PREPARING ROW
|
AC
|
12.360
|
$200.000
|
$200.000
|
$300.000
|
$460.000
|
$175.000
|
$737.120
|
|
|
PREPARING ROW (TREE) (0" TO 6" DIA)
|
EA
|
25.000
|
$500.000
|
$515.000
|
$500.000
|
$225.000
|
$600.000
|
$154.780
|
|
|
PREPARING ROW (TREE) (6" TO 24" DIA)
|
EA
|
25.000
|
$1,500.000
|
$620.000
|
$600.000
|
$850.000
|
$600.000
|
$773.900
|
|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
9.000
|
$2,500.000
|
$1,000.000
|
$1,000.000
|
$4,000.000
|
$600.000
|
$2,235.720
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
610.000
|
$20.000
|
$13.000
|
$18.360
|
$13.000
|
$13.000
|
$22.930
|
|
|
BACKFILL (TY A)
|
STA
|
538.590
|
$200.000
|
$285.000
|
$232.810
|
$220.000
|
$250.000
|
$163.780
|
|
|
BLADING
|
HR
|
20.000
|
$225.000
|
$170.000
|
$233.860
|
$500.000
|
$200.000
|
$276.550
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
14.700
|
$460.000
|
$505.000
|
$529.200
|
$515.000
|
$525.000
|
$561.800
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
7,115.000
|
$5.000
|
$4.650
|
$4.270
|
$4.400
|
$1.500
|
$6.140
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
|
SY
|
15,475.000
|
$25.000
|
$23.000
|
$21.090
|
$25.000
|
$34.250
|
$27.810
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
8,401.000
|
$4.000
|
$3.950
|
$4.260
|
$3.500
|
$6.650
|
$3.230
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
25.000
|
$1,500.000
|
$2,600.000
|
$949.460
|
$930.000
|
$1,000.000
|
$963.080
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
5.000
|
$750.000
|
$770.000
|
$914.420
|
$1,000.000
|
$850.000
|
$927.540
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
73.000
|
$750.000
|
$770.000
|
$700.790
|
$700.000
|
$650.000
|
$710.840
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
39.000
|
$750.000
|
$825.000
|
$774.260
|
$765.000
|
$725.000
|
$785.370
|
|
|
RAIL (TY SSTR)
|
LF
|
175.000
|
$110.000
|
$310.000
|
$220.410
|
$205.000
|
$225.000
|
$223.570
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
35.000
|
$700.000
|
$825.000
|
$580.980
|
$610.000
|
$565.000
|
$917.220
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
8.000
|
$700.000
|
$1,100.000
|
$706.440
|
$815.000
|
$700.000
|
$1,215.310
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
4.000
|
$900.000
|
$1,200.000
|
$802.520
|
$750.000
|
$800.000
|
$1,347.160
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
24.000
|
$1,500.000
|
$1,500.000
|
$864.690
|
$965.000
|
$825.000
|
$1,719.780
|
|
|
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
|
LF
|
4.000
|
$2,000.000
|
$1,800.000
|
$926.850
|
$1,650.000
|
$900.000
|
$1,949.090
|
|
|
WINGWALL (FW - S) (HW=9 FT)
|
EA
|
1.000
|
$12,000.000
|
$42,000.000
|
$32,496.420
|
$30,500.000
|
$30,000.000
|
$47,007.370
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
1.000
|
$9,000.000
|
$7,300.000
|
$5,510.270
|
$5,200.000
|
$6,000.000
|
$8,082.980
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
|
EA
|
1.000
|
$10,000.000
|
$10,500.000
|
$7,714.360
|
$6,900.000
|
$8,000.000
|
$11,809.170
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
4.000
|
$10,000.000
|
$7,300.000
|
$7,714.370
|
$7,100.000
|
$7,950.000
|
$8,140.300
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(C)
|
EA
|
1.000
|
$12,000.000
|
$10,500.000
|
$7,714.360
|
$7,625.000
|
$8,000.000
|
$11,809.170
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
1.000
|
$12,000.000
|
$7,200.000
|
$5,651.550
|
$7,900.000
|
$6,000.000
|
$8,025.650
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$12,000.000
|
$9,400.000
|
$6,612.320
|
$7,150.000
|
$7,000.000
|
$10,433.340
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (P)
|
EA
|
1.000
|
$12,000.000
|
$30,500.000
|
$8,816.420
|
$14,250.000
|
$16,000.000
|
$33,937.030
|
|
|
SET (TY I)(S= 7 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
1.000
|
$12,000.000
|
$49,000.000
|
$20,204.310
|
$29,000.000
|
$30,100.000
|
$54,803.720
|
|
|
GRATE & FRAME
|
EA
|
21.000
|
$2,800.000
|
$3,600.000
|
$2,424.500
|
$4,800.000
|
$1,800.000
|
$4,012.820
|
|
|
REMOV STR (SET)
|
EA
|
11.000
|
$450.000
|
$1,000.000
|
$2,700.000
|
$1,700.000
|
$2,000.600
|
$1,146.520
|
|
|
REMOV STR (WINGWALL)
|
EA
|
1.000
|
$1,000.000
|
$1,000.000
|
$2,700.000
|
$1,700.000
|
$2,000.600
|
$1,146.520
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
48.000
|
$135.000
|
$105.000
|
$216.000
|
$285.000
|
$1,800.600
|
$114.650
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$670,000.000
|
$480,000.000
|
$302,700.000
|
$750,000.000
|
$750,000.000
|
$1,004,245.160
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$22,000.000
|
$31,000.000
|
$23,000.000
|
$20,000.000
|
$50,000.000
|
$45,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
525.000
|
$4.000
|
$3.350
|
$3.510
|
$7.900
|
$3.250
|
$3.730
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
525.000
|
$1.250
|
$1.550
|
$1.620
|
$3.710
|
$1.500
|
$1.720
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
610.000
|
$45.000
|
$56.500
|
$39.560
|
$36.950
|
$35.000
|
$40.130
|
|
|
CONCRETE CURB (SPECIAL)
|
LF
|
92.000
|
$50.000
|
$62.000
|
$62.170
|
$58.000
|
$55.000
|
$63.060
|
|
|
CONC SIDEWALKS (4")
|
SY
|
1,617.000
|
$85.000
|
$105.000
|
$80.370
|
$76.950
|
$71.100
|
$81.520
|
|
|
CURB RAMPS (TY 1)
|
SY
|
121.000
|
$240.000
|
$165.000
|
$204.590
|
$190.000
|
$181.000
|
$207.520
|
|
|
CONC SIDEWALKS (8")
|
SY
|
307.000
|
$115.000
|
$135.000
|
$104.270
|
$105.000
|
$92.250
|
$105.770
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
108,438.000
|
$0.150
|
$0.090
|
$0.090
|
$0.250
|
$0.300
|
$0.100
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
54,219.000
|
$0.250
|
$0.130
|
$0.090
|
$0.250
|
$0.300
|
$0.100
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
1,176.000
|
$150.000
|
$145.000
|
$96.440
|
$90.000
|
$85.320
|
$97.820
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
6,425.000
|
$42.000
|
$33.500
|
$34.970
|
$37.450
|
$32.380
|
$37.120
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$3,200.000
|
$2,900.000
|
$2,668.680
|
$2,875.000
|
$2,471.000
|
$2,833.050
|
|
|
MTL BEAM GD FEN TRANS (T6)
|
EA
|
12.000
|
$2,500.000
|
$1,200.000
|
$1,296.000
|
$1,425.000
|
$1,200.000
|
$1,375.830
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,700.000
|
$1,700.000
|
$1,809.000
|
$1,560.000
|
$1,675.000
|
$1,920.420
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
1.000
|
$1,800.000
|
$1,800.000
|
$1,836.000
|
$1,715.000
|
$1,700.000
|
$1,949.090
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,060.000
|
$3.000
|
$4.100
|
$4.320
|
$3.200
|
$4.000
|
$4.590
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
8.000
|
$250.000
|
$410.000
|
$432.000
|
$317.000
|
$4,000.000
|
$458.610
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
37.000
|
$3,700.000
|
$3,400.000
|
$3,564.000
|
$3,640.000
|
$3,300.000
|
$3,783.520
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
10.000
|
$350.000
|
$410.000
|
$432.000
|
$317.000
|
$400.000
|
$458.610
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$1,000.000
|
$1,000.000
|
$1,296.000
|
$1,055.000
|
$1,200.000
|
$1,375.830
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$1,000.000
|
$1,200.000
|
$1,620.000
|
$1,295.000
|
$1,500.000
|
$1,490.480
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
3.000
|
$150.000
|
$155.000
|
$216.000
|
$125.000
|
$175.000
|
$286.630
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
36.000
|
$1.150
|
$1.050
|
$6.390
|
$1.650
|
$1.420
|
$2.290
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
5,479.000
|
$1.850
|
$1.050
|
$1.950
|
$1.700
|
$1.420
|
$2.290
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,110.000
|
$1.500
|
$1.050
|
$1.120
|
$1.100
|
$1.040
|
$1.190
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
89.000
|
$15.000
|
$24.500
|
$25.920
|
$25.300
|
$24.000
|
$27.520
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
4.000
|
$145.000
|
$410.000
|
$432.000
|
$422.000
|
$400.000
|
$458.610
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
2.000
|
$200.000
|
$515.000
|
$540.000
|
$525.000
|
$500.000
|
$573.260
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
228.000
|
$0.450
|
$1.050
|
$1.080
|
$1.050
|
$1.000
|
$1.150
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
113,440.000
|
$0.400
|
$0.480
|
$0.510
|
$0.500
|
$0.470
|
$0.540
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
12,000.000
|
$0.450
|
$0.510
|
$0.540
|
$0.550
|
$0.500
|
$0.570
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
45,831.000
|
$0.400
|
$0.490
|
$0.860
|
$0.500
|
$0.480
|
$0.550
|
|
REFL PAV MRKR TY I-C
|
EA
|
31.000
|
$5.000
|
$10.500
|
$10.800
|
$10.500
|
$10.000
|
$11.470
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,071.000
|
$5.000
|
$5.150
|
$5.400
|
$5.300
|
$5.000
|
$5.730
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
31,355.000
|
$131.000
|
$127.000
|
$137.830
|
$132.800
|
$132.000
|
$151.660
|
|
|
TACK COAT
|
GAL
|
609.000
|
$5.500
|
$5.150
|
$8.000
|
$7.600
|
$7.000
|
$7.850
|
|
|
UNDERSEAL COURSE
|
GAL
|
70,238.000
|
$5.000
|
$3.100
|
$6.500
|
$4.600
|
$7.000
|
$4.900
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$15,000.000
|
$8,200.000
|
$9,200.000
|
$19,875.000
|
$17,500.000
|
$24,099.320
|
|
|
TMA (STATIONARY)
|
DAY
|
160.000
|
$300.000
|
$205.000
|
$400.000
|
$495.000
|
$350.000
|
$663.300
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
112.000
|
$80.000
|
$105.000
|
$110.000
|
$90.000
|
$95.000
|
$113.800
|
|
Totals: |
$7,439,115.750
|
$7,081,620.080
|
$7,194,490.008
|
$7,534,006.100
|
$7,893,287.400
|
$8,687,766.823
|