REMOVING CONC (DRIVEWAYS)
|
SY
|
2,668.000
|
$22.000
|
$25.000
|
$23.200
|
$26.990
|
$50.000
|
$30.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
357.000
|
$20.000
|
$20.000
|
$32.000
|
$25.770
|
$50.000
|
$30.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
4,683.000
|
$10.000
|
$20.000
|
$10.000
|
$21.320
|
$50.000
|
$30.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
320.000
|
$50.000
|
$25.000
|
$45.000
|
$47.390
|
$100.000
|
$100.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
320.000
|
$50.000
|
$25.000
|
$48.000
|
$50.390
|
$100.000
|
$100.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
8,395.000
|
$9.000
|
$3.000
|
$9.000
|
$13.180
|
$20.000
|
$20.000
|
|
|
BLOCK SODDING
|
SY
|
8,395.000
|
$9.000
|
$8.000
|
$11.000
|
$7.810
|
$10.000
|
$20.000
|
|
|
VEGETATIVE WATERING
|
MG
|
121.400
|
$50.000
|
$1.000
|
$28.800
|
$228.140
|
$100.000
|
$15.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
600.000
|
$5.000
|
$13.000
|
$25.000
|
$10.790
|
$20.000
|
$50.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
2,578.000
|
$150.000
|
$90.000
|
$160.000
|
$107.710
|
$220.000
|
$125.000
|
|
|
CL A CONC (MISC)
|
CY
|
40.000
|
$600.000
|
$900.000
|
$744.000
|
$732.890
|
$2,000.000
|
$1,200.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
66.000
|
$750.000
|
$900.000
|
$700.000
|
$859.300
|
$650.000
|
$1,000.000
|
|
|
RAIL (HANDRAIL)(TY E)
|
LF
|
1,264.000
|
$200.000
|
$165.000
|
$128.000
|
$192.920
|
$250.000
|
$200.000
|
|
|
GRATE & FRAME
|
EA
|
8.000
|
$2,600.000
|
$3,000.000
|
$1,980.000
|
$3,748.940
|
$8,500.000
|
$3,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$350,000.000
|
$480,000.000
|
$300,000.000
|
$525,505.740
|
$680,000.000
|
$690,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$15,000.000
|
$4,000.000
|
$6,370.000
|
$8,457.150
|
$8,500.000
|
$30,000.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
500.000
|
$7.000
|
$0.010
|
$30.000
|
$22.260
|
$10.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,550.000
|
$8.000
|
$0.010
|
$7.000
|
$6.950
|
$4.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,550.000
|
$1.000
|
$0.010
|
$3.000
|
$1.550
|
$2.000
|
$5.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
4,000.000
|
$12.000
|
$0.010
|
$7.000
|
$9.780
|
$18.000
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,000.000
|
$1.000
|
$0.010
|
$3.000
|
$2.020
|
$9.000
|
$6.000
|
|
|
COLORED TEXTURED CONC (4")
|
SY
|
45.000
|
$150.000
|
$190.000
|
$96.000
|
$111.100
|
$250.000
|
$200.000
|
|
|
CONC CURB (TY II)
|
LF
|
66.000
|
$30.000
|
$42.000
|
$56.000
|
$46.410
|
$55.000
|
$60.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
388.000
|
$60.000
|
$50.000
|
$38.000
|
$52.850
|
$65.000
|
$60.000
|
|
|
CONC CURB (TY C1)
|
LF
|
51.000
|
$150.000
|
$270.000
|
$120.000
|
$128.460
|
$100.000
|
$165.000
|
|
|
CONC CURB (TY F1)
|
LF
|
1,220.000
|
$120.000
|
$125.000
|
$90.000
|
$162.390
|
$100.000
|
$150.000
|
|
|
CONC CURB (TY F3)
|
LF
|
95.000
|
$200.000
|
$300.000
|
$169.000
|
$226.380
|
$100.000
|
$250.000
|
|
|
CONC CURB & GUTTER (SLOTTED)
|
LF
|
6,189.000
|
$55.000
|
$45.000
|
$42.000
|
$40.610
|
$85.000
|
$70.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
7,898.000
|
$115.000
|
$120.000
|
$101.000
|
$158.020
|
$105.000
|
$140.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
13,913.000
|
$90.000
|
$105.000
|
$64.000
|
$66.260
|
$75.000
|
$116.800
|
|
|
CONC SIDEWALKS (5")
|
SY
|
220.000
|
$97.000
|
$105.000
|
$77.000
|
$66.400
|
$85.000
|
$125.000
|
|
|
CURB RAMPS (TY 1)
|
SY
|
489.000
|
$175.000
|
$140.000
|
$174.000
|
$153.010
|
$325.000
|
$200.000
|
|
|
CURB RAMPS (TY 2)
|
SY
|
69.000
|
$175.000
|
$140.000
|
$200.000
|
$135.290
|
$325.000
|
$220.000
|
|
|
CURB RAMPS (TY 3)
|
SY
|
17.000
|
$175.000
|
$140.000
|
$290.000
|
$209.380
|
$325.000
|
$220.000
|
|
|
CURB RAMPS (TY 5)
|
SY
|
22.000
|
$175.000
|
$140.000
|
$270.000
|
$170.500
|
$325.000
|
$220.000
|
|
|
CURB RAMPS (TY 6)
|
SY
|
10.000
|
$175.000
|
$140.000
|
$308.000
|
$202.870
|
$325.000
|
$220.000
|
|
|
CURB RAMPS (TY 7)
|
SY
|
537.000
|
$175.000
|
$140.000
|
$153.000
|
$125.510
|
$325.000
|
$200.000
|
|
|
CURB RAMPS (TY 10)
|
SY
|
105.000
|
$175.000
|
$14.000
|
$176.000
|
$141.660
|
$325.000
|
$200.000
|
|
|
CURB RAMPS (TY 21)
|
SY
|
27.000
|
$175.000
|
$140.000
|
$262.000
|
$145.290
|
$325.000
|
$200.000
|
|
|
CURB RAMPS (TY 22)
|
SY
|
91.000
|
$175.000
|
$140.000
|
$178.000
|
$267.740
|
$325.000
|
$200.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE A)
|
SY
|
36.000
|
$250.000
|
$1,600.000
|
$424.000
|
$640.470
|
$150.000
|
$350.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
788.000
|
$35.000
|
$35.000
|
$32.000
|
$52.870
|
$45.000
|
$35.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$1,200.000
|
$2,500.000
|
$1,600.000
|
$1,692.840
|
$2,500.000
|
$1,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
777.000
|
$5.000
|
$10.000
|
$4.000
|
$3.030
|
$6.000
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
10.000
|
$250.000
|
$500.000
|
$400.000
|
$1,888.430
|
$650.000
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$2,700.000
|
$3,500.000
|
$3,200.000
|
$3,617.690
|
$4,000.000
|
$3,350.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
1.000
|
$260.000
|
$165.000
|
$400.000
|
$641.970
|
$850.000
|
$350.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
300.000
|
$18.000
|
$25.000
|
$26.240
|
$20.230
|
$100.000
|
$15.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
300.000
|
$2.000
|
$3.500
|
$3.460
|
$3.370
|
$10.000
|
$2.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
5.000
|
$900.000
|
$300.000
|
$720.000
|
$1,293.570
|
$1,850.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
3.000
|
$1,100.000
|
$400.000
|
$1,200.000
|
$1,396.090
|
$1,850.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
17.000
|
$1,100.000
|
$350.000
|
$800.000
|
$1,504.000
|
$1,850.000
|
$1,150.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
41.000
|
$100.000
|
$55.000
|
$240.000
|
$166.910
|
$850.000
|
$100.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,759.000
|
$2.000
|
$1.750
|
$1.840
|
$2.160
|
$6.000
|
$1.600
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
774.000
|
$4.000
|
$3.300
|
$3.450
|
$4.050
|
$8.000
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,693.000
|
$10.000
|
$7.500
|
$7.760
|
$9.100
|
$15.000
|
$6.750
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
63.000
|
$40.000
|
$6.000
|
$6.330
|
$7.420
|
$50.000
|
$5.500
|
|
|
PAVEMENT SEALER 8"
|
LF
|
2,759.000
|
$1.000
|
$0.350
|
$0.380
|
$0.450
|
$3.000
|
$0.330
|
|
|
PAVEMENT SEALER 12"
|
LF
|
774.000
|
$3.000
|
$0.600
|
$0.630
|
$0.740
|
$3.000
|
$0.550
|
|
|
PAVEMENT SEALER 24"
|
LF
|
2,693.000
|
$5.000
|
$1.100
|
$1.150
|
$1.350
|
$6.000
|
$1.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
63.000
|
$10.000
|
$20.000
|
$20.700
|
$24.280
|
$15.000
|
$18.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
556.000
|
$1.000
|
$1.500
|
$1.480
|
$1.740
|
$3.000
|
$1.290
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
1,739.000
|
$1.000
|
$2.200
|
$2.300
|
$2.700
|
$4.000
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
296.000
|
$3.000
|
$3.300
|
$3.450
|
$4.050
|
$5.000
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (18")(YLD TRI)
|
EA
|
43.000
|
$10.000
|
$25.000
|
$25.300
|
$29.680
|
$15.000
|
$22.000
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
2,211.000
|
$0.500
|
$0.300
|
$0.350
|
$0.400
|
$2.000
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
623.000
|
$1.000
|
$0.500
|
$0.580
|
$0.670
|
$3.000
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
2,104.000
|
$1.000
|
$0.800
|
$0.860
|
$1.010
|
$5.000
|
$0.750
|
|
|
PAV SURF PREP FOR MRK (18")(YLD TRI)
|
EA
|
63.000
|
$10.000
|
$20.000
|
$23.000
|
$26.980
|
$50.000
|
$20.000
|
|
|
INSTALL HWY TRF SIG (UPGRADE)
|
EA
|
3.000
|
$11,000.000
|
$5,225.000
|
$12,813.010
|
$3,372.200
|
$125,000.000
|
$15,400.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
16.000
|
$800.000
|
$1,000.000
|
$798.550
|
$1,348.880
|
$6,500.000
|
$960.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
|
LF
|
3,250.000
|
$2.000
|
$6.000
|
$3.130
|
$2.700
|
$6.000
|
$4.250
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
3,250.000
|
$4.000
|
$8.000
|
$3.560
|
$3.370
|
$6.000
|
$4.500
|
|
|
PED POLE ASSEMBLY
|
EA
|
5.000
|
$4,000.000
|
$5,000.000
|
$4,845.740
|
$4,721.070
|
$2,850.000
|
$6,815.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
17.000
|
$1,000.000
|
$1,000.000
|
$1,423.440
|
$1,146.550
|
$1,850.000
|
$1,971.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
2.000
|
$4,000.000
|
$5,000.000
|
$4,561.810
|
$5,395.520
|
$6,500.000
|
$6,165.000
|
|
|
REPLACE OF GROUND BOXES
|
EA
|
10.000
|
$2,100.000
|
$2,700.000
|
$1,864.190
|
$2,023.320
|
$1,000.000
|
$2,250.000
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
16.000
|
$300.000
|
$330.000
|
$406.840
|
$168.610
|
$1,000.000
|
$500.000
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
17.000
|
$200.000
|
$250.000
|
$135.650
|
$134.890
|
$500.000
|
$165.000
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
100.000
|
$300.000
|
$300.000
|
$271.000
|
$425.450
|
$500.000
|
$500.000
|
|
|
TACK COAT
|
GAL
|
13.000
|
$50.000
|
$10.000
|
$100.000
|
$31.660
|
$10.000
|
$20.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$13,000.000
|
$1.000
|
$12,438.400
|
$35,564.040
|
$20,000.000
|
$18,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
200.000
|
$300.000
|
$1.000
|
$4,500.000
|
$246.360
|
$250.000
|
$550.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
80.000
|
$200.000
|
$1.000
|
$200.000
|
$124.040
|
$85.000
|
$95.000
|
|
Totals: |
$5,113,346.500
|
$4,885,721.300
|
$5,140,008.970
|
$5,225,725.316
|
$6,868,060.000
|
$6,939,813.760
|