PREPARING ROW
|
STA
|
138.580
|
$2,300.000
|
$677.330
|
$2,243.000
|
$5,755.000
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
331.000
|
$32.500
|
$12.720
|
$65.000
|
$50.000
|
|
|
RMV (0"-6") TRT/UNTRT BASE & ASPH PAV
|
SY
|
2,838.000
|
$12.000
|
$14.500
|
$19.000
|
$20.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
9,683.000
|
$20.000
|
$18.000
|
$12.000
|
$20.000
|
|
|
EXCAV (CHANNEL)
|
CY
|
12.000
|
$80.000
|
$170.400
|
$65.000
|
$50.000
|
|
|
EMBANK (FNL)(OC)(TY B)
|
CY
|
15,601.000
|
$24.000
|
$21.400
|
$25.000
|
$35.000
|
|
|
EMBANK (VEH)(OC)(TY B)
|
CY
|
49.000
|
$51.670
|
$83.350
|
$45.000
|
$50.000
|
|
|
BACKFILL (TY A)
|
STA
|
7.960
|
$355.000
|
$333.210
|
$1,000.000
|
$250.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
7.960
|
$250.000
|
$365.380
|
$870.000
|
$250.000
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
58,053.000
|
$0.160
|
$0.140
|
$0.140
|
$0.500
|
|
|
BROADCAST SEED (TEMP_COOL)
|
SY
|
58,053.000
|
$0.160
|
$0.140
|
$0.140
|
$0.500
|
|
|
STRAW/HAY MLCH SEED(PERM_RURAL_CLAY)
|
SY
|
116,106.000
|
$0.450
|
$0.410
|
$0.430
|
$0.500
|
|
|
VEGETATIVE WATERING
|
TGL
|
697.000
|
$42.000
|
$67.450
|
$60.000
|
$30.000
|
|
|
SOIL RET BLKT(SL_STEEP_CLAY_LONG)
|
SY
|
200.000
|
$5.500
|
$4.240
|
$4.300
|
$15.000
|
|
|
SOIL RET BLKT(CHAN_TEMP_2 PSF)
|
SY
|
200.000
|
$4.500
|
$5.300
|
$5.500
|
$15.000
|
|
|
PROOF ROLLING
|
HR
|
11.130
|
$215.000
|
$238.620
|
$211.000
|
$150.000
|
|
|
REWORK BS MTL (TY B)(8")(ORD COMP)
|
SY
|
28,798.000
|
$6.500
|
$9.780
|
$6.000
|
$6.000
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
20,002.000
|
$119.000
|
$118.910
|
$141.000
|
$140.000
|
|
|
D-GR HMA TY-D PG64-22 (LEVEL-UP)
|
TON
|
500.000
|
$190.000
|
$159.540
|
$190.000
|
$200.000
|
|
|
SP MIXES SP-C SAC-A PG64-22
|
TON
|
9,194.000
|
$124.000
|
$128.020
|
$150.000
|
$160.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
500.000
|
$85.000
|
$80.370
|
$130.000
|
$88.000
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
4,201.000
|
$3.500
|
$8.490
|
$4.400
|
$10.000
|
|
|
CUT & RESTORING PAV
|
SY
|
97.000
|
$225.000
|
$106.000
|
$245.000
|
$200.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
164.000
|
$360.000
|
$265.000
|
$385.000
|
$350.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
212.000
|
$12.000
|
$15.900
|
$13.200
|
$10.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,742.000
|
$52.000
|
$79.500
|
$33.000
|
$25.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
12.000
|
$950.000
|
$689.000
|
$935.000
|
$550.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
120.000
|
$715.000
|
$689.000
|
$1,045.000
|
$550.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
85.000
|
$240.000
|
$265.000
|
$192.000
|
$165.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
200.000
|
$200.000
|
$302.100
|
$313.000
|
$185.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
116.000
|
$1,100.000
|
$477.000
|
$990.000
|
$850.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
40.000
|
$1,308.000
|
$1,060.000
|
$1,045.000
|
$1,250.000
|
|
|
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
|
LF
|
12.000
|
$1,650.000
|
$1,484.000
|
$1,320.000
|
$2,000.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,244.000
|
$90.000
|
$53.000
|
$71.500
|
$80.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
442.000
|
$110.000
|
$95.400
|
$176.000
|
$125.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
20.000
|
$147.000
|
$121.900
|
$275.000
|
$165.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
4.000
|
$12,184.380
|
$9,010.000
|
$7,700.000
|
$8,500.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 36 IN)
|
EA
|
1.000
|
$19,800.000
|
$12,720.000
|
$12,100.000
|
$12,500.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
4.000
|
$23,000.000
|
$29,680.000
|
$27,500.000
|
$35,000.000
|
|
|
WINGWALL (PW - 2) (HW=9 FT)
|
EA
|
2.000
|
$30,000.000
|
$37,100.000
|
$44,000.000
|
$45,000.000
|
|
|
WINGWALL (PW - 2) (HW=10 FT)
|
EA
|
3.000
|
$45,000.000
|
$50,880.000
|
$63,824.000
|
$55,000.000
|
|
|
WINGWALL (PW - 2) (HW=11 FT)
|
EA
|
1.000
|
$55,000.000
|
$58,300.000
|
$68,200.000
|
$65,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
76.000
|
$1,200.000
|
$901.000
|
$1,100.000
|
$1,250.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
26.000
|
$1,965.000
|
$1,696.000
|
$2,750.000
|
$2,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$3,350.000
|
$3,816.000
|
$4,400.000
|
$3,500.000
|
|
|
THERMOPLASTIC PIPE (PP) (30")
|
LF
|
100.000
|
$175.000
|
$121.900
|
$248.000
|
$500.000
|
|
|
REMOV & RE - LAY PIPE (18 IN)
|
LF
|
4.000
|
$75.000
|
$31.800
|
$110.000
|
$500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$3,500.000
|
$1,272.000
|
$2,750.000
|
$1,500.000
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$320.370
|
$212.000
|
$825.000
|
$500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
6.000
|
$1,600.000
|
$1,060.000
|
$2,750.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,449.000
|
$23.500
|
$10.600
|
$55.000
|
$50.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$720,797.000
|
$382,303.640
|
$932,989.000
|
$900,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$9,000.000
|
$22,381.670
|
$27,000.000
|
$12,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$17,000.000
|
$8,979.100
|
$12,000.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
122.000
|
$218.750
|
$529.900
|
$390.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
31.000
|
$512.500
|
$1,005.940
|
$1.000
|
$550.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
480.000
|
$48.460
|
$53.000
|
$60.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
480.000
|
$15.430
|
$12.720
|
$13.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
300.000
|
$4.760
|
$5.300
|
$5.500
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
300.000
|
$1.410
|
$1.060
|
$1.100
|
$2.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
259.000
|
$115.540
|
$106.000
|
$275.000
|
$100.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
262.000
|
$63.000
|
$65.030
|
$140.000
|
$55.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
1,760.000
|
$16.000
|
$51.180
|
$36.000
|
$40.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
27,716.000
|
$0.450
|
$0.210
|
$0.340
|
$0.500
|
|
|
FILL MILLED ASPH RUMBLE STRIPS (SHLDR)
|
LF
|
1,440.000
|
$0.500
|
$5.080
|
$6.430
|
$5.000
|
|
|
FILL MILLED ASPH RMBL STRIP(CENTERLINE)
|
LF
|
1,440.000
|
$8.870
|
$5.080
|
$6.420
|
$5.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,475.000
|
$32.350
|
$28.620
|
$32.000
|
$35.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$3,250.000
|
$3,153.500
|
$3,600.000
|
$3,520.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
4.000
|
$720.000
|
$212.000
|
$765.000
|
$1,150.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
11.000
|
$340.000
|
$318.000
|
$346.000
|
$1,150.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
7.000
|
$390.000
|
$530.000
|
$390.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
23.000
|
$730.000
|
$1,590.000
|
$720.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$890.000
|
$1,590.000
|
$875.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$1,051.000
|
$1,590.000
|
$1,200.000
|
$1,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
33.000
|
$146.000
|
$212.000
|
$87.000
|
$500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
16.000
|
$66.740
|
$32.860
|
$28.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
22.000
|
$89.090
|
$79.500
|
$60.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
53,248.000
|
$0.560
|
$0.210
|
$0.220
|
$0.650
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
96.000
|
$6.000
|
$1.060
|
$1.100
|
$20.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
54,718.000
|
$0.540
|
$0.210
|
$0.220
|
$0.650
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
6,060.000
|
$2.300
|
$2.400
|
$1.200
|
$6.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
638.000
|
$4.250
|
$1.270
|
$1.300
|
$6.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
96.000
|
$18.000
|
$8.480
|
$8.800
|
$20.000
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
24.000
|
$193.970
|
$153.700
|
$160.000
|
$250.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
2.000
|
$246.380
|
$174.900
|
$181.000
|
$250.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
4.000
|
$76.000
|
$106.000
|
$110.000
|
$150.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
|
LF
|
72.000
|
$0.780
|
$1.060
|
$1.100
|
$3.000
|
|
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
|
LF
|
26,712.000
|
$0.780
|
$0.660
|
$0.680
|
$0.650
|
|
REFL PAV MRK TY I (Y)6"(BRK)(090MIL)
|
LF
|
6,556.000
|
$0.750
|
$0.660
|
$0.680
|
$0.650
|
|
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
|
LF
|
27,952.000
|
$0.800
|
$0.660
|
$0.680
|
$0.650
|
|
REFL PAV MRKR TY I-C
|
EA
|
37.000
|
$6.360
|
$5.300
|
$5.500
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
656.000
|
$5.470
|
$5.300
|
$5.500
|
$6.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
5.000
|
$5.750
|
$5.300
|
$5.500
|
$6.000
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
119,808.000
|
$0.900
|
$0.270
|
$0.280
|
$0.650
|
|
|
UNDERSEAL COURSE
|
GAL
|
20,893.000
|
$5.800
|
$6.000
|
$8.000
|
$4.500
|
|
|
REINFORMT GRID FOR ASPH PVMT (TY II)
|
LF
|
26,124.000
|
$7.700
|
$7.430
|
$10.000
|
$6.000
|
|
Totals: |
$8,048,585.920
|
$7,646,072.848
|
$9,346,062.590
|
$9,799,565.000
|