.000
|
$15,000.000
|
$3,000.000
|
$25,000.000
|
$15,000.000
|
|
|
REML & DESPL DRIFTWOOD & DEBRIS-SITE 3
|
LS
|
1.000
|
$5,000.000
|
$15,000.000
|
$3,000.000
|
$20,000.000
|
$139,000.000
|
|
|
REML & DESPL DRIFTWOOD & DEBRIS-SITE 4
|
LS
|
1.000
|
$1,000.000
|
$15,000.000
|
$3,000.000
|
$30,000.000
|
$215,000.000
|
|
Totals: |
$1,666,573.000
|
$1,994,205.000
|
$2,484,371.000
|
$2,640,442.700
|
$2,776,648.500
|