PREPARING ROW (TREE) (0" TO 6" DIA)
|
EA
|
28.000
|
$280.000
|
$500.000
|
$250.000
|
$325.000
|
$330.000
|
$100.000
|
$235.000
|
$1,800.000
|
$500.000
|
|
|
PREPARING ROW (TREE) (6" TO 24" DIA)
|
EA
|
5.000
|
$1,000.000
|
$600.000
|
$600.000
|
$745.000
|
$750.000
|
$250.000
|
$1,110.000
|
$500.000
|
$1,000.000
|
|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
1.000
|
$1,500.000
|
$1,200.000
|
$2,500.000
|
$1,755.000
|
$1,800.000
|
$500.000
|
$2,960.000
|
$1,000.000
|
$3,000.000
|
|
|
PREPARING ROW (HAND CLEARING)
|
AC
|
0.030
|
$10,714.290
|
$50,000.000
|
$50,000.000
|
$72,250.000
|
$75,000.000
|
$5,000.000
|
$22,950.000
|
$60,000.000
|
$119,000.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (7")
|
SY
|
2,895.000
|
$3.250
|
$9.000
|
$4.640
|
$9.700
|
$9.750
|
$12.000
|
$12.000
|
$20.000
|
$7.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
5,572.000
|
$15.000
|
$11.000
|
$10.000
|
$14.500
|
$15.000
|
$15.000
|
$19.000
|
$15.000
|
$5.500
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
125.000
|
$20.000
|
$40.000
|
$25.000
|
$16.500
|
$17.000
|
$15.000
|
$30.000
|
$20.000
|
$13.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
4,647.000
|
$25.000
|
$13.000
|
$28.000
|
$22.300
|
$22.500
|
$20.000
|
$19.000
|
$20.000
|
$6.500
|
|
|
BLADING
|
HR
|
3.000
|
$130.000
|
$350.000
|
$125.000
|
$160.000
|
$160.000
|
$125.000
|
$395.000
|
$60.000
|
$192.500
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
4.450
|
$1,500.000
|
$870.000
|
$957.000
|
$870.000
|
$888.000
|
$900.000
|
$920.000
|
$1,200.000
|
$1,274.000
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
4.450
|
$320.000
|
$770.000
|
$847.000
|
$770.000
|
$788.000
|
$900.000
|
$815.000
|
$1,000.000
|
$1,115.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
3,090.000
|
$2.500
|
$1.750
|
$1.930
|
$1.750
|
$1.650
|
$2.300
|
$1.850
|
$3.500
|
$3.000
|
|
|
FL BS (CMP IN PLC)(TY A OR B GR4)(10")
|
SY
|
6,932.000
|
$24.000
|
$20.000
|
$28.260
|
$26.300
|
$26.500
|
$28.000
|
$26.150
|
$40.000
|
$26.000
|
|
|
CEMENT
|
TON
|
75.000
|
$195.000
|
$175.000
|
$213.400
|
$290.000
|
$295.000
|
$200.000
|
$175.000
|
$250.000
|
$269.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
6,932.000
|
$5.000
|
$4.000
|
$3.000
|
$5.500
|
$5.750
|
$8.000
|
$6.100
|
$6.000
|
$6.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,734.000
|
$5.000
|
$5.000
|
$11.000
|
$5.500
|
$5.600
|
$12.000
|
$4.700
|
$6.000
|
$7.000
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
2,154.000
|
$5.000
|
$5.000
|
$10.000
|
$5.000
|
$5.250
|
$12.000
|
$4.400
|
$8.000
|
$5.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
242.000
|
$10.000
|
$35.000
|
$13.000
|
$31.800
|
$32.000
|
$25.000
|
$21.500
|
$15.000
|
$25.000
|
|
|
CEM STABIL BKFL
|
CY
|
152.200
|
$267.000
|
$245.000
|
$220.000
|
$433.000
|
$180.000
|
$250.000
|
$255.000
|
$250.000
|
$225.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,888.000
|
$30.000
|
$40.000
|
$30.000
|
$15.000
|
$42.000
|
$30.000
|
$40.000
|
$40.000
|
$12.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
140.000
|
$120.000
|
$121.000
|
$113.120
|
$111.000
|
$98.000
|
$95.000
|
$160.000
|
$200.000
|
$258.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
840.000
|
$225.000
|
$288.000
|
$260.070
|
$300.000
|
$275.000
|
$300.000
|
$350.000
|
$310.000
|
$438.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
57.200
|
$1,200.000
|
$1,640.000
|
$1,200.000
|
$1,330.000
|
$1,400.000
|
$1,500.000
|
$1,650.000
|
$1,400.000
|
$2,305.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
70.000
|
$1,500.000
|
$1,900.000
|
$1,200.000
|
$1,300.000
|
$1,400.000
|
$1,500.000
|
$1,550.000
|
$1,400.000
|
$2,209.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
66.600
|
$1,500.000
|
$1,800.000
|
$1,250.000
|
$1,200.000
|
$1,500.000
|
$1,500.000
|
$1,550.000
|
$1,400.000
|
$1,868.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
18,000.000
|
$26.000
|
$29.000
|
$24.000
|
$28.500
|
$28.500
|
$26.000
|
$30.000
|
$35.000
|
$32.000
|
|
|
APPROACH SLAB
|
CY
|
30.500
|
$550.000
|
$3,050.000
|
$650.000
|
$1,100.000
|
$625.000
|
$800.000
|
$735.000
|
$1,000.000
|
$996.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
2,687.640
|
$170.000
|
$224.000
|
$179.610
|
$210.000
|
$220.000
|
$210.000
|
$221.250
|
$210.000
|
$274.000
|
|
|
SILICONE RESIN PAINT FINISH
|
SF
|
2,090.000
|
$9.750
|
$2.100
|
$6.750
|
$1.900
|
$3.000
|
$4.000
|
$1.850
|
$10.000
|
$2.500
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
69.800
|
$500.000
|
$560.000
|
$500.000
|
$582.000
|
$475.000
|
$700.000
|
$565.000
|
$600.000
|
$1,018.000
|
|
|
RAIL (TY T223)
|
LF
|
960.000
|
$110.000
|
$100.000
|
$125.000
|
$145.000
|
$140.000
|
$130.000
|
$140.000
|
$120.000
|
$155.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
LF
|
120.000
|
$110.000
|
$106.000
|
$150.000
|
$300.000
|
$190.000
|
$180.000
|
$230.000
|
$150.000
|
$247.000
|
|
|
GABION MATTRESSES (GALV)(12 IN)
|
SY
|
15.000
|
$130.000
|
$170.000
|
$85.000
|
$445.000
|
$150.000
|
$200.000
|
$215.000
|
$300.000
|
$215.000
|
|
|
GABION MATTRESSES (GALV) (24 IN)
|
SY
|
4.000
|
$130.000
|
$200.000
|
$250.000
|
$1,500.000
|
$400.000
|
$250.000
|
$395.000
|
$500.000
|
$436.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
36.000
|
$175.000
|
$300.000
|
$88.400
|
$160.000
|
$130.000
|
$100.000
|
$210.000
|
$125.000
|
$336.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$2,500.000
|
$2,000.000
|
$1,685.800
|
$3,200.000
|
$1,550.000
|
$2,400.000
|
$3,750.000
|
$3,000.000
|
$4,200.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$1,700.000
|
$2,000.000
|
$2,200.000
|
$1,600.000
|
$2,000.000
|
$6,000.000
|
$2,160.000
|
$2,000.000
|
$4,318.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
4.000
|
$1,000.000
|
$2,000.000
|
$1,500.000
|
$1,285.000
|
$1,000.000
|
$1,000.000
|
$1,165.000
|
$500.000
|
$1,320.000
|
|
|
REMOV STR (PIPE)
|
LF
|
112.000
|
$64.000
|
$25.000
|
$25.000
|
$25.000
|
$25.000
|
$25.000
|
$42.000
|
$25.000
|
$110.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$141,000.000
|
$82,500.000
|
$145,200.000
|
$93,000.000
|
$80,000.000
|
$250,000.000
|
$84,250.000
|
$150,000.000
|
$203,492.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
169.000
|
$5.000
|
$20.000
|
$6.000
|
$8.000
|
$5.000
|
$5.000
|
$6.400
|
$5.000
|
$3.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$250,000.000
|
$195,000.000
|
$367,933.120
|
$302,000.000
|
$350,000.000
|
$400,000.000
|
$401,000.000
|
$345,000.000
|
$400,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$10,000.000
|
$9,000.000
|
$1,500.000
|
$1,075.000
|
$8,800.000
|
$2,000.000
|
$17,500.000
|
$8,000.000
|
$8,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
100.000
|
$2.500
|
$7.000
|
$13.200
|
$12.000
|
$15.000
|
$5.000
|
$4.750
|
$5.000
|
$9.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
100.000
|
$1.000
|
$2.000
|
$2.200
|
$2.000
|
$5.000
|
$1.000
|
$2.650
|
$2.000
|
$5.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
550.000
|
$5.000
|
$7.000
|
$4.000
|
$3.500
|
$3.650
|
$7.000
|
$7.150
|
$6.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
550.000
|
$1.500
|
$2.000
|
$1.080
|
$0.900
|
$2.000
|
$1.000
|
$4.800
|
$2.000
|
$2.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
2,130.000
|
$15.000
|
$10.000
|
$22.570
|
$10.750
|
$23.000
|
$40.000
|
$15.000
|
$30.000
|
$15.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
2,130.000
|
$10.000
|
$5.000
|
$11.570
|
$7.500
|
$18.000
|
$10.000
|
$11.500
|
$7.000
|
$5.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
2,130.000
|
$15.000
|
$6.000
|
$17.070
|
$8.750
|
$23.000
|
$15.000
|
$15.000
|
$30.000
|
$10.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
350.000
|
$27.000
|
$30.000
|
$27.500
|
$25.000
|
$26.000
|
$35.000
|
$31.650
|
$28.000
|
$41.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,350.000
|
$2,400.000
|
$1,760.000
|
$1,600.000
|
$1,700.000
|
$2,000.000
|
$2,535.000
|
$2,000.000
|
$3,200.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,375.000
|
$1,575.000
|
$1,320.000
|
$1,200.000
|
$1,300.000
|
$1,500.000
|
$1,720.000
|
$1,600.000
|
$2,100.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
600.000
|
$3.500
|
$3.000
|
$1.930
|
$2.000
|
$4.750
|
$3.000
|
$3.150
|
$2.000
|
$4.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$425.000
|
$300.000
|
$220.000
|
$225.000
|
$400.000
|
$350.000
|
$315.000
|
$500.000
|
$410.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,275.000
|
$3,100.000
|
$3,080.000
|
$2,800.000
|
$2,900.000
|
$2,900.000
|
$3,270.000
|
$2,800.000
|
$4,230.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
476.000
|
$15.000
|
$22.500
|
$24.750
|
$12.000
|
$20.000
|
$15.000
|
$23.750
|
$20.000
|
$30.000
|
|
|
WIRE FENCE (WATER GAP)
|
LF
|
60.000
|
$48.000
|
$35.000
|
$39.200
|
$50.000
|
$125.000
|
$40.000
|
$36.950
|
$65.000
|
$48.000
|
|
|
CORNER OR PULL POST AM(REM/REP)(METAL)
|
EA
|
15.000
|
$500.000
|
$250.000
|
$280.000
|
$1,100.000
|
$1,000.000
|
$250.000
|
$265.000
|
$400.000
|
$341.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$750.000
|
$760.000
|
$836.000
|
$550.000
|
$800.000
|
$600.000
|
$800.000
|
$800.000
|
$1,036.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$850.000
|
$900.000
|
$990.000
|
$800.000
|
$850.000
|
$700.000
|
$950.000
|
$800.000
|
$1,230.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$110.000
|
$100.000
|
$112.000
|
$50.000
|
$135.000
|
$200.000
|
$105.000
|
$200.000
|
$136.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
12.000
|
$21.000
|
$15.000
|
$22.000
|
$20.000
|
$25.000
|
$15.000
|
$19.000
|
$30.000
|
$25.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
24.000
|
$14.000
|
$20.000
|
$16.800
|
$10.000
|
$15.000
|
$10.000
|
$15.850
|
$10.000
|
$57.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$37.000
|
$35.000
|
$33.000
|
$30.000
|
$40.000
|
$50.000
|
$36.950
|
$50.000
|
$47.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
20.000
|
$22.000
|
$200.000
|
$220.000
|
$200.000
|
$35.000
|
$200.000
|
$210.000
|
$5.000
|
$272.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
466.000
|
$1.000
|
$1.000
|
$1.150
|
$1.000
|
$1.000
|
$1.000
|
$1.200
|
$5.000
|
$2.100
|
|
|
PAVEMENT SEALER 4"
|
LF
|
490.000
|
$1.750
|
$1.000
|
$1.100
|
$1.000
|
$1.000
|
$1.200
|
$1.050
|
$2.000
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
4,290.000
|
$0.400
|
$0.750
|
$0.830
|
$0.750
|
$1.000
|
$1.100
|
$0.790
|
$2.000
|
$0.800
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
3,940.000
|
$0.400
|
$0.750
|
$0.830
|
$0.750
|
$1.000
|
$1.100
|
$0.790
|
$2.000
|
$0.800
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
490.000
|
$1.500
|
$1.000
|
$1.100
|
$1.000
|
$1.000
|
$1.200
|
$1.050
|
$2.000
|
$1.100
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$60,000.000
|
$15,000.000
|
$55,000.000
|
$40,000.000
|
$26,000.000
|
$40,000.000
|
$58,200.000
|
$80,000.000
|
$75,000.000
|
|
|
SP MIXES SP-D SAC-A PG70-22
|
TON
|
1,683.000
|
$180.000
|
$160.000
|
$205.530
|
$162.000
|
$164.000
|
$230.000
|
$151.500
|
$175.000
|
$140.000
|
|
|
TACK COAT
|
GAL
|
901.000
|
$4.000
|
$3.500
|
$10.000
|
$8.800
|
$9.000
|
$12.000
|
$3.500
|
$4.000
|
$9.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$200.000
|
$500.000
|
$350.000
|
$225.000
|
$500.000
|
$1,500.000
|
$210.000
|
$2,000.000
|
$21.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$12,000.000
|
$16,000.000
|
$30,000.000
|
$13,000.000
|
$16,000.000
|
$21,735.000
|
$4,000.000
|
$25,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
406.000
|
$375.000
|
$75.000
|
$150.000
|
$185.000
|
$125.000
|
$190.000
|
$300.000
|
$150.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
20.000
|
$70.000
|
$35.000
|
$90.000
|
$60.000
|
$200.000
|
$100.000
|
$75.000
|
$50.000
|
$80.000
|
|
Totals: |
$3,412,135.379
|
$3,371,388.860
|
$3,427,047.150
|
$3,485,134.200
|
$3,648,950.150
|
$3,924,991.400
|
$4,017,158.800
|
$4,076,421.400
|
$4,237,946.710
|